Showing 35 items
matching eppalock dam
-
Bendigo Historical Society Inc.
Document - STATE RIVERS AND WATER SUPPLY COMMISSION : GENERAL DESCRIPTION AND PARTICULARS OF EPPALOCK PROJECT, 1/08/1961
State Rivers and Water Supply Commission. Seven page typed document titled 'General description and particulars of the Eppalock Project.' Subheadings: General, Administration and Works Installation, Field laboratory, Construction programme, Design statistics, Major items of plant in use on the project, Progress to 1st August 1961, Eppalock Reservoir Locality Plan (diagram), Eppalock project works area & arrangement plan (diagram), Eppalock Project cross section of dam along? tunnel (diagram).state infrastructure, water supply, coliban system, state rivers and water supply commission. coliban system. eppalock. -
Bendigo Historical Society Inc.
Slide - DAVID MCDONALD COLLECTION: EPPALOCK. CONSTRUCTION, c1960
Eppalock. Construction. Construction of the water outlet under the wall of the dam, near the water tower.Agfacolorcivil engineering, water supply, eppalock -
Bendigo Historical Society Inc.
Slide - VAL DENSWORTH COLLECTION: DRY LAKE EPPALOCK, May 2004
Slide. Dry Lake Eppalock. A body of water at the tower near the dam wall.slide, bendigo, dry lake eppalock., dry lake eppalock. -
Bendigo Historical Society Inc.
Newspaper - NEWSPAPER ARTICLE: EPPALOCK RESERVOIR CONSTRUCTION ' ADVERTISER ' REPORT 2.9.1961
Aged , partly damaged Newspaper article -Eppalock Reservoir Construction '-The Bendigo Advertiser ' Report 2.9.1961 / photo of excavations prior to commencement of the Dam Wall -/bendigo, newspapers, bendigo advertiser, eppalock reservoir construction -
Bendigo Historical Society Inc.
Newspaper - JENNY FOLEY COLLECTION: WHEN IT WAS FULL
BHS CollectionBendigo advertiser ''The way we were'' from 2003. When it was full: Brian Hollingworth of Epsom, supplied this photograph of the construction of the tower access bridge at lake Eppalock in 1962, just after the dam was completed. The bridge, which reaches to the intake tower, took about two months to build. It was built on the bank in sections and lowered into the water. The end of the bridge lay under 20 metres of water until lifted and placed into position. The clip is in a folder.newspaper, bendigo advertiser, the way we were