Showing 446 items
matching trackworks
-
Melbourne Tram Museum
Pamphlet, Yarra Trams, "Tram Network Upgrade - Track Renewal - Wallen Road Hawthorn", Nov. 2016
.1 - Pamphlet, A4, full colour printed on gloss paper titled "Tram Network Upgrade - Track Renewal -0 Wallen Road Hawthorn", advising of the proposal to replace the tram track on the Hawthorn Bridge, Wallen Road, 3/1/2017 to 9/1/2017. .2 - ditto, a latter version with more information on the rear page - added 20-1-17trams, tramways, trackwork, hawthorn bridge, bridges, wallen rd -
Melbourne Tram Museum
Document - Photocopy, Melbourne & Metropolitan Tramways Board (MMTB), "Permanent Way Standards", Original 1954
Photocopy onto a foolscap sheet of paper titled "Permanent Way Standards", providing design, construction and maintenance - provides limits - desirable and max/min. Has "R. Vanselow" in top left hand corner. P drawing 912357?? Dated 30/5/54, signed D. EtkinsIn top left hand corner "1954 MMTB"trams, tramways, trackwork, standards, mmtb, construction, maintenance -
Melbourne Tram Museum
Magazine, Royal Automobile club of Victoria (RACv), "Growing Pains", Oct. 2019
"Growing Pains" by Sue Hewitt Article from the RACV magazine Royalauto about Melbourne's road congestion. Although the article doesn't mention trams it features two photos of the St Kilda Rd tramways. First photo from 1925 shows construction of tramway at St Kilda Rd and Domain Road. Second photo shows Metro Tunnel Project's ANZAC station at same intersection in 2019.trams, tramways, track construction, trackwork, track laying, metro tunnel, anzac station, domain junction -
Melbourne Tram Museum
Pamphlet, Yarra Trams, "Tram guide to St Kilda Festival", Feb. 2014
Pamphlet - 3 fold DL full colour - titled on one side "Tram guide to St Kilda Festival" for Sunday 9 Feb. 2014 and on the other "Important Tram Service Changes" covering track maintenance work on St Kilda Road routes between Southbank Boulevard and Park St for Saturday 8 Feb. 2014. Shows relevant maps and re-routing of trams by Sturt St and Kingsway. Two copies held.trams, tramways, st kilda rd, trackwork, festival, st kilda -
Melbourne Tram Museum
Pamphlet, Yarra Trams, "Tram Improvement work - Power Street and Burwood Road Hawthorn", Jun. 2015
Pamphlet, A4, full colour printed on gloss paper titled "Tram Improvement work - Power Street and Burwood Road Hawthorn" - Saturday 27 June to Monday 29 June 2015/ Gives notes on works, impacts to services and a map along with contact details. 2nd update.trams, tramways, trackwork, power st, burwood rd -
Melbourne Tram Museum
Pamphlet - Hanging strip type notice, Public Transport Victoria (PTV), Track renewal works on Collins and Spencer streets, 2023
Provides tram information for track renewal works in Melbourne's CBD. Contains a link for further information. Yields information about tram service and timetable changes.Hanging strip type notice for track renewal works on Collins and Spencer streets in July 2023. Also includes PDF from Yarra Trams website providing detailed information about the works.trams, tramways, spencer st, collins st, trackwork -
Melbourne Tram Museum
Document - Project Notice, Yarra Trams, "Collins St and Spencer St junction renewal works", June 2023
Project notice for - "Collins St and Spencer St junction renewal works" - Gives details of alternative arrangements, walking around the works, tram service changes, maps and timing for the works. Work scheduled 30/6/2023 to 9/7/2023. The last time that the junction was relaid was during 2011.Yields information about the renewal of the Collins St and Spencer St junction track work.Notice - 3 A4 page document - pdf version downloaded and printed version.tramways, public transport, collins st, spencer st, trackwork -
Melbourne Tram Museum
Ephemera - Route 58, "Tram Network upgrade", June 2023
Provides details of track replacement work on route 58 in Melville Road, Pascoe Vale south / Brunswick West between 18/8/2023 to 18/9/2023.Yields information about track replacement work in Melville Road.Five A4 page document - printed.tramways, trackwork, melville road, brunswick west, pascoe vale south, route 58 -
Melbourne Tram Museum
Document - Report, Melbourne & Metropolitan Tramways Board (MMTB), "Nicholson St Coburg - Single track lighting", 15/02/1960 12:00:00 AM
Report - carbon copy of 2 typed foolscap yellow sheets, titled "Nicholson St Coburg - Single track lighting", dated 15/2/1960 from D. H. Eakins, Chief Engineer to the Chairman. Looks at a proposal by the Distribution Engineer to automatically switch on and off lighting along sections of the Coburg line, using lighting similar to that used when track reconstruction works undertaken, illumination levels, costs, operation, switching and maintenance.trams, tramways, nicholson st, coburg, lights, trackwork -
Melbourne Tram Museum
Document - Tender Document, Melbourne & Metropolitan Tramways Board (MMTB), "Supply and Delivery of Blue Stone Screenings and 1.5 inch metal", Jan. 1921
Tender document - MMTB - 7 sheets - some pre-printed and some typed with hand written notes titled "Supply and Delivery of Blue Stone Screenings and 1.5 inch metal", for Contract No. 107. Stapled along the left hand side. Only the first page and the schedule of Prices have been scanned. Has the Conditions of tendering, contract etc. \ Total material to be tendered for was 4050 tons, to be delivered to either Burley, Hawthorn, Camberwell, Tooronga or Malvern railway sidings at the rate of a total 345 tons per week. Authorised by S. Dix, 12/1/1921.trams, tramways, ballast, tenders, trackwork, track repairs -
Melbourne Tram Museum
Document - Report, Melbourne & Metropolitan Tramways Board (MMTB), "Tracks at Tram Termini", Dec. 1959
Report - one quarto sheet and two double foolscap - carbon copies of a report titled "Tracks at Tram Termini", dated 14/12/1959 listing the track arrangements at each terminus, length, whether ballasted or concreted, estimated remaining life and value. Prepared by the Chief Engineer for the Chairman. Includes some of the Footscray lines, but not West Maribyrnong, Essendon Airport or Point Ormondtrams, tramways, terminus, trackwork, maintenance -
Melbourne Tram Museum
Document - Tender Document, Melbourne & Metropolitan Tramways Board (MMTB), "Supply and Delivery of Points and Crossings", Oct. 1920
Tender document - MMTB - 12 sheets - some pre-printed and some typed with hand written notes titled "Supply and Delivery of Points and Crossings", for Contract No. 106. Stapled along the left hand side. Only the first page and the schedules have been scanned. Has the Conditions of tendering, contract etc. Requests 2 switch points, 1 mate, 1 compound mate and two crossings. Tender was to close on Monday 11/10/1920.trams, tramways, points, pointwork, trackwork, tenders, specification -
Melbourne Tram Museum
Slide - Set of 7, Keith Caldwell, 17/06/1971 12:00:00 AM
Set of seven Agfa colour slide, blue and white plastic mount, photo by Keith Caldwell of a track deviation during the construction of the Alexandria Avenue underpass at the north end of St Kilda Road. Shows the deviation, temporary track ("on the fly), overhead works and after the bridge has been completed, the permanent track brought into use.. All have the Arts Centre in the background. Slides 1 to 4 - 17/6/1971, 5 to 7 - 20/6/1971, after the change over from the temporary track to the permanent track. .1 - W6 919 outbound, East Malvern Route 3 - has a large gantry beam in the background and an advertisement for briquettes and Norton Bear tape. In the background is the National Gallery of Victoria building. .2 - W2 819 outbound, route 8 Toorak, with Shrine of Remembrance in the background. .3 - W2 389 ditto for Glen Iris, Route 6 .4 - W2 349 outbound for East Brighton, route 64 and inbound W2 633, city, route 67. .5 - SW6 854 inbound using the new track on the bridge, but temporary track remains in front of the tram. Overhead crews at work. W5 768 following. Both trams are travelling on the wrong line or "bang road" Tram have a Stillwell Ford and Ferris Car radio adverts. .6 - SW6 905 inbound, route 67. Also running wrong line. In the background is a rail mounted overhead trolley tower and Bedford truck MZR129. .7 - SW6 845 in bound route 8 followed by SW6 854, route 72. Both trams are running on the wrong line. An excavator in the background is working on removing the deviation track. 845 has various adverts including one for Uniroyal Tyres..1 has in pencil "17.6.71" and "Alex Av Opass constrn" and .7 "20.6.71"trams, tramways, st kilda rd, temporary track, trackwork, overhead, alexandra ave, princes bridge, bridges, route 3, route 67, route 64, route 8, route 6, route 72, w6 class, w2 class, tram 919, tram 905, tram 819, tram 389, tram 349, tram 633, tram 854, tram 768, tram 845, tram 854 -
Melbourne Tram Museum
Pamphlet, Public Transport Victoria (PTV), "We're upgrading two William Street tram stops so everyone can catch the tram", Sep. 2019
A4 size, 2 fold A3 paper pamphlet, printed in colour titled "We're upgrading two William Street tram stops so everyone can catch the tram" outlining the proposed reconstruction of William St Melbourne, between Flinders Lane and Dudley St, including the William Street sidings. Includes new super stops at Bourke and La Trobe St, Gives dates of drop in information sessions. Works planned for late November for two weeks. Published by PTV / Transport for Victoria September 2019.trams, tramways, william st, superstops, trackwork, maintenance -
Melbourne Tram Museum
Pamphlet, Public Transport Victoria (PTV), "Bus replace trams - tram route 96", Apr. 2019
Pamphlet - 4 fold DL full colour, titled "Bus replace trams - tram route 96" for the period 10 May to 18 May 2019, to undertake track work and installation of super stops in Nicholson St north of Holden St. Has alternative transport routes and stop changes. Shows the map of work and alternative services. Has the Transport for Victoria, Yarra Trams and PTV logos. Published April 2019. See Reg Item 3630 for other associated documents for this project.trams, tramways, nicholson st, route 96, trackwork, superstops, yarra trams -
Melbourne Tram Museum
Photograph - Set of 6 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), c1959
Series of six black and white photographs of plastic coated rail being sprayed and laid in Swan St Richmond during the late 1950's. Includes photos of a sample rail, application and the location between the treated and untreated rail. See also Reg item 4517 On the photographic box with the photos was a date "11/59" - See MMTB Board minute of 22/1/1959 for a mention of this.trams, tramways, track laying, track materials, trackwork, swan st, rails -
Melbourne Tram Museum
Photograph - Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), late 1964
Black and white photographs of Swan St Richmond looking east from near Punt Road - shows the plastic coated rail laid during the late 1950's. See also Reg item 4516 for photos of the methodology. On the photographic box with the photos was a date "11/59"trams, tramways, track laying, track materials, trackwork, swan st, rails -
Melbourne Tram Museum
Photograph - Set of 6 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1974
Series of six black and white photographs of "MacDonald Johnston" street sweeper, City of Preston on a Ford chassis. Possibly the MMTB was looking at a similar model and ascertaining whether it would be suitable for sweeping and vacuuming sand off tram track. On the outside of the box has "Street Cleaning Preston CC - Truck Johnson" Based on the Registration plate - LMB - a 1974 plate - see https://en.wikipedia.org/wiki/Vehicle_registration_plates_of_Victoria accessed 24/4/2020trams, tramways, city of preston, trackwork, cleaning, rails, ford motor company, macdonald johnston, mmtb -
Melbourne Tram Museum
Photograph - Set of 4 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1966
Series of 4 black and white photographs of the construction of three tracks or roads at East Preston Depot 7/1955. .1 - Mud mining - earthworks with the Stately Shoe and Wall Bros buildings in the view. .2 - showing one track complete with a second underway, .3 - two tracks complete with a third just in the view. .4 - pouring concrete at the depot - bicycle shed?trams, tramways, east preston, construction, trackwork, tram depot, track materials -
Melbourne Tram Museum
Photograph - Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), c1940
Black and white photographs of the rail fastening mechanism or method at a tram depot pit rail, such as East Preston depot. Shows the method of fixing and adjusting the rail gauge.trams, tramways, trackwork, depots, inspection -
Melbourne Tram Museum
Photograph - Set of 15 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1950's
Series of 15 black and white photographs of the track works to reconstruct tram lines showing various methods and works during the 1960's. .1 - Jackhammers concrete out around wooden sleepers - the rails have been bolted to them. .2 - Excavated track or temporary track next to newly relaid track - Hawthorn Road by Caulfield Park? .3 - Partly completed work - nearest track relaid, second track still has wood blocks? and then a temporary track. .4 - Excavated previously concreted and bolted track. Appears to be new rail. .5 - Compacting a new track bed with work laying track in the background. .6 - Rail being craned into position onto small concrete blocks - Nicholson St North Fitzroy at Church St - the church is now Melbourne City Mission Palliative care centre. 1955/56 - construction of the replacement track. Note the Hail bus stop sign on the corner. .7 - Thermite welding being set up. .8 - after a Thermite welding joint completed. .9 - track reading for pouting concrete, with a rebuilt track alongside and temporary track on the other side. .10 - ditto .11 - Concrete being poured .12 - ditto - could be Maribyrnong Road bridge replacement. .13 - Screeding off the concrete - possibly Nicholson St North Fitzroy .14 - completed surface - location as above .15 - completed surface with cloth covers to assist the concrete being cured. Has a MMTB hut and two worker amenity buses alongside. - location as above.Some photos have pencil marks on rear.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment, concrete, welding, nicholson st, new tramway, buses -
Melbourne Tram Museum
Photograph - Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), Nov. 1959
Black and white photographs of the temporary track being completed during the first stage of the construction of the King St overpass in Flinders St. looking west. shows work being completed. Reg Item 4274 by Keith Kings dates the work to mid Nov. 1959.Some photos have pencil marks on rear.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment, flinders st, king st, kingsway -
Melbourne Tram Museum
Photograph - Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), late 1968
Black and white photographs of the preparation for track laying in Queensway - St Kilda Junction project late 1968.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment, queensway -
Melbourne Tram Museum
Album - Photo Album, Transit Australia Publishing, "TAP - Part F - Miscellaneous", 1950's to 1990's
Photo Album - titled "TAP - Part G - Miscellaneous - Sheets G1 to G14", from Transit Australia Publishing. Photos used in the Destination City and other publications series. For a detailed list of photographs see htd4606i.pdf - Miscellaneous For individual photo images see: \dbtext\hawthtramcoll\photo collections\TAP-Part F, images TAP396 to TAP435. TAP396_272-646_VictoriaPde_RayMarsh.jpg TAP397_922_PrestonWorkshops_April1993_NormCross.jpg TAP398_937_Restaurant_SpencerSt_EarlEwers.jpg TAP399_RipponleaDestination.jpg TAP400_Wheels-etc-noise-reduction_MMTB.jpg TAP401_MaribyrnongBridge-single-track_c1942-3_PWDuckettColln.jpg TAP402_MaribyrnongBridge-doubletrack_PWDuckettColln.jpg TAP403_MaribyrnongBridge-from-tram_PWDuckett.jpg TAP404_961_ElizabethSt-trolleypole-and-arc-shield_WJohnWebster_28Sep1953.jpg TAP405_OverheadCrossing_Glenferrie-RiversdaleRds_26Sep53_WJohnWebster.jpg TAP406_MalvernDepot_26Sep53_WJohnWebster.jpg TAP407_BundyClock_Elsternwick_25Sep53_WJohnWebster.jpg TAP408_PleaseStepInside-sign_721_25Sep53_WJohnWebster.jpg TAP409-TramStopSign_WilliamRd-MalvernRd_23Sep53_WJohnWebster.jpg TAP410_SafetyZone_FitzroySt_25Sep53_WJohnWebster.jpg TAP411-TramStopSign_Ryrie-MooraboolSt_Geelong_24Sep53_WJohnWebster.jpg TAP412_NeonSign_GlenferrieRd_26Sep53_WJohnWebster.jpg TAP413_HailCarsHere_FitzroySt_25Sep53_WJohnWebster.jpg TAP414_Maintenance-staff-Malvern_Jan1922.jpg TAP415_TrackRepair_StKIldaRd_25Sep53_WJohnWebster.jpg TAP416_TrackWork_VictoriaPde-at-GisborneSt_1950_PeterDuckett-colln.jpg TAP417_VictoriaPde-just-before_LatrobeSt tramway-built_22Sep1950.jpg TAP418_VictoriaPde_new-LatrobeSt tramway_c1950.jpg TAP419_762-temporary-track_LygonS-near-ElginSt_WalJack_Jun1953.jpg TAP420_Trackwork_MalvernTownHall_PWDuckett_May1987.jpg TAP421_Trackwork_MalvernTownHall_PWDuckett_May1987.jpg TAP422_Trackwork_MalvernTownHall_PWDuckett_May1987.jpg TAP423_Trackwork_MalvernTownHall_PWDuckett_May1987.jpg TAP424_track-open-field_PWDuckett_Colln.jpg TAP425_track-open-field_PWDuckett_Colln.jpg TAP426_546_pantograph-test_Preston_ GraemeTurnbull.jpg TAP427_442_Restaurant-WilliamScott_May1984.jpg TAP428_RecruitingTram_Malvern_1915_MMTB.jpg TAP429_R10_2029_BourkeSt_HughBallment_Dec1992.jpg TAP430_214_works-train_RoyalPark_c1925.jpg TAP431_StKildaJunction-from-hotel_PeterDuckettColln.jpg TAP432_512_Seattle_Oct1990_IanCooper.jpg TAP433_648_Duncoe-at-MarketSt_WCWhittaker.jpg TAP434_178-869_CarlisleSt_JimSeletto_1960.jpg TAP435_FootscrayDepot_last-night_1962_JimSeletto.jpgtrams, tramways, transit australia, destination city, tramcars, depots, emergency, trackwork, bundy clock, signs, tram stops, pantographs, preston workshops, maribyrnong river bridge, tram 272, tram 646, tram 922, tram 937, tram 961, tram 762, tram 546, tram 442, tram 214, tram 512, tram 648, tram 178, tram 869 -
Melbourne Tram Museum
Letter, Yarra Trams, "Tram track renewal and tram stop upgrade works", 1/06/2012 12:00:00 AM
Set of two A4 sheets, printed both sides, titled "Tram track renewal and tram stop upgrade works", for the reconstruction of the intersection of Power Street, Wallen Road and Riversdale Rd.", Saturday 30/6 to 5/7/2012. Work included the construction of the platform stop, relocation of the cross over from Riversdale Rd to Wallen Road and the reconstruction of the track into the Hawthorn depot. Gives timetable for works, access arrangements for the apartments and the tram depot. Has a map showing work locations. Dated 18/6 and 22/6/2012, signed by John Uiterwijk, Manager Renewals Yarra Trams.trams, tramways, yarra trams, trackwork, wallen rd, riversdale road, riversdale junction, power st, hawthorn depot -
Melbourne Tram Museum
Functional object - Material sample, rubber boot for a rail, 2002
Material sample - rubber boot and associated notes: 1 - rubber extruded section that was secured around the base and sides of the rail and held in position with metal clips. Made for 41 kg/m tramway rail. 2 -Note printed on A4 paper about the section, its use, where and who - John Holland 2002, between Union Road and Box Hill, enables some track resilience and electrical isolation. 3 - Envelope addressed to Keith Kings from Ken Hall of Preston Workshops with a hand written note about the product and its use. Received August 2003trams, tramways, trackwork, box hill, track construction, rails, civil engineering, tram 106 -
Melbourne Tram Museum
Photograph - Digital Image, Sydney Road, Coburg, looking south from near Bell St, c1920
Digital Image of Sydney Road, Coburg, looking south from near Bell St, showing the track repair work to remove bricks from the rails that were resulting in damage to the track foundations by letting water into the track. Photo supplied for identification purposes May 2020, by the Editor, Australian Railway History - see htd4680doc for email correspondence. Image belongs to the ARHS NSW Div. Rail Resource Centre No. 117413 Was used in the June 2020 issue of Australian Railway History - see Reg Item 4684. In the background are the Commercial Bank of Australia, A. M. Hadden Chemist, Walkers Stores, Joblings Boots, a Lending Library with advertisements for "The Age", "The Argus" and "The Herald".trams, tramways, sydney road, coburg, track repairs, trackwork -
Melbourne Tram Museum
Newspaper, Kay Oddie, North and West Melbourne News, "Cable tram rails have their moment in the sun", Apr. 2007
Newspaper clipping from the April 2007 issue of North and West Melbourne News, titled "Cable tram rails have their moment in the sun", about the unearthing of cable tram track in Abbotsford St. Provides notes on the cable tram system, the works and Heritage Victoria Activities. Information provided by Kay Oddie, with some photos. See Reg item 4704 for correspondence concerning this track. Has the masthead of the newspaper stapled to the top left hand corner. Not imaged.trams, tramways, cable trams, abbotsford st, north melbourne, trackwork, closure, tram 13 -
Melbourne Tram Museum
Administrative record - Correspondence, Heritage Victoria, "Roadworks reveal artefacts from Melbourne's cable tram cars", 4/2007 to 9/2007
Set of 6 sets of correspondence or notifications regarding the Abbotsford St North Melbourne cable tram discovered following roadworks during May 2007. Comprises 18 A4 sheet 1 - Press release from Heritage Victoria titled "Roadworks reveal artefacts from Melbourne's cable tram cars", advising of a Interim Protection Order. 2 - Letter to Keith Kings from Kay Oddie re Council involvement and other parties - dated 27/6/2007. 3 - Victorian Heritage Register VHR H0988, dated 10/7/2007 adding the track - has details and photographs - interim pending consultation. 4 - Letter to Keith Kings from Kay Oddie re Council involvement and other parties - dated 11/7/2007. 5 - Keith Kings handwritten notes regarding the history of the lines. 6 - E-mail to Graham Jordan dated 3/9/2008 forwarding a copy of Kay Oddie's submission to Heritage Victoria and letter. Scanned as a single pdf file.trams, tramways, cable trams, abbotsford st, north melbourne, trackwork, closure -
Melbourne Tram Museum
Pamphlet, Transport for Victoria, "Wellington Parade tram terminus upgrade", Nov. 2019
.1 - Pamphlet - folded A3 to A4, titled "Wellington Parade tram terminus upgrade" to provide a set of scissors cross overs a the Simpson St siding, improved safety for crews, pedestrians and for use during particularly special events. Has a map showing the extent of works, pedestrian crossings and car parks changes. Also shows two toilet blocks for crews in grey. On the rear has the dates for the drop in session. Has the PTV, Transport for Victoria and Yarra Trams logos. .2 - Pamphlet - 3 fold DL - printed on off white paper, titled "Buses replace Trams" - 25/10 to 1/11 Set of five digital images of pamphlets collected from Yarra Trams website 14-10-2020trams, tramways, wellington parade, simpson st, trackwork, construction, terminus, crossover