Document - NEW CHUM & VICTORIA - NEW CHUM & VICTORIA MINE MANAGERS REPORTS
Handwritten copies from New Chum & Victoria Mine Managers Reports. 9/11/1888 Cage caught in shaft reported by Wm Grigg. 9/11/1888 More abouth the cage being caught, reported by Mine manager R Jackson. 4/1/1889 Replaced rings in eastern winding engine. No water for 2 days as main burst at Bendigo Creek. 18/1/1889 East boiler leaking. Boilermakers in. Still leaked. 1/2/1889 East battery repaired. 15/2/1889 Water in shaft 15 galls an hour. Total depth from surface 2,134 feet. Wm Vinnard. M. Man. 7/6/1899 Firewood in stock, at ?indes, 552 tons at battery. Urgently require a 2nd boiler. Can only wind for 20 minutes, then stop for steam to rise before hauling. J Agnew Mine Manager.document, gold, new chum & victoria, new chum & victoria, new chum & victoria mine managers reports, wm grigg, r jackson, wm vinnard, j agnew -
Bendigo Historical Society Inc.
Newspaper - NEW CHUM RAILWAY MINE - LAST YEARS OF MINE CAPTURED IN POSTCARD FORM
Newspaper article titled 'Last Years of Mine captured in Postcard Form' from the Bendigo Miner, Thursday, December 15, 2011 by Ian Fenselau. Article mentions some history of the mine, how it got it's name, depth of the mine and it's comparison with the Victoria Reef Quartz. It also mentions the death of James Nolan when he fell down the shaft and studies of ventilation released by Dr Walter Summons. The machinery foundations are still visible in Golden Square.newspaper, bendigo, the bendigo miner, new chum railway mine, last years of mine captured in postcard form, ian fenselau, victoria reef quartz mine, james nolan, dr walter summons -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - NEW CHUM MINES DRAINAGE PROBLEMS 1910
Handwritten extract from the Bendigo Advertiser 20/8/1910 Page 8. ''New Chum Mines. Unwatering of the deep levels is being carried on as expeditionsly as was expected by the authorities. In the last four days, the water has only been lowered 14 feet at the Victoria Quartz Mine. The water stood at the 3,226 feet level yesterday. The slow progress being made this week is no doubt due to the large quantity in the workings at some of the levels.'' From the Bendigo Advertiser 27/8/1910 Page 9. ''New Chum Mines. Very slow progress being made. At Victoria Quartz, the water was lowered 32 feet for the week, and is now at 3258 feet. New Chum Railway lowered the water 17 feet and the present level of the water is at 1796 feet. The Lazarus are raising water from 2157 feet. The water has ceased flowing into the New Chum and Victoria through the connecting level with the Lazarus Mine at about 2,500 feet. As the Victoria Quartz is down 4,614 feet, there is still a considerable quantity of water to get out before sinking of the shaft can be resumed.''document, gold, drainage problems, drainage problems, new chum mines drainage problems 1910, bendigo advertiser 20/8/1910 page 8 & 27/8/1910 page 9, new chum mines, victoria quartz, new chum railway, lazarus, new chum and victoria -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - NEW CHUM LINE DRAINAGE PROBLEMS 1910
Handwritten extract from the Bendigo Advertiser 27/12/1910 Page 2. ''The Victoria Quartz, having deepened its shaft to 4,614 feet, had to abandon sinking on account of an inrush of water from the flooded mines to the south on the line. The influx occurred on the 15th of June, and notwithstanding that baling has been carried on almost constantly the company has failed to get the water out. It appears that the deep ground will have to be abandoned, owing to the absence of some proper scheme to cope with the water.''document, gold, drainage problems, drainage problems, new chum line drainage problems 1910, bendigo advertiser 27/12/1910 page 2, victoria quartz -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - WATER PROBLEMS
Two handwritten pages with extracts from the Bendigo Advertiser Mining Intelligence. Notes mention making arrangements with other mines to resume bailing, Victoria Quartz still shaft sinking despite strong flow of water, Lansell's 180 preparing to bail water from the deep levels, so that the Victoria Quartz may continue shaft sinking and finishing cutting of plat at 4454 ft. Also a weather report on the 14/6/1910.document, gold, drainage problems, drainage problems, water problems, bendigo advertiser mining intelligence 18/4/1910, 9/5/1910, 23/5/1910, 30/5/1910, 6/6/1910, 13/6/1910, victoria quartz, lazarus coy, lansell's 180 -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - ELLENBOROUGH FLOODED
Handwritten copy of a report in the Bendigo Advertiser 24/5/1907. ''Serious break in Water Main which is situated about 100 yards south of the mine. Main service pipe which supplies Harveytown has been leaking for some time past. Water soaking through old surface workings into the Belmont & Saxby shaft where it rose 60 feet and filled two x-cuts, one out weat 208 ft, and the other out east about 45 ft. Ellenborough began baling on Sunday 26th May, and it will take many days before work can be resumed. The mine was only working one shift and no men were underground at time of inrush''.document, gold, drainage problems, drainage problems, ellenborough flooded, bendigo advertiser, 27/5/1907, harveytown, belmont & saxby, ellenborough -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - INRUSH OF WATER AT THE VICTORIA QUARTZ
Two handwritten copies of a Bendigo Advertiser report 16/6/1910 Page 7. This is a longer version of 3600.14. It was thought that the rush of water was from a dam bursting in one of the other mines, but as the water showed no signs of slowing that theory was discarded. The temperature of the incoming water was much higher than the Victoria Quartz was accustomed to bail, and this circumstance is significent in view of the increased temperature of the water at the deep levels in the New Chum Railway. Some months ago, the water commenced to flow from the New Chum Railway workings into the New Shenandoah, which is the next mine north. The water rose so rapidly that a disaster was narrowly averted. The mines along the line were connected at different levels and with the cessation of bailing at the deep levels in the southern mines, it was only to be expected that the water would find its way north to the Victoria Quartz. The water raised from the operating mines under the direction of the New Chum Drainage Association, a yeart or two ago used to exceed six million gallons per month. At that time there were eight companies bailing water, and even then some of the plants, especially those at the deep mines, were severely taxed in coping with the water, and performing ordinary work. Since some mines had discontinued bailing, the water has been filling up extensive workings, and as was predicted in the ''Advertiser'' some time ago, the Victoria Quartz Company could not expect to succeed with its deep sinking project without making some special provision for raising the water, which ultimately would become a source of trouble. The Victoria Quartz Company was allotted a special grant of 10,000 pound to assist in sinking the shaft 1000 ft from the 4254 ft level. Under the conditions of the grant, the Company had to contribute half the cost of the sinking, and the raising of the water has also been an exensive item. For the present, all attention will be concentrated in lowering the water, and should the appliances prove unequal to the task the deep sinking scheme can only be accomplished by resorting to some comprehensive system of combating the water'.document, gold, drainage problems, drainage problems, inrush of water at the victoria quartz, bendigo advertiser 16/6/1910 page 7, mine reports 13/6/1910, victoria quartz, lansell's 180, mr stevens, mr w abraham, new chum & victoria mine, new chum railway, new shenandoah, new chum drainage association -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - MINERS SENSATIONAL EXPERIENCE AT THE VICTORIA QUARTZ
Handwritten notes from a Bendigo Advertiser report, Thursday June 16th 1910. Management had for some time been apprehensive that the flooding in the deep mines to the south would affect them. Lansell's 180 took the precaution of baling. On the Tuesday night the men at the Victoria Quartz had a sensational experience. The storage dam at 3324 ft level receives the overflow from the flooded mines to the south. The level connects with the 3310 level at the Big 180. The water flows uninterrupted into thestorage dam which has a capacity of about 270 tanks. The dam had been emptied on Tuesday morning and work continued until 10 pm that night. The platman noticed that the water was coming down the shaft in a regular torrent. They didn't take much notice as they thought it was a leakinig outlet valve on the ascending tank. At 11 pm the releiving shift came down the shaft and said that the dam at 3,324 ft must be overflowing. The velocity of the water pouring down the shaft increased and the men made a hurried exit from the bottom of the shaft which is down 310 ft from the 4.254 ft plat (a total depth of 4,564 ft). An inspection of the dam at the 3324 ft level found it to be overflowing. By morning (Wednesday) the shaft had filled, and the water rose to 7 ft in the plat at 4254 feet. Mining inspector hgave orders that men were not to go below the 3324 ft level. Baling continued without cessation at the Big 180 all day and could not lower the water. Drilling machines etc and a powerful air winch at the 4254 ft plat are under water. An inspection made of the 3100 ft level at the 180 mine where the workings are connected with the New Chum & Victoria showed that water was running strongly from that mine proving that the inrush was due to flooded water from the southern deep mines to the south.document, gold, drainage problems, new chum drainage scheme, miners sensational experience at the victoria quartz, bendigo advertiser 16/6/1910 page7, lansell's 180, big 180, new chum & victoria -
Bendigo Historical Society Inc.
Document - MINING REPORTS - CALEB THOMAS PLANS
Copy of Caleb Thomas Plan. Sheet No IV, dated 19/1/1885. Mines mentioned are: St Mungo , Sadowa, Ellenborough and the Belmont & Saxby. Also mentioned are Shaft No 38 and Shaft No 40A. Distances between each shaft in yards or feet, number of compartments and ounces of gold.document, gold, mining reports, mining reports, caleb thomas plans, st mungo, sadowa, ellenborough, belmont & saxby -
Bendigo Historical Society Inc.
Document - MINING REPORTS - CALEB THOMAS PLANS
Copy of Caleb Thomas plans, (a) Sheet No 778, dated 24th 1884. Mines mentioned are: Catherine Reef (South) Shaft, Catherine Reef United Main Shaft, Shaft No 50B, Shaft No 51A North Shaft and the Williams Main Shaft. Mentioned are distances from each mine in yards and from the Eaglehawk to Kerang Railway in feet. Also mentioned are ounces of gold. (b) Sheet No III dated 10/10/1884. Mines mentioned are: York & Durham, Arcadia Catherine, Williams (Old) Shaft, Trio-Hauling Co, South Catherine (later Williams United Main Shaft and others by shaft numbers. Mentioned are distances in yards or feet from each mine, number of compartments and ounces of gold.document, gold, mining reports, mining reports, caleb thomas plans, york & durham, acadia catherine, williams (old) shaft, trio-hauling co, south catherine (later williams united main shaft -
Bendigo Historical Society Inc.
Document - MINING REPORTS - CALEB THOMAS PLANS
(a) Copy of Caleb Thomas Plan - Sheet No VI (774) on the New Chum Line dated 4/12/1885. Plan shows the new St Mungo, Duchess Tribute, South Devonshire, Alberts Shaft, Duchess of Edinburgh, United Devonshire (later W. V. Devonshire), Princess Alexandra (later The United Devonshire) and the Ext'd St Mungo. (b) Sheet No VA (775) dated 30/5/1885. Eaglehawk District. Mines mentioned are: Phoenix Coy, Unicorn Coy Lease, Unicorn Shaft, Sth St Mungo, St Mungo Coy and the Lady Barkly. Also some numbered, unnamed shafts. Plans mentions shaft number, no of compartments and distance in yards and feet between each mine.document, gold, mining reports, mining reports, caleb thomas plans, st mungo, duchess tribute, south devonshire, alberts shaft, duchess of edinburgh, united devonshire (later w. v. devonshire), princess alexandra (later the united devonshire), ext'd st mungo, phoenix coy, unicorn co lease, unicorn shaft, sth st mungo, st mungo coy, lady barkly -
Bendigo Historical Society Inc.
Document - MINING REPORTS - NOTES FROM M & GEOL JOURNAL SEPT 1941
... and 1940 - 41. Shaft sinking at eighteen mines and unprospected... maintained, more mines operating, increased dividends, more shaft ...Handwritten extracts from the M. & Geol. Journal, Sept 1941 and Notes on Bendigo Goldfield - J. J. Caldwell. Average yield per ton maintained, more mines operating, increased dividends, more shaft sinking, smaller quantity of ore treated and gold yield lower. Table gives the number of operating mines, ore treated, gold won, average yield and dividends for 1939 - 40 and 1940 - 41. Shaft sinking at eighteen mines and unprospected sections penetrated.document, gold, mining reports, mining reports, notes from m & geol journal sept 1941, bendigo goldfield - j j caldwell, gold yield -
Bendigo Historical Society Inc.
Document - MINING REPORTS - SEC. MINES REPORT FOR 1908
Handwritten extract from the Sec. Mines Report for 1908. T. E. Williamson, Ins. Mines). Eaglehawk District. Page 130. Noes include Number of men employed and the depth of shaft for Collman & Tacchi, William's United, Koch's Pioneer, Nth Johnson & No 1, No 2 & No 3, Princess Dagmar, Needle, Golden Age, South New Moon, South New Moon 40 head battery, Catherine Reef United, New Moon and the Virginia. Also a new boiler reduced the wood consumption from 160 tons per week to 70 tons, whilst more work is being done.document, gold, mining reports, mining reports, sec mines report for 1908, collman & tacchi, william's united, koch's pioneer, nth johnson & no 1 no 2 no 3, princess dagmar, needle, golden age, south new moon, south new moon 40 head battery, catherine reef united, new moon, virginia -
Bendigo Historical Society Inc.
Document - MINING REPORTS - CATHERINE REEF UNITED MINE MANAGERS REPORTS
Handwritten notes on Catherine Reef United Mine Manager, J. M. Eyre Report 20/5/'72. Recommends the purchase of a new boiler. S. Jackson killed in a boiler explosion which the jury said was due to an error of judgement on his part. Recommendations, re New Winding Engine and Poppet Legs by Rbt. Coakes 18th May, 1905. Truck road from the shaft to the battery. Recommendation to call for tenders for a new changing house and a blacksmith shop. Reports about boilers, ropes, cleaning of machinery, testing of brakes, slack coal from the Powlett North Woolamai Collieries, crushings, number of batteries, low wood supply and a visit to the New Moon & South New Moon which are burning the Powlett slack coal.document, gold, mining reports, mining reports, catherine reef united mine managers reports, j m eyre, myrtle creek coy, s jackman, rbt coakes, great northern co, virginia co, mr roberts, mr harkness, mr mcgrath, ernest mueller, roberts & sons, mr bennett, mr abrahams, mr sluyterman, j langdon, electrical supply coy, smiths, powlett north woolamai collieries, m j gwatkins, new moon, south new moon -
Bendigo Historical Society Inc.
Document - MINING REPORTS - AIR BRAKES
Handwritten quote from W. Abraham, Inspl of Mines, Bendigo. He had been at the Great Northern Company's mine when the engine driver was hauling water from the 1.780 feet level, with a tank on one side and a cage on the other, broke the cross-head and two motion-bars; the drums reversed and desecended about 50 feet. The driver applied the air-brakes. The drums were brought a standstill, without any further damage. The Insp. Was in favour of the air -brakes and thought every should be compelled to use them in shafts below 1,000 feet in depth. Also a list of companies who have had these brakes fitted to their winding plants and a list of the companies who intend to fit them. Also mentioned is the price of fitting which was from 30 to 50 pounds.document, gold, mining reports, mining reports, air brakes, secretary mines report 1900 page 69, w abraham, great northern company, harkness & co, james mitchell, princess dagmar g m coy, confidence extended g m coy, victoria reef quartz coy, new moon g m coy, great southern garden gully g m coy, francis ormond g m coy chewton -
Bendigo Historical Society Inc.
Document - MINING REPORTS - BELMONT & SAXBY MINE MANAGER'S REPORT
Handwritten extract from the Belmont & Saxby Mine Manager, T. Hall's Report, dated Aug. 23rd 1884. Report mentions sinking and timbering the shaft, the average cost per foot, The La Belle Coy paying one third of the labor and fixed skids in bothshafts and starting to cut the Chamber and timbered complete.document, gold, mining reports, mining reports, belmont & saxby mine manager's report, t hall, the la belle company -
Bendigo Historical Society Inc.
Document - MINING REPORTS - DIRECT-ACTING WINDING ENGINES AT GREAT SOUTHERN EXTENDED LIMITED
Handwritten notes on winding engines supplied by Messrs. Thompson and Company, of Castlemaine, Victoria. Notes give a description of economy, drums, drum brakes, clutches, drum shaft-bearings,Disc brakes, link-motion, dial indicators, stop valve, easing valve spring relief valve and the driver's platform.document, gold, mining reports, mining reports, direct-acting winding engines at great southern extended limited bendigo, mines report 1900, w abrahams, messrs thompson and company castlemaine, stephenson's pattern, allen's pattern -
Bendigo Historical Society Inc.
Document - MINING REPORTS - STATE COAL MINE, WONTHAGGI
Handwritten extract from M. & Geol. Journal, Jan,y 1940. Notes mention winders, shaft guides, cages and skips.document, gold, mining reports, mining reports, state coal mine wonthaggi, m & geol journal jan 1940, t platt inspector of mines -
Bendigo Historical Society Inc.
Document - MINING REPORTS - MINE MANAGER'S REPORT TO WILLIAMS UNITED
Handwritten report from T. Banner, Mine Manager to Williams United, dated August 8, 1904, at request of Directors. Report is for the machinery at the York Shaft. Report mentions drums, ropes, length of rope on the drums, boiler which cannot work with safety up to more than 45 lbs., a good bend in the stack about 25 or 30 feet from the top and new wheels necessary. Also a report on the machinery at Central. Report mentions engine, drums, engine bed lifting a bit when bailing from the bottom, poppet legs, ropes and boiler.document, gold, mining reports, mining reports, mine manager's report to williams united, t banner, york shaft, central -
Bendigo Historical Society Inc.
Document - MINING REPORTS - COLLMAN AND TACCHI SHAFT
Handwritten note, re Turning of Collman and Tacchi Shaft. A quotation from the Mine Manager's Report mentions work that has been done on the shaft and loads crushed for a return of 3813 oz 1 dwts of gold.document, gold, mining reports, mining reports, collman and tacchi shaft, mr knight, richard eddy, annual report secretary for mines 1908 -
Bendigo Historical Society Inc.
Document - MINING REPORTS - CONFIDENCE EXT'D MINE MANAGER REPORT
Handwritten extracts from the Mine Manager, J. Ennor's Reports. The reports are dated 1897 and 1898. Reports mention new Slide Valves and eccentrics to the air-compressor, replacement of boiler and boilers at the South Shaft.document, gold, mining reports, mining reports, confidence ext'd mine manager report, j ennor, mr foot, roberts and sons -
Bendigo Historical Society Inc.
Document - MINING REPORTS - MINE MANAGERS REPORT
Handwritten extracts from the Mine Manager's Report, John Veale from the North Johnsons Shaft No 216, dated Jan 16th 1908 and the Koch's Pioneer Shaft No 224, Manager C. Rowedated 26 /4/1899. Report mentions machinery and equipment, crushing, firewood and winding engine.document, gold, mining reports, mining reports, mine manager's report, north johnsons, john veale, koch's pioneer, c rowe, cornish united co, central windmill coy, windmill hill coy, mr mcgrath -
Bendigo Historical Society Inc.
Document - MINING REPORTS - EXTRACTS FROM PRINCESS DAGMAR MINE MANAGER'S REPORT
Two copies of handwritten extracts from the Mine Manager's of the Princess Dagmar Mine, Garden Gully line. Mine Managers were J. Ebboth, Charles Gambetta, A. Williams and S. Richards. Subjects reported on include: supply of water to boiler, new engine- driver, stolen gold, engine house destroyed by fire, painting and cementing the chimney stack, sale of galvd iron and oil barrels, contractors erecting machinery, crushings, repair to shaft, new ropes, broken indicator on winding engine and work stopping and recommencing seven months later. Reports range in date from 1881 to 1914.document, gold, mining reports, mining reports, extracts from princess dagmar mine manager's report, john ebbott, mr roberts, mr lansell, john roberts, bendigo advertiser sat jan 23rd 1897, harkness and coy, almond williams, mr r eddy, f warren, s richards -
Bendigo Historical Society Inc.
Document - MINING REPORTS - LONDONDERRY SHAFT NO 249
Handwritten extracts from the Mine Manager, W. Westhead's report. 6/7/1905 and 21/12/1905 the pump rods parted and have been repaired. More repairs mentioned in a report dated 21/12/1905.document, gold, mining reports, mining reports, londonderry shaft no 249, w westhead -
Bendigo Historical Society Inc.
Document - MINING REPORTS - THE VIRGINIA MINE, A NEW EXIT
Handwritten notes on a new exit for the underground workers at the Virginia Mine. When the underground men leave the shaft after their shift, they will walk about 10 feet into a tunnel and then come up through the floor of the changing house by way of a broad staircase. Management claimed they would be protected in cold weather from the sudden change in temperature.document, gold, mining reports, mining reports, the virginia mine a new exit, bendigo advertiser feb 5th 1908 page 2, mr j hooper -
Bendigo Historical Society Inc.
Document - MINING REPORTS - LANSELL'S BIG 180
Partial page of handwritten notes on Lansell's Big 180 Mine on the New Chum Line. Notes give detailed location of the shaft, when it was formed and last production in 1916. Also some notes on the poppet legs.document, gold, mining reports, mining reports, lansell's big 180, john brown knitwear factory, caleb thomas -
Bendigo Historical Society Inc.
Document - MINING REPORTS - VARIOUS NOTES
... , Small Shafts, Mining Accidents, Mines Regulations Act 1/1/1874... Hotel, Quartz Outcrops, Small Shafts, Mining Accidents, Mines ...Handwritten notes and references. Mentioned are 'Bendigo Mac' Lachlan McLachlan, Criterion Hotel, Quartz Outcrops, Small Shafts, Mining Accidents, Mines Regulations Act 1/1/1874, Engine Drivers, Dust, and Big engines in deep mines.document, gold, mining reports, mining reports, various notes, 'bendigo mac' lachlan mclachlan, criterion hotel, licence fee, cave & amos, hustler, lazarus, theodore ballerstedt, geo lansell, wittscheibe, gt. comet, mining accidents, mines regulations acts 1/1/1874, regulations bill, ladders, engine drivers, advertiser 1873, angus mackay, dust, dr summon's report 1906, regulations 1908, new chum railway, victoria quartz, ext'd hustlers, central deborah -
Bendigo Historical Society Inc.
Document - MINING REPORTS - FAMOUS GOLD MINES OF BENDIGO AND EAGLEHAWK
Handwritten notes titled Famous Gold Mines of Bendigo and Eaglehawk. Notes include gold yields, deep shafts in 1904 and 1911, shafts of more than 4,000 feet, shafts between 3.020 and 3,682 feet and the reef line they were on, wages for different mine workers and a reference to winding engines and air compressors.document, gold, mining reports, mining reports, famous gold mines of bendigo and eaglehawk, the victoria quartz, new chum railway, miners wages -
Bendigo Historical Society Inc.
Document - MINING REPORTS - FOURTH COMPARTMENT INTRODUCED
Handwritten list of mines in Bendigo and Eaglehawk with the depth when the fourth compartment was introduced. Number of Shafts with fourth Compartment. Total at end of year 1908, 22, total at end of year 1909 - 42 - or an increase of 20 for the year. This is approximately 40% of all the working shafts on the year.document, gold, mining reports, mining reports, fourth compartment introduced, mines report 1909 page 117, hustlers reef no 1 park shaft, new chum goldfields, goldfields south, north, central nell gwynne, nell gwynne, goldfields consolidated, goldfields north, new bendigo goldfields propy, nell gwynne bdgo g'fields propy, goldfields extended, south concord, lansell's concord, south red white & blue, north red white & blue, victoria quartz, victoria consols, lazarus, new chum & victoria, carlisle, cornish united, united ulster, south concord, new chum railway, red, white & blue ext'd, new golden fleece, north new moon, new moon, south moon, clarence united, new argus, specimen hill, williams united, golden age (shellback shaft), johnsons no 2, confidence ext'd, callman & tachhi, needle shaft, catherine reef ext'd, bruhn's consolidated, new argus, new prince of wales -
Bendigo Historical Society Inc.
Document - MINING ACCIDENTS - SENSATIONAL WINDING ACCIDENT AT THE HUSTLER'S RESERVE NO 2 CO
Handwritten extract from the Bendigo Advertiser 5/12/1893 where three miners had a narrow escape in a winding accident at the Huster's Reserve No 2 Company's Mine, in Pall Mall. At the change of shift, three miners, William Merrin, Frederick Willoughby and E. Johns got into the cage on the western compartment to be lowered to the 845 ft. plat. The Driver Russel lost control of the engine and hauled the empty cage in the eastern compartment to the poppet heads. Cage went up with a crash, but the safety hooks caught it and let the rope go. The men in the cage in western compartment were very alarmed has cage hit the bearers on the 845 feet plat with considerable force. If it had crashed through the bearers they would have landed in the water below. The shaft was 1070 feet deep. The Mine Manager, S. T. Glanville ordered the driver off the mine; another rope re-attached and the men hauled to the surface.document, gold, mining accidents, mining accidents, sensational winding accident at the hustler's reserve no 2 co, william merrin, frederick willoughby, e johns, driver russell, s t glanville