Showing 437 items
matching trackworks
-
Melbourne Tram Museum
Newspaper, "Will Acland Street be eaten by PTV Trams?", Sep. 2014
Newspaper clippings from a local Port Phillip Council newspaper Sept. 2014, titled "Will Acland Street be eaten by PTV Trams?", about the proposal to reconstruct the terminus in Acland St for the Route 96 trams to cater for E class trams and the issues raised. .1 - Article looks at the issues, the views of the St Kilda Village Traders group, Port Phillip Council Has a photo of E 6003 in the area. .2 - an advert? by the St Kilda village traders showing their options and the Port Phillip Council option which was adopted. The advert seeks feedback via SMStrams, tramways, acland st, route 96, trackwork, st kilda, city of port phillip -
Melbourne Tram Museum
Photograph - Black & White Photograph/s, 1926
Black and white photograph of Preston Workshops, possibly soon after construction or during construction. Looking from the St Georges Road gate,. or North East. The overhead has been put up, tracks laid using wooden sleepers. The traverser between the Paint shop and the body shop can be seen. Prior to the timber store being constructed. C1926trams, tramways, preston workshops, construction, trackwork -
Melbourne Tram Museum
Photograph - Black and White photograph, Windsor Publications, c1969
Black and white photograph of - A3 size - of No. 1 Reciprocating Grinder at St Kilda junction, at the time being reconstructed for Queens Way and Wellington St bypass, c1969. Photo No. 10. Part of a series of photos by the Publisher. Has details of the publisher and printer Has the Junction Hotel with a large advert for Dunlop tyres in the background.Has in pencil "TMSV" in top right hand corner on rear.trams, tramways, grinder, st kilda junction, trackwork, tram 1 -
Melbourne Tram Museum
Pamphlet - Digital Image, Yarra Trams, "Bridge Strengthening works High St Northcote", Nov. 2021
Digital image of a Pamphlet - A4 4 pages, titled ""Bridge Strengthening works High St Northcote"" for dates 28/11/2021 to 6/12/2021, published by Yarra Trams, gives details of bus replacement and tram stops. Pavement and foundation reconstruction of tracks over the Merri Creek. This section of track was subject to a speed restriction. Gives details of the work and photos of the bridge itself. See also Reg Item 6095.3 - for another pamphlettrams, tramways, yarra trams, high st, northcote, bridges, merri creek, trackwork -
Melbourne Tram Museum
Pamphlet, Yarra Trams, "Passenger Bulletin - Track works in Mt Alexander Road and Fletcher St Route 59", May. 2007
Pamphlet - A4 sheet single sided, titled "Passenger Bulletin - Track works in Mt Alexander Road and Fletcher St Route 59" for dates 26/5 to 27/5 2007, published by Yarra Trams, gives details of bus replacement and tram stops.trams, tramways, yarra trams, essendon, trackwork -
Melbourne Tram Museum
Newspaper, Herald Sun, "Tram Danger - Brown", "Track disrepair threatens to derail tram services", 3/09/1991 12:00:00 AM
Set of two Newspaper cuttings about the condition of tram track. .1 - Newspaper clipping from The Herald Sun, 3/9/1991 - titled "Tram Danger - Brown", written by Mark Gardy. reporting on a leaked PTC report about tram tracks condition. Opposition transport spokesman Mr Brown released the report. The Minister Mr Spyker, said the track was safe. Gives some details of extent and costs and a map showing affected sections. Also a report about the PTUA calling for an inquiry into the price of transport fares in Victoria. .2 - Newspaper clipping from The Age 5/9/1991 - titled "Track disrepair threatens to derail tram services", about the same topic and reports. Article by Jacqui Macdonald and with a photo of Alan Brown looking at tracks and derailment marks outside the South Melbourne depot. Photo by Sebastian Costanzo.trams, tramways, trackwork, maintenance, repairs, ptc, ptua -
Melbourne Tram Museum
Pamphlet, VicRoads, "Royal Parade Parkville - Tram Improvement works", 2006
Pamphlet - 2 fold DL printed on gloss paper, titled "Royal Parade Parkville - Tram Improvement works", June 2006 giving details work as part of the Think Tram project, mainly the installation of raised dividing strips. Has locos of the Vic Govt, VicRoads and Yarra Tramstrams, tramways, royal parade, trackwork, vicroads, yarra trams -
Melbourne Tram Museum
Newspaper, The Argus, "Combined Crossover installed at Kooyong", 23/01/1925 12:00:00 AM
Photocopy of an article from The Argus, 23/1/1925, page 9 extracted through Trove, titled "Combined Crossover installed at Kooyong" with a photograph of the level crossing, replacement of track leading up to the Tramway or Railway Square. The disc signal for trams has been highlighted in yellow. Item made by Robert Green 18/9/2017trams, tramways, victorian railways, glenferrie road, level crossings, tramway square, trackwork -
Melbourne Tram Museum
Pamphlet, VicRoads, "Swanston Street Proposed Tram Project", 2010 to 2011
Set of five pamphlets associated with the installation of Superstops with a bike path in Swanston St during 2010 and 2012. .1 - DL - General redevelopment - Stage 1 - general pamphlet, Published by City of Melbourne and Yarra Trams. 2 - DL - double fold - guide to the new accessible tram zones - City of Melbourne, mainly around the new bike lane arrangements. 3 - DL - tri fold - Information Update 1 - giving an outline of the proposed staging of the works, service changes and dates for works during 2011. Has logos for Yarra, VicRoads, State Government and think tram. 4 - DL - two fold - Tram service changes, for all Swanston St routes, May 2011 with a photo of C1 3525 on the front cover. 5 - DL - six fold - August 2010 - project survey, outlining project for Franklin St to Grattan St Carlton. Has logos for Yarra, VicRoads and think tram.trams, tramways, swanston st walk, swanston st, trackwork, city of melbourne, franklin st, carlton, proposals, tram 3525 -
Melbourne Tram Museum
Pamphlet, VicRoads, "Tram route 59 transport improvement project", Oct. 2011
Pamphlet - 3 fold DL - titled "Tram route 59 transport improvement project", Early information update 1, detailing with a plan changes to Mount Alexander Road, Flemington and Travencore, Oct. 2011. Gives details of the staging, roadworks and timing. Has the Yarra Trams, VicRoads, Think Tram and Victorian Government logos.trams, tramways, mount alexander road, route 59, trackwork, road works -
Melbourne Tram Museum
Pamphlet, Yarra Trams, "Tram improvement works routes 48, 70, 109 and 112", "Tram service changes St Kilda Road - tram track renewal", 2008 and 2012
,1 - pamphlet - 4 fold DL, titled "Tram improvement works routes 48, 70, 109 and 112" - May and July 2008 - installation of curves at Wellington Parade, Spring and Flinders St and for Spring Macarthur and Collins St along with tram stop works. Has a map and project details. .2 - Pamphlet - 3 fold DL - "Tram service changes St Kilda Road - tram track renewal" - April 2012 - between commercial road and Domain Interchange. Has map. Both have State Govt and Yarra trams logos.trams, tramways, trackwork, new tramway, spring st, flinders st, junction, collins st, wellington parade, macarthur st, st kilda road, domain interchange, commercial road -
Melbourne Tram Museum
Negative - Set of 2, Wal Jack, 17/05/1942 12:00:00 AM
Set of two Black and white negatives, by Wal Jack, of rail grinder No. 2 parked in Ascot Vale Road, Moonee Ponds during the construction of the connecting line between Moonee Ponds and Union St and Maribyrnong Road corner. The west line has been completed and the eastern line is under construction. Photo dated 17-5-1942 in the Wal Jack album along with details of the location and the tramcar.trams, tramways, trackwork, new tramway, work trams, ascot vale road, moonee ponds, grinder, tram 2 -
Melbourne Tram Museum
Negative, Wal Jack, 17/05/1942 12:00:00 AM
Black and white negative, by Wal Jack, of the installation of the junction between Union Road and Maribyrnong Road, Ascot Vale. Shows a W Leech mobile crane, a few workers and many bystanders supervising the work. Two uniformed tramway (driver and conductor) are on the right hand side of the photograph. In the background is the Union Hotel. Photo dated 17-05-1942 in the Wal Jack album along with details of the location.trams, tramways, trackwork, union road, maribyrnong rd, new tramway -
Melbourne Tram Museum
Document - Report, T Hamilton, Melbourne Tramways Trust, preliminary report looking at the condition of the tramway track, 1913
Digital image - four pages - of a report to the Melbourne Tramways Trust, preliminary report looking at the condition of the tramway track - rails, wood blocks prior to the take over of the Tramway by the Trust (1916). Prepared by T Hamilton Engineer and Secretary, dated 10/3/1913 assisted by Gerard Wight of Melbourne Uni Looks at each line, rail wear, opening dates, rail weight, and condition of blocks. Also looks at the covenants or conditions of lease for the track and tramway, Completes report with notes about repairs, maintenance and renewals and legal advice of Sir John Madden.trams, tramways, melbourne, cable trams, track, trackwork, reports -
Melbourne Tram Museum
Newspaper, The Age, "Dispute over tram stop may travel to the High Court", 11/01/2005 12:00:00 AM
.1 - Newspaper clipping from The Age 11/1/2005, titled "Dispute over tram stop may travel to the High Court", about issues with the construction of a new terminus - Melbourne University - in Swanston St. Notes the issues, protests by Paul Mees PTUA, Sue Chambers of Carlton Residents Association, appears to VCAT, Supreme Court. Quotes Hubert Guyot CEO of Yarra. Has a photo of Paul Mees standing in the track work area, all track removed and a image of the finished project. Photo by Penny Stephens, report by Dan Silkstone, Transport Reporter. Item not dated, date determined by an online search. .2 - Yarra Trams newspaper notice advising of the works between 7/1 and 19/1 - temporary tram changes, road changes and general advice.trams, tramways, swanston st, melbourne university, superstops, terminus, trackwork -
Melbourne Tram Museum
Newspaper, tram track construction in Spring St, mid 1993 for the future City Circle, mid 1993
Newspaper clipping from a newspaper (either The Age or Herald Sun) with a photograph of tram track construction in Spring St, mid 1993 for the future City Circle. Photo is looking south along Spring St. Don Storey's http://www.classicaustraliantv.com/Gunzel.html, tram history notes that the track was completed early Nov. 1993 with new junctions.trams, tramways, spring st, trackwork, new tramway, city circle -
Melbourne Tram Museum
Negative - Set of 2, Possibly Geoff Grant, c1950
Set of two Black and white negatives of track construction in La Trobe St during 1950. .1 - Looking east from Queen St. Has the Argus building in the view. Both tracks have been constructed and the concrete foundation poured pending the top asphalt layer, a building selling Skoda cars, .2 - Looking west from Queen St with a tram crossing in the background in William St. Photo shoes the method of track construction - timber sleepers with the rail bolted to the sleeper. Pending concerting. In the background is The Mint and terrace houses on the left. There is a billboard for 1949 movie, "The Bribe". Photo not in Wal Jack Melbourne album.trams, tramways, la trobe st, track construction, trackwork, queen st -
Melbourne Tram Museum
Slide, 1960s
Colour slide - Kodachrome Duplicate cardboard mount - of a MMTB Grinder at work early morning at the corner of Swanston and Flinders St with Flinders St Station in the background. Station clock showing possibly 6.30. A workman is marking out the work to be undertaken with a piece of chalk. On the station building is a sign for Mitchell's brushes and the Cultural Centre appeal fund board. No slide print date - during the 1960's?On the slide in pencil "MP 6 Dupes", a Tramways Museum Society stamp and the numbers 759 and 1-5trams, tramways, grinder, work trams, flinders st station, swanston st, trackwork, tram 12 -
Melbourne Tram Museum
Ephemera - Christmas Card, Peter Duckett, c1990
Christmas Card prepared by Peter and Patti Duckett and sent to Keith Kings Printed photo on exterior with red printed ribbons, photo corners on inside with another photo and gold block print and the Duckett's address. Photographs by Peter Duckett or from his collection. Item not dated. Cover photo of Laying the first rail for the PMTT Inside photo shows the opening scene at Malvern Depot of the PMTT."To Keith" in ink.trams, tramways, christmas cards, pmtt, trackwork, opening, malvern depot -
Melbourne Tram Museum
Negative, Wal Jack collection, c1930
Black and white negative from Wal Jack collection of W 259 or W2 during track reconstruction work on its way to North Coburg. The tram has not been fitted with a route number box. A number of workmen in the view "leaning on their shovels" as the tram goes past. Photo could be between Moreland Road and Bell St or in Lygon St before the end of the cable trams in Sydney Road Coburg. OR - in Moreland Road itself, having just left Nicholson St - note heavy wires at the rear of the tram. Photo can be dated from the date a route number box was fitted. Tram was converted to a W2 in Oct. 1931. Photo c1930. Photo may not be by Wal Jack as a size that he did not use.trams, tramways, w2 class, w class, north coburg, sydney road, lygon st, trackwork, tram 259 -
Ballarat Tramway Museum
Document - Report, State Electricity Commission of Victoria (SECV), "Condition of Ballarat Tramways special work", 30/4/1958
Report details the condition of the special work with associated drawings of the rail head showing wear at many points around the system. Includes the size and type of the rail and the location of the rail sampled, includes curves, special work, junctions and type of equipment, Dated 30-4-1958. Demonstrates a detailed report into the condition and wear of the Ballarat Tramways trackwork in 1958.Report - 8 typed foolscap sheets carbon copy within a manila card folder with steel clips containing about 50 drawings on light card sheet of rail sections.Outside cover in ink "To accompany reprot to Manager on "Condition of Ballarat Tramways Special Work" dated 30-4-58"ballarat, secv, trackwork, rails, special work, points, reports, tramwaysm -
Ballarat Tramway Museum
Administrative Record - Meeting Minutes, State Electricity Commission of Victoria (SECV), "Tramway Maintenance Minutes of Conference - May 1 and May 2, 1952", 1952
Document titled "Tramway Maintenance Minutes of Conference - May 1 and May 2", attended by SEC Head Office Officers, representatives from Bendigo and Geelong. Topics covered - tyres and wheel centres, truck maintenance, suspension bearings, bearing metal (white metal), motor armatures, carbon brushes, air receivers, overhead equipment, tracks, car renovation - painting, gold lining, roof, floor treatment and covering, trolley wheels, purchase requisitions, spare parts, supplies, brake shoes, timber, castings, tramway drawings, patterns and a summary of action. Also includes notes on tramway statistics, employee's duties, one man operation, track drains, interchange of ideas and experiences and discussions of a general nature and notes on scrapping trams in badly damaged condition. Each item where relevant looks back at the actions from the previous conference. Has a list of attendees.Yields information and demonstrates SEC Meeting minutes about discussions between the three Provincial operators about tramcars and operations.Minutes - 53 duplicated foolscap sheets pinned with a folding clip in top left hand corner.trams, tramways, minutes, sec, geelong, ballarat, bendigo, tramcar equipment, maintenance, trackwork, overhead, painting, trolley wheels, brakes, motors, one man trams, scrapped trams, employees, rules -
Ballarat Tramway Museum
Administrative Record - Meeting Minutes, State Electricity Commission of Victoria (SECV), "Tramway Maintenance Minutes of Conference - April 26 and 27 1951", 1951
Document titled "Tramway Maintenance Minutes of Conference - April 26 and 27 1951", attended by SEC Head Office Officers, representatives from Bendigo and Geelong. Opening note on page 2 - that the discussions should be based on the SEC operating the tramways indefinitely. Topics covered - tyres and wheel centres, truck maintenance, suspension bearings, bearing metal (white metal), motor armatures, carbon brushes, air receivers, overhead equipment, tracks, car renovation - painting, gold lining, roof, floor treatment and covering, trolley wheels, purchase requisitions, spare parts, supplies, brake shoes, timber, castings, tramway drawings, patterns and a summary of action. Has a list of attendees.Yields information and demonstrates SEC Meeting minutes about discussions between the three Provincial operators about tramcars and operations.Minutes - 26 duplicated foolscap sheets pinned (was stapled poorly) in the left hand corner.trams, tramways, minutes, sec, geelong, ballarat, bendigo, tramcar equipment, maintenance, trackwork, overhead, painting, trolley wheels, brakes, motors -
Ballarat Tramway Museum
Administrative Record - Meeting Minutes, State Electricity Commission of Victoria (SECV), "Tramway Maintenance Minutes of 3rd Annual Conference March 30 and April 13, 1953", 1953
Document titled "Tramway Maintenance Minutes of 3rd Annual Conference March 30 and April 13, 1953" in the Bendigo and the Geelong offices. See item 9192 for Notes and Agenda for this meeting. Topics covered - cleaning of trams, tracks, track surface repairs, sleepers, car renovation, painting, flooring, notes on a Ballarat Field inspection, disinfecting blinds, electrical systems, truck maintenance, castings, maintenance costs, trolley wheels, employees duties and a summary of actions. Each item where relevant looks back at the actions from the previous conference. Has a list of attendees.Yields information and demonstrates SEC Meeting minutes about discussions between the three Provincial operators about tramcars and operations.Minutes - 50 duplicated foolscap sheets pinned with a folding clip in top left hand corner.trams, tramways, minutes, sec, geelong, ballarat, bendigo, tramcar equipment, maintenance, trackwork, overhead, painting, trolley wheels, motors, one man trams, employees -
Ballarat Tramway Museum
Administrative record, State Electricity Commission of Victoria (SECV), "Notes for 3rd Annual Conference", 1953
Set of notes for the Provincial Tramways Maintenance meeting to be held in Bendigo on 30/5/1953 and in Geelong on 13/4/1953. Has a summary of actions from the 1952 conference (see item 8056) and the Agenda for the respective meetings. See item 8113 for the minutes of these meetings.Yields information and demonstrates SEC Meeting minutes about discussions between the three Provincial operators about tramcars and operations.Twenty Five foolscap typed sheets stapled in a landscape format to a folded manila card.secv, ballarat, trams, tramways, minutes, sec, geelong, bendigo, tramcar equipment, maintenance, trackwork, trolley wheels, motors, maximum traction, employees -
Melbourne Tram Museum
Document - Digital Image, Melbourne & Metropolitan Tramways Board (MMTB), MMTB Work Order Notes, c1927 to c1947
Provides information on tramway construction or reconstruction work undertaken by the MMTB from about 1927 to c1947. Organised with an overall index and then index for each letter. Place names may be different to what we used today. Details the location, work carried out, costs, other departments such as electrical overhead, stores, date. Some have a small diagram of the track work at the work site.Demonstrates the method that the MMTB recorded its track reconstruction work and costs.Digital image of a set of record cards scanned from ruled cards that had been stamped onto the card with a large rubber stamp, in red ink to give a generic layout. The rear of some cards have been used for notes.tramways, trackwork, costs, mmtb, new tramways, work orders, road works -
Melbourne Tram Museum
Pamphlet, Public Transport Victoria (PTV), Yarra trams for tramways works during 2017 and early 2019, 2017 to 2018
Set of six pamphlets issued by Yarra trams for tramways works during 2017 and early 2019 .1 - six fold DL - route 11 tram service changes for work in St Georges Road and over the Merri Creek bridge 25/11/2018 to 30/11/2018. Route 11 - 2 copies held .2 - hanging strip type notice for the above work - cut to fit around a strap hanger bar for the St Georges Rd work - 2 copies held. .3 - as for .1 - work in Toorak Road, Camberwell, 3/1/19 to 12/1/19 - route 75. .4 - hanging strip type notice for the above work - cut to fit around a strap hanger bar. for the Toorak Rd. work. .5 - hanging strip type notice for the above work - cut to fit around a strap hanger bar - routes 96 and 109 for Claredon St junction work 9/8/2017 to 14/8/2017. .6 - ditto for routes 11, 12, 48, 109 - Queens Birthday weekend 10/6/17 to 12/6/17. .7 - ditto for routes 86 and 96 - 31/8/2018 to 16/9/2018 for work in Nicholson St Fitzroy. Have Yarra Trams PTV and Vic Govt. logos along with printing dates.trams, tramways, yarra trams, ptv, tramway per way, trackwork, route 11, route 12, route 48, route 75, route 96, route 109 -
Melbourne Tram Museum
Pamphlet, Public Transport Victoria (PTV), "Tram service changes", 2015
Set of 5 pamphlets or hanging notices to around tram handrails, cut out advised of the changes to services due to tramway or other works. .1 - Routes 12, 30, 70, 75 and 96 - 2/1/2015 to 11/1/2015 for the reconstruction of the Batman Park Stop, Clarendon St and the intersection of Flinders and Spencer St. .2 - 6/6/2015 to 8/6/2015 - St Kilda Road works .3 - 4/7/2015 to 8/7/2015 - St Kilda and Swanston St trams .4 - Routes 48 and 75 - 10/10/15 to 17/10/15 and 70, 75 and City Circle - 24/10/15 to 26/10/74. .5 - Route 8 - 28/11/2015 to 2/12/15 - Toorak Road works.trams, tramways, trackwork, bus replacement, notices and information, superstops, tram stops, route 12, route 30, route 70, route 75, route 96, route 48, city circle, route 8, st kilda rd, clarendon st, flinders st, spencer st, tram 3521 -
Melbourne Tram Museum
Pamphlet, Public Transport Victoria (PTV), "Tram service changes - Domain Interchange", 2013
Pamphlet or hanging notice to around tram handrails, cut out advised of the changes to services due to tramway or other works. .1 - Multiple routes - Domain Interchange 29 March 2013 to 12 April 2013 for the redevelopment of the interchange, St Kilda Road and Domain Road and Park St. Gives details of the diversions.trams, tramways, trackwork, domain interchange, domain junction, domain rd, park st, st kilda rd, bus replacement, notices and information, tram 3521 -
Melbourne Tram Museum
Photograph - Digital Image, Public Transport Victoria (PTV), "Buses replace trams - route 58", Oct. 2020
Digital Image of a pamphlet "Buses replace trams - route 58", November and December 2020 for the reconstruction of the tram track through Royal Park. Has details on the bus replacement services, map and road closures.trams, tramways, royal park, trackwork, track