Showing 772 items
matching crane
-
Lakes Entrance Historical Society
Photograph - Whiter Crane Hire, Lakes Post Newspaper, 1/12/1995 12:00:00 AM
Black and white photograph of four members of the crew at Whiter Street Crane Hire Mick Lunny, Graeme Armstrong, Wayne Lancaster identified, Lakes Entrance Victoriabusinesses, people -
Phillip Island and District Historical Society Inc.
Photograph, 1968
Part of an album compiled and donated by Mrs Helen Jansson. Construction of second Phillip Island to San Remo Bridge 1968/69.Close up of first decking in place - at full tide from Phillip Island side. Span projecting into air middle right with cranes at sea level middle right.John Squire Photography.local history, photography, photographs, slides, film, civil engineering, bridges, phillip island bridge 1968, black & white photograph, mrs helen jansson, phillip island bridge -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Early Shipping: Ocean / Railway Pier, c. 1990
Port of Portland Authority archives.Front: PORTLAND PIER 87port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph, Vessel 'Ixion' berthed to discharge a heavy lift for APML (Australian Paper Manufacturers), October 1959, 1959
Port of Portland Authority archives.Front: (no inscriptions) Back: October 1959 vessel 'Ixion' berthed to discharge a heavy lift for APML (Aust. Paper Manufacturers) (top, pencil)port of portland -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Conveyor belt construction, 1965
Port of Portland Authority ArchivesBack: Blue Portland Harbour Trust Stamp 235. 19-3-65 in black ink. -
Kiewa Valley Historical Society
Photograph of Clover Dam foundations, Clover Dam Foundations, 1949
Stripping of the foundations commenced in 1948 and the first concrete in the dam was poured in May, 1949. With the suspension for the winter months of work on the High Plains, it was possible to increase the number of men, and work then proceeded at a steady pace for the remainder of the year. Some interruption was caused by a flood in September, which over topped the rockfill coffer dam. By the end of 1950 17,000 yards of material had been excavated from the foundations and 4,000 cubic yard of concrete placed. Work at Clover Dam was completed in 1953, but two bays were left open for flood emergency. The pondage was filled on the 16th August, 1954. A pictorial record of the placing of concrete foundations of Clover Dam and also shows the methods of construction used at this site in 1949.Black and white photograph taken during the construction of Clover Dam. Shows early stages of the concrete foundations, cranes and the railway line which was constructed to bring materials to the site. Handwritten in blue ink of back of photograph "Clover Dam Foundations"dam, foundations, concrete, construction -
Eltham District Historical Society Inc
Photograph, Construction of Lower Plenty Bridge, Main Road, c.August 1966, 1966
This black and white photograph records construction activity of the then new Main Road bridge over the Plenty River at Lower Plenty in 1969.Local significanceBlack and white photograph taken during construction of the Main Road bridge over the Plenty River. Includes structural members, construction personnel, vehicles and a Clarke mobile crane.mobile cranes, bridge construction, main road, plenty river, lower plenty, bridges -
Eltham District Historical Society Inc
Photograph, Construction of Lower Plenty Bridge, Main Road, c.August 1966, 1966
This black and white photograph records construction activity of the then new Main Road bridge over the Plenty River at Lower Plenty in 1969.Local significanceBlack and white photograph taken during construction of the Main Road bridge over the Plenty River. Includes structural members, construction personnel, vehicles and a Clarke mobile crane.mobile cranes, bridge construction, main road, plenty river, lower plenty, bridges -
Federation University Historical Collection
Student's Technical Drawings, Technical drawings, 1924
Three student's technical drawings of a 10 ton jib crane 1/16 full size .1) Pencil on paper .2) Ink on tracing cloth .3) Blueprint technical drawing, g carroll, engineer drawings, r smith -
Bendigo Historical Society Inc.
Slide - RALPH BIRRELL COLLECTION: EIG SCHOOL, c1974
EIG School - Ralph Birrell Collection. - Construction of Latrobe Uni. C1974. Bendigo Institute of Technology, Engineering School, Applied Science. Crane inside what will be the lecture room.Kodakeducation, tertiary, latrobe university bendigo, eig school - ralph birrell collection. - construction of latrobe uni. c1974. bendigo institute of technology, engineering school, applied science. crane inside lecture room -
National Vietnam Veterans Museum (NVVM)
Model - Diorama, M113 APC Being recovered
M88 Hercules armoured recovery tank with boom crane lifting damaged APC. In the background is another APC providing armed support. A 1/4 tonne trailer is alongside.White US Army stars on both APCs. Foreground APC bears Reg. no. 12827469recovery tank, armoured personnel carrier, diorama, m113, m88 -
National Vietnam Veterans Museum (NVVM)
Painting, Field Maintenance
Framed watercolour depicting a group of soldiers working of a Chieftan Tank, a crane mounted to an APC lifts a component into the back of the tank. Two Huey Helicopters and a Chinook fly overhead.chieftain tank, armoured personnel carrier, chinook, huey helicopter -
Sunbury Family History and Heritage Society Inc.
Photograph, Bridge repairs
Work was being done repairing a bridge on the Sunbury - Bendigo line at the former Rupertswood siding, which in the past was used initially by guests who would arrive at the Rupertswood mansion and of later years by students from Salesian College. The siding has been dismantled. Students now use buses to travel to and from the school.A scanned non-digital black and white photograph of work being done along a rail line. There is a large crane beside the rail track and a rail car is also on the line.railways, salesian college, rupertswood siding., rupertswood estate. -
Lakes Entrance Historical Society
Photograph - Idler, 1980
The Idler was recovered by the Ballina Star skippered by Tom Northrope.|Also three other photographs various stages of the recoveryColour photograph of the recovery of the cruiser Idler which had been abandoned at sea, being lifted by the crane up on to the jetty, people on the jetting watching. Lakes Entrance Victoria fishing industry, boats and boating, ocean rescue -
Clunes Museum
Photograph - PHOTOGRAPHS
Clunes 150th celebrations in 1989, Jean Crane, Kerry Ingram, Julie Harper, Jenny Avery, Dawn Musgrove, Marg McFarlane, Mac Fawcett, John Bednell, Malcolm HullColour photographs of the street parade held for the 150th Back to Clunes celebrations in 1989150th celebrations, back to clunes 1989, street parade 1989 -
Melbourne Tram Museum
Photograph - Set of 3 - Temporary track St Kilda Road, Melbourne & Metropolitan Tramways Board (MMTB), 1950's
Photographs showing setting up temporary track in St Kilda Road using a mobile crane. One photo shows the temporary connection in the Alexandra Gardens area, late 1950s?Yields information about setting up temporary track in St Kilda Road for major tramway reconstruction.Series of 3 black and white photographs.Some photos have pencil marks on rear.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment, st kilda road -
Ballarat Tramway Museum
Book, Broken Hill Pty Co Ltd (BHP), "BHP - Hot rolled carbon steel sections and plates", 1967
Published by BHP 1967 gives the dimensions and properties of rails, steel sections and plates produced by Australian Iron and Steel and Broken Hill Pty Ltd. Was supplied free by BHP to students. Rail sections listed: 387 pound/yard crane rail 175 lb crane rail 146 lb crane rail 107 lb - 53 kg/m with fishplate and sleeper plates details 102 lb or 51 kg grooved tram rail 94 lb or 47 kg - fishplates and sleeper plates 91 lb or 45 kg NZR standard rail 82 lb or 41 kg - fishplates and sleeper plates 75 lb or 37 kg - fishplates and sleeper plates 63 lb or 30 kg - fishplates 45 lb or 22 kg - fishplates 30 lb or 15kg - fishplates 20 lb or 10kg - fishplates Yields information about rails and associated items produced by BHP AIS in 1967 along with other steel sections and plates.Book - 132 pages, white comb bound + blue plastic covers.railways, tramways, rails, bhp, fishplates, sleeper plates -
Glenelg Shire Council Cultural Collection
Print - Lithograph, Fisherman's Breakwater, c. 1954
Lithograph, black and white, couta boat, crane, Fishermens Breakwater, Portland; off-white mount, matte black wooden frame, reflective glass, silver hanging wire on back.Front: 'K. JACK 54' - part of lithgraph, top left hand corner. 'KENNETH JACK' - embossed lower right hand corner beneath lithograph Back: Black stamp 'KWD Jack P/L P.O. BOX 1, Doreen, Vic, 3754 -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Main Breakwater under Construction, 10/02/1959
Port of Portland Authority ArchivesBack: Purple stamp '10 Feb 1959'port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Cape Grant Quarry, n.d
Port of Portland Authority Archives -
Glenelg Shire Council Cultural Collection
Photograph, Silo construction, 1964
Port of Portland Authority ArchivesBack: Blue Portland Harbour Trust Stamp 176. 13-11-64 in black ink.port of portland -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - silo construction, n.d
Port of Portland Authority ArchivesBack: 230, 225 and 224 in pencilport of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour, Jun-92
Port of Portland Authority ArchivesFront: Back- 7/92- Blue pen Back: Testport of portland archives, reclamation area -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Main Breakwater construction, Portland, n.d
Port of Portland Authority Archivesport of portland archives, harbour development, breakwater, construction, euclid, truck -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Main Breakwater construction, Portland, n.d
Port of Portland Authority Archivesport of portland archives, construction, main breakwater -
Port Melbourne Historical & Preservation Society
Photograph - Overhead crane in sidings on Evans Street, Port Melbourne, Glen Stuart, 1987
From set of nine colour photographs of various locations on the Port Melbourne Railway Line from Port Melbourne to Montague Stations, 1987: Overhead crane in the sidings on Evans Streettransport - railways, glen stuart -
National Wool Museum
Photograph, Foster Valley Mills, Foster Valley Mills, Geelong, 1970s
Photograph shows the installation of the new Sulzer weaving looms in the early 1970s, they replaced the old Hattersley looms that were in use at the time. The gentlemen in the suit overseeing the procedure was Jack St Quentin, maintenance manager at the time. - Greg AldridgeColour photograph of textile machinery being installed at Foster Valley Mills. Image shows Elliots Mobile Cranes, Geelong supporting machinery being guided through mill doorway.woollen mills, textile mills, foster valley mill pty ltd valley worsted mill, sulzer weaving looms -
Lakes Entrance Historical Society
Photograph - Nyerimilang Jetty, Buckland, 1942 c
Black and white photograph of jetty below the homestead of Nyerimilang. Crane positioned at end of jetty, a fenced barge used for transporting sheep is at anchor behind the jetty. Gippsland Lakes Victoriajetties, waterways, tourism -
Lakes Entrance Historical Society
Photograph - North Arm Bridge, Davies Judy, 1999
Date made 10 April 1999Colour photograph of the construction of the road approaches and abutments for the new North Arm bridge, earthmoving machinery and crane on southern approach looking towards northern abutment. Lakes Entrance Victoriabridges, machinery, construction, roads and streets -
Lakes Entrance Historical Society
Photograph - Eastern Pier, 1925c
Also black and white print 10 x 17.5 cmBlack and white photograph showing Eastern Pier and Entrance to Gippsland Lakes from Bass Strait. Works machinery, buildings, cranes etc still in place. Lakes Entrance Victoria waterfront, piers