Showing 63 items
matching ran bridging train
-
Kew Historical Society Inc
Photograph - Kew Railway Station, May 1950
The Kew railway was opened in 1887, and diverged from the main (Box Hill–Lilydale) line about half-way between Hawthorn and Glenferrie. From the point of divergence the line was slightly less than one mile long, and it had only one intermediate station — Barker. There were four road over-bridges and two level crossings, including one over the busy Barkers Road. The line supported a passenger and goods service, and was electrified in December 1922, at the same time as the main line to Box Hill. There were a number of peak hour services which ran from Flinders Street station (Melbourne) to Kew, but in 1938 all but one of these were diverted to the Ashburton line, where traffic was growing. This had an adverse effect on Kew traffic, as passengers from Kew needed to cross over a footbridge at Hawthorn to change trains, and the main line trains were usually already crowded by the time they reached Hawthorn. At about the same time the off-peak trains were replaced by road buses. In 1952 all passenger trains were withdrawn, but the road bus service continued for many years. Goods trains were finally withdrawn in 1957, and the railway was dismantled in 1958-59. (Source: Frank Stamford, 'The Hawthorn - Kew Railway')Small black and white snapshot of Kew Railway Station inMay 1950. The photograph, one of 12, is part of a larger album of newspaper clippings, timetables, tickets and photos relating to the Kew Railway Line, taken and compiled by Lachlan Richardson, while a resident of Kew. The album dates from the 1950s. The album is part of a larger subject file on the Kew Line, compiled over time by members of the Kew Historical Society."Kew Railway Station, May 1950"kew railway line, transport -- railways -- kew (vic.), kew branch line, kew railway station -
Kew Historical Society Inc
Photograph - Kew Railway Station, 1951
The Kew railway was opened in 1887, and diverged from the main (Box Hill–Lilydale) line about half-way between Hawthorn and Glenferrie. From the point of divergence the line was slightly less than one mile long, and it had only one intermediate station — Barker. There were four road over-bridges and two level crossings, including one over the busy Barkers Road. The line supported a passenger and goods service, and was electrified in December 1922, at the same time as the main line to Box Hill. There were a number of peak hour services which ran from Flinders Street station (Melbourne) to Kew, but in 1938 all but one of these were diverted to the Ashburton line, where traffic was growing. This had an adverse effect on Kew traffic, as passengers from Kew needed to cross over a footbridge at Hawthorn to change trains, and the main line trains were usually already crowded by the time they reached Hawthorn. At about the same time the off-peak trains were replaced by road buses. In 1952 all passenger trains were withdrawn, but the road bus service continued for many years. Goods trains were finally withdrawn in 1957, and the railway was dismantled in 1958-59. (Source: Frank Stamford, 'The Hawthorn - Kew Railway')Small black and white snapshot of Kew Railway Station in 1950. The photograph, one of 12, is part of a larger album of newspaper clippings, timetables, tickets and photos relating to the Kew Railway Line, taken and compiled by Lachlan Richardson, while a resident of Kew. The album dates from the 1950s. The album is part of a larger subject file on the Kew Line, compiled over time by members of the Kew Historical Society."Kew Station / 14/51 / 22/4/51 F5"kew railway line, transport -- railways -- kew (vic.), kew branch line, kew railway station -
Victorian Railway History Library
Book, David Burke, 30 Days On Australia's Railways - A diary of September journeys, 2014
An entertaining look at railway events in Australia in the month of September - from 1848, when a meeting was called to start a railway company in New South Wales, to 2013, when the great Bayer-Garrett AD6029 steam engine was restored to working order. For some strange reason, September has been a month when particularly memorable railway events tend to occur. Author David Burke has crafted a 'diary' which documents, day by day, major happenings to do with railways in Australia - from the days of steam, to diesel, to diesel-electric and electrification, covering the first trains that ran between New South Wales and Queensland, and to Melbourne. It was in also September that the first sod was dug for the Trans-Australian Railway across the Nullarbor to Perth. The book is heavily illustrated with historic photographs, both black and white and colour, newspaper cuttings, sketches and maps, and features 13 paintings by renowned railway artist Phil Belbin. Names that leap to the fore among those who made railway history happen include Ben Chifley, the locomotive driver who became Prime Minister of Australia, engineer Dr John Bradfield, designer of the Sydney Harbour Bridge and responsible for putting Sydney's city trains underground, James Fraser, first Australian-born Chief Commissioner for Railways, and Harold Young, the Scotsman who designed the C38 engine and the Silver City Comet. Cover picture shows: Climbing the steep Fassifern Grade with a heavy coal train maakes for plenty of Bayer-Garrett action in Phil Belbin's painting of the AD60 class at work on the Shorty North line to Newcastle New South Wales Australia.ill. p.172.non-fictionAn entertaining look at railway events in Australia in the month of September - from 1848, when a meeting was called to start a railway company in New South Wales, to 2013, when the great Bayer-Garrett AD6029 steam engine was restored to working order. For some strange reason, September has been a month when particularly memorable railway events tend to occur. Author David Burke has crafted a 'diary' which documents, day by day, major happenings to do with railways in Australia - from the days of steam, to diesel, to diesel-electric and electrification, covering the first trains that ran between New South Wales and Queensland, and to Melbourne. It was in also September that the first sod was dug for the Trans-Australian Railway across the Nullarbor to Perth. The book is heavily illustrated with historic photographs, both black and white and colour, newspaper cuttings, sketches and maps, and features 13 paintings by renowned railway artist Phil Belbin. Names that leap to the fore among those who made railway history happen include Ben Chifley, the locomotive driver who became Prime Minister of Australia, engineer Dr John Bradfield, designer of the Sydney Harbour Bridge and responsible for putting Sydney's city trains underground, James Fraser, first Australian-born Chief Commissioner for Railways, and Harold Young, the Scotsman who designed the C38 engine and the Silver City Comet. Cover picture shows: Climbing the steep Fassifern Grade with a heavy coal train maakes for plenty of Bayer-Garrett action in Phil Belbin's painting of the AD60 class at work on the Shorty North line to Newcastle New South Wales Australia.railroads -- australia -- history., railroad travel -- australia -- history.