Showing 773 items
matching road construction authority
-
Seaworks Maritime Museum
Diagram
Cross section of wharves and steel framed sheds built along the Yarra river between the 1920s and 1960s. The South Melbourne side of the Yarra River is reclaimed swamp land. Without a solid foundation for the construction of the wharves and transit sheds, extended piles were sunk into the mud to support the wharf and shed structures. An example of this design may be found at 5 South Wharf which was built in the 1930s. The transit sheds gave shelter for cargo while waiting to be loaded onto a ship or to be collected by truck after being unloaded from a ship. The transit shed became surplus to requirements with the introduction of containers.Wooden diagram of a transit shed featuring a shed sitting atop mud with some water. It shows the splices sitting in the mud to support the shed. "Steel Frames Transit Shed/ 15 South Wharf/ Model of Typical wharf construction/ of 1940- made for the opening of/ the "new" 15 South wharf shed (1944),/ Note the deep piles and elevated/ rear of the shed to allow for the truck/ trays./ This shed feature disappeared/ from port construction with the/ coming of the container era/ reinforced wharf apron/ 3 ton travelling crane/ reinforced concrete shed floor/ concrete road/ water level/ concrete pile cap/ cradled piles/ timber pile splices/ mud/ mild steel pile splices/ 110 ft pile" "On loan from Port of Melbourne Authority" -
Greensborough Historical Society
Pamphlet, Victorian Government, Construction: EES study update, 2018_09
Part of the EES Study update for planning approval process for the North East Link. This volume covers Construction.6 p., col. photographsnorth east link -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - View of port and facilities, c. 1974
Port of Portland Authority archives.Front: (no inscriptions) Back: (no inscriptions)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - NNW of Portland Harbour, 21/03/1972
Port of Portland Authority archives.Front: (no inscriptions) Back: (no inscriptions)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Aerial view from the N.W. of Portland Harbour under construction, c. 1950
Port of Portland Authority archives.Front: (no inscriptions) Back: (no inscriptions)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Workshop No. 1, 1953
Port of Portland Authority archivesFront: (no inscriptions) Back: P.H.T./ Print No. 3/20 Neg. No ..../ Date taken 27-7-53/ SUBJECT./ Workshop No. 1. (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - New store and workshop area 22/1/53, 1953
Port of Portland Authority archivesFront: NEW STORE BUILDING AND WORKSHOP AREA 22/1/53/ VIEW FROM CLIFF ST. BRIDGE (lower centre) Back: P.H.T./ Print No. 3/8 Neg. No 110/ Date taken 22.1.53./ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Office Extension, 1953
Port of Portland Authority archivesFront: (no inscriptions) Back: P.H.T./ Print No. 3/25 Neg. No 199/ Date taken 2-11-53/ SUBJECT./ Office Extension (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - New store and workshop area, 25.9.52, 1952
Port of Portland Authority archivesFront: NEW STORE BUILDING AND WORKSHOP AREA 25.9.52./ VIEW FROM CLIFF ST. BRIDGE (lower centre) Back: P.H.T./ Print No. 3/4 Neg. No 5/ Date taken 25-9-52/ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Workshop no. 1, 27.3.53, 1953
Port of Portland Authority archivesFront: WORKSHOP NO. 1. 27.3.53. (lower centre) Back: P.H.T./ Print No. 3/17 Neg. No 148/ Date taken 27.3.53./ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Works area at Sand-spit, 6.8.52, 1952
Port of Portland Authority archivesFront: WORKS AREA AT SAND-SPIT. 6/8/52/ SHOWING WORKSHOPS' SITE & STORES BUILDING UNDER CONSTRUCTION (lower centre) Back: P.H.T./ Print No. 3/3 Neg. No // Date taken 6-8-52./ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Workshop no. 1, under construction and view of new store building, 27.3.53, 1953
Port of Portland Authority archivesFront: Workshop No. 1 under construction and New Store Building. 27.3.53. (lower centre) Back: P.H.T./ Print No. 3/16 Neg. No 149/ Date taken 27.3.53./ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre) Partial fingerprint in purple ink, lower centre.port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Aerial view from NE Portland Harbour, c. 1967
Port of Portland Authority archives.Front: 19 June 1997 Back: 19 June 1997port of portland archives -
Glenelg Shire Council Cultural Collection
Film - Film - Naval Vessel berthing, 1956-1958
Port of Portland AuthorityFront: (Colour) Oats/ Handling (blue pen on white tape, top of reel) Harbour/ Construction/ NOT EDITED (Colour) (Blue pen on white tape, top of reel)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - LB / TB, n.d
Port of Portland Authority Archivesport of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Main Breakwater Construction, n.d
Port of Portland Authority Archivesport of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Main Breakwater under Construction, 10/02/1959
Port of Portland Authority ArchivesBack: Purple stamp '10 Feb 1959'port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Main Breakwater Construction, n.d
Port of Portland Authority Archivesport of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Main Breakwater Construction, n.d
Port of Portland Authority Archivesport of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Engineer's office from Cliff St Bridge 23/2/53, 1953
Port of Portland Authority archivesFront: ENGINEER'S OFFICE FROM CLIFF ST. BRIDGE 23/2/53 (lower centre) Back: P.H.T./ Print No. 3/15 Neg. No 141/ Date taken 23.2.53./ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Building under construction, n.d
Port of Portland Authority archivesFront: (no inscriptions) Back: (no inscriptions)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Workshop No. 1, 1953
Port of Portland Authority archivesFront: (no inscriptions) Back: P.H.T./ Print No. 3/19 Neg. No 169/ Date taken 30-6-53/ SUBJECT./ Workshop No 1. (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Building under construction, n.d
Port of Portland Authority archivesFront: (no inscriptions) Back: (no inscriptions)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Engineer's office from Cliff St Bridge 22/1/53, 1953
Port of Portland Authority archivesFront: ENGINEER'S OFFICE FROM CLIFF ST. BRIDGE 22/1/53/ MODEL SHED, STORES FENCE & 3 PHASE POWER SUPPLY IN COURSE OF ERECTION (lower centre) Back: P.H.T./ Print No. 3/14 Neg. No 109/ Date taken 22.1.53./ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Workshop No. 1 under construction, 1953
Port of Portland Authority archivesFront: (no inscriptions) Back: P.H.T./ Print No. 3/21 Neg. No ..../ Date taken 27.7.53./ SUBJECT./ Workshop No. 1. (Ink stamp with blue pen and pencil additions, centre) Partial fingerprint in purple ink, lower centre.port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - Engineer's office from Cliff St Bridge 23/12/52, 1952
Port of Portland Authority archivesFront: ENGINEER'S OFFICE FROM CLIFF ST. BRIDGE 23/12/52/ MODEL SHED, STORES FENCE & 3 PHASE POWER SUPPLY IN COURSE OF ERECTION (lower centre) Back: P.H.T./ Print No. 3/13 Neg. No 96/ Date taken 23.12.52./ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Trust - New store building and workshop area 23/2/53, 1953
Port of Portland Authority archivesFront: NEW STORE BUILDING AND WORKSHOP AREA 23/2/53/ View from Cliff St. Bridge. (lower centre) Back: P.H.T./ Print No. 3/9 Neg. No 142/ Date taken 23.2.53./ SUBJECT./ % (Ink stamp with blue pen and pencil additions, centre)port of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - six contact prints of silo construction, 1964
Port of Portland Authority ArchivesSheet of (6) black and white contact prints relating to Silo Construction. First and fourth photo's are of the corner KS Anderson Wharf and some construction equipment. Second and third metal tower being constructed. Fifth shed on KS Anderson. Sixth photo completed structure of metal tower.Front: 2. 28-2-64 3. 28-2-64 4. 10-3-64 5. 5-3-64 6. 5-3-64 7. 10-3-64 (Under each of the prints, in white.)port of portland archives, construction, silo, k s anderson wharf -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Portland Harbour Construction, n.d
Port of Portland Authority ArchivesBack: PG 3 /11/11-62 -biroport of portland archives -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - No. 5 Berth Extension Construction Crew, n.d
Port of Portland Authority ArchivesBack: On attached paper: 'No. 5 Extension: MEMBERS OF THE CONSTRUCTION CREW. FROM LEFT: DOUG SMITH, KEVIN BUSH, RAY MALSEED, MARK O'DEA, BRUCE ORMANDY (M'TLE & CONSTRUCTION SUPERVISOR), JACK PATTERSON & JOHN OGANport of portland archives