Showing 156 items
matching drainage works
-
Kew Historical Society Inc
Photograph - Kew Main Drain, 1984
... of Kew, Ian Poulter, by the Supervising Engineer (Works... Engineer (Works), Southern and Eastern Drainage, Melbourne ...'Kew, Kew East, Balwyn & Balwyn North are located approximately 7km north east of Melbourne. Four main stormwater drains service the area flowing from south to north. Three of the drains: Deepdene Drain; Balwyn Drain & Glass Creek converge in Kew East just west of Burke Road at Kew High School before discharging into the Yarra River. The fourth drain, Kew Main Drain connects directly with the Yarra River to the West of Glass Creek.' The Kew Main Drain is a barrel drain that was created in the 1930s, and follows the route of the former Connor's Creek from the vicinity of Genazzano FCJ College to the Yarra River in East KewImportant and verifiable evidence of the construction methods used by the Melbourne & Metropolitan Board of Works in building the Kew Main Drain, before its reconstruction in c.1985.Original print colour positive photograph of the Kew Main Drain, provided on 14/12.84 to the Chief Engineer of the City of Kew, Ian Poulter, by the Supervising Engineer (Works), Southern and Eastern Drainage, Melbourne & Metropolitan Board of Works. The record includes an image of the reverse as well as the donation document from the MMBW."A84/1855-9 / 750mm council drain looking D/S [down stream] and across Parkhill Road. To be replaced with 1200 mm R.C.P. [reinforced concrete pipe] as part of MMBW Kew Main Drain reconstruction works"kew main drain, stormwater drains -- kew (vic.), connor's creek -- kew (vic.) -
Kew Historical Society Inc
Photograph - Kew Main Drain, 1984
... of Kew, Ian Poulter, by the Supervising Engineer (Works..., by the Supervising Engineer (Works), Southern and Eastern Drainage, Melbourne ...'Kew, Kew East, Balwyn & Balwyn North are located approximately 7km north east of Melbourne. Four main stormwater drains service the area flowing from south to north. Three of the drains: Deepdene Drain; Balwyn Drain & Glass Creek converge in Kew East just west of Burke Road at Kew High School before discharging into the Yarra River. The fourth drain, Kew Main Drain connects directly with the Yarra River to the West of Glass Creek.' The Kew Main Drain is a barrel drain that was created in the 1930s, and follows the route of the former Connor's Creek from the vicinity of Genazzano FCJ College to the Yarra River in East KewImportant and verifiable evidence of the construction methods used by the Melbourne & Metropolitan Board of Works in building the Kew Main Drain, before its reconstruction in c.1985.Original print colour positive photograph of the Kew Main Drain, provided on 14/12.84 to the Chief Engineer of the City of Kew, Ian Poulter, by the Supervising Engineer (Works), Southern and Eastern Drainage, Melbourne & Metropolitan Board of Works. The record includes an image of the reverse as well as the donation document from the MMBW."A84/1855-10 / 750mm council drain looking U/S [up stream] from Parkhill Road, Kew."kew main drain, stormwater drains -- kew (vic.), connor's creek -- kew (vic.) -
Wodonga & District Historical Society Inc
Album - Hume Reservoir Australia Album - Core wall with drainage tunnel and earth embankment in progress in Victoria, June 1924, 1927
This set of photos is from a leather bound album bearing the inscription "HUME RESERVOIR AUSTRALIA" plus 'The Rt. Hon. L. C. M. S. Amery, P. C., M .P.' all inscribed in gold. It was presented to The Rt. Hon. L. C. M. S. Amery, P. C., M. P, Secretary of State for Dominion Affairs on the occasion of his visit to the Hume Reservoir on 2nd November 1927. This album is of local and national significance as it documents the planning and development of the Hume Reservoir up to 1927. It was the largest water reservoir in the British Empire. The album records the pioneering engineering work that went into its construction.DEPARTMENT OF PUBLIC WORKS, N.S.W. RIVER MURRAY WATERS SCHEME. HUME RESERVOIR. 14. Core wall with drainage tunnel and earth embankment in progress in Victoria, June 1924.hume reservoir australia, river murray waters scheme, hume reservoir construction -
Wodonga & District Historical Society Inc
Album - Hume Reservoir Australia Album - Earth embankment on Victorian side from Top of Tail Tower Pillar, August 1927, 1927
This set of photos is from a leather bound album bearing the inscription "HUME RESERVOIR AUSTRALIA" plus 'The Rt. Hon. L. C. M. S. Amery, P. C., M .P.' all inscribed in gold. It was presented to The Rt. Hon. L. C. M. S. Amery, P. C., M. P, Secretary of State for Dominion Affairs on the occasion of his visit to the Hume Reservoir on 2nd November 1927. This album is of local and national significance as it documents the planning and development of the Hume Reservoir up to 1927. It was the largest water reservoir in the British Empire. The album records the pioneering engineering work that went into its construction.DEPARTMENT OF PUBLIC WORKS, N.S.W. RIVER MURRAY WATERS SCHEME. HUME RESERVOIR. 31. View from Top of Tail Tower Pillar - Earth Embankment, Victoria. This is a general view of the embankment which is being constructed by the Victorian Constructing Authority. The bank at its base is about 650 feet wide and it is about half its ultimate height. In the middle is the reinforced concrete core wall. At about the natural surface a tunnel for drainage and inspection purposes is built along the downstream side of the core wall but this cannot be seen. The Victorian workshops and township are located on the high ground beyond the embankment. The embankment curves round to the left at the side of the valley and will eventually block the gulley where the bushy tree stands. Access to one of the cuttings from which material is being got for the embankment is gained by means of this gulley at present. Part of another cutting may be seen on the right hand side at the back. August 1927.hume reservoir australia, river murray waters scheme, hume reservoir construction -
Melbourne Tram Museum
Document, Melbourne & Metropolitan Tramways Board (MMTB), Melbourne cable tram history, late 1930's
Manuscript - 29 quarto sheets carbon copy - article for publication possibly about the history of the Melbourne cable tram system. Notes cover - the background of history of city transport, the suburban councils, the formation of the MTOC, the MTT - list the various council representatives, development of the cable system, Mr. George Duncan, Dunedin, construction works, maintenance, finances, funding, contractors, construction timing, list of lines and opening dates, winding houses, the various lines, construction issues with drainage, cable lengths, horse trams. The conversion of cable trams, annual returns for 1886 to 1935. Page 22 has a heading "Why a Prophecy was Unfulfilled" - which looks at the finances of the MTT and the folding into the Tramway Board and then the MMTB, including community obligations, the MMTB Act, conversion operations, the Chairman's tour of 1923, St Kilda Road conversion, and finally conversion of Elizabeth St and Victoria St. Article dated mid to late 1930's.trams, tramways, cable trams, melbourne, public transport, history, mto co, mtt, dunedin tramways, finances, contracts, cables, construction, track construction, conversion, mmtb, chairman, community services -
Melbourne Tram Museum
Drawing, Road Construction Authority(RCA), "St Georges Road - Merri Parade to Miller St - Rehabilitation of Tramway and Divided Road", Dec. 1988
Set of two comb bound drawings for the "St Georges Road - Merri Parade to Miller St - Rehabilitation of Tramway and Divided Road", stippled card covers, providing details of plans, drainage, cross sections, track locations for the reconstruction of the roadway. Prepared Dec. 1988, used 1989. 621.2 Second volume titled "Amended Cross Sections" Prepared by the Road Construction Authority - RCA - Road Design Group Team 2. See Reg item 2653 for reports prior to the work being undertaken.trams, tramways, st georges rd, thornbury, northcote, tramways, road works, construction