Showing 242 items
matching tram track construction
-
Melbourne Tram Museum
Magazine, Jack Richardson, "Tram Tracks - The Electric Traction Monthly", Jan. 1949
Vol. 4 No. 1, January 1949 of "Tram Tracks - The Electric Traction Monthly" of the Australian Electric Traction Association. Magazine consists of 20 printed pages, with a single staple on the saddle. Contains a photo of the construction of the Victoria Parade tram line, article "Trams and the Motorist", items on Melbourne (Bourke St, "Higher costs with Buses - Melbourne Experience", Brisbane, Newcastle, Sydney, Monorails, railway map of Australia track gauges, (centre page), Brisbane Tramways, Melbourne and Sydney electric trains, and letter to the Editor from John Buckland - not supportive of Bourke or Latrobe St tramways. Issue has advertisements for the Model Dockyard, ARLHS, The Hobby Shop, Barnes Tennis Centre, Fleet, Christie Model Railway Equipment of Sydney, Meadmore Model Engineering, Austral Bronze, Wattle Park, Traction Publications and Robilt "O" gauge locomotives, Parker & Gray, The Model Dockyard,Has initials "JBS" in top right hand corner in pencil.trams, tramways, electric traction, aeta, australian tramways, mmtb, pcc, sydney, newcastle, brisbane, bourke st -
Melbourne Tram Museum
Magazine, Tramways sub-branch of MOA, "Tramway Circuit", Jul. 1955
Magazine or Journal - 32 pages + printed cover - "Tramway Circuit", Vol. 3, No. 6, July 1955 published by the Tramways Board Sub-branch of the Municipal Officers' Association of Australia - the Monthly Journal of the Official and Clerical Staff of the Melbourne and Metropolitan Tramways Board. The magazine has many advertisements for suppliers to the Board and others, including AEC buses and Ansair. Features the Official Opening of the Bourke St to Northcote tramway. Has a major article by D. H. Eakins, Chief Engineer - reviews those departments involved in the construction of new tramcars, Preston Workshops, tram track, Perway, distribution branch (electrical), building, and stores. (See key associations for names mentioned in the item).. Centre page spread of the opening day photographs, misc. notes on the day, letters to the Editor. An historical article on the cable tramway to Northcote, written by H. S. McComb, notes on the AETA provided by KK (Keith Kings) and notes on the AETA tour on 25/6/1955. Has minutes of the Special meeting of the MOA, notes on long service leave, Federal Council meeting notes. Two copies held. All pages scanned - pdf - text searchable. Cover scanned in colour, all other pages as gray scale. See Reg Item 5090 for a photo of the AETA tour at Malvern Depot.On top of the cover of one copy in ink "pages 1, 4, 14,17, 23"trams, tramways, moa, mmtb, bourke st, opening, northcote, new trams, cable trams, aeta, tours -
Melbourne Tram Museum
Pamphlet, Keolis Downer, "Experts in all stages of Infrastructure Life Cycle", c2015
Pamphlet - four fold A3, printed on heavy paper, titled "Experts in all stages of Infrastructure Life Cycle", advertising Keolis Downer abilities in tram track and other rail based work including light rail, key supplier international relationships, description of Yarra's network - statistics, photos of E 6001 and E 6005. Has centre page spread of the civil construction activities at tram stops, the rail bender and the reconstruction of the intersection of Nicholson and Victoria Parade intersection. Has Keolis Downer and Yarra Trams logos.trams, tramways, yarra trams, construction, keolis, victoria parade, nicholson st, trackwork, overhead, statistics -
Melbourne Tram Museum
Document - Tender Document, Melbourne & Metropolitan Tramways Board (MMTB), "Tender Schedule for All-Electric Trams - Contract 2500", Jul. 1972
Comb bound (white plastic) specification or tender document, approx. 70 pages, with glossy card covers, titled "Tender Schedule for All-Electric Trams" and "Contract 2500", published by the Melbourne and Metropolitan Tramways Board, closing Monday 2 October 1972. Details the conditions of tender, conditions of contract, notes, specification, gives background information about Melbourne, dimensions, performance, drivers and conductors, trucks, wheels, brakes, electrical equipment, control panels and drawings. The drawings give a map of the system, typical city route, Glenferrie Road route (grade diagram), concrete track construction, min. radius curves, loading gauge, all-electric tram and mounting details for the trolley base, schedule of prices, tender form, form of contract, schedule of information to be provided by the tenderer. On the inside of the cover is a memo from D. Snell, Deputy Chairman to the Testing Engineer, dated 11/7/1972 about the tender being issued, but requesting least publicity and all enquiries to Mr. Snell. Part of the work to tender for the construction of Z class trams. Document scanned to pdf file word searchable. See Item 4388 for the Z3 document and 1583 for an August 1966 version and Reg item 4667 for a draft June 1965 version. 2nd copy added 7/8/2020 from Keith Kings papers.In in pencil in the top right hand corner of cover "1975" crossed out and "1972" written in. On first sheet in pencil, "Howard Smith" and "Laboratory 10 Feb 1975" stamped on.trams, tramways, specification, tenders, z class, mmtb, melbourne -
Melbourne Tram Museum
Document - Report, Bob Vanselow, "Upgrading the tracks of Melbourne's Street Tramways", 1979
Report - comb bound 63 pages + appendices 30 pages - titled "Upgrading the tracks of Melbourne's Street Tramways", written by Bob Vanselow, MMTB Project Engineer and presented to the Third International Rail Sleeper Conference Brisbane September 1979. The paper looks at the then current system, historical track methods, current track laying methods and parameters, special work, crossings, joints, concrete mixes, design, open ballast track. The appendices has various diagrams and photographs showing track construction details. Hard copy added 29/3/2020 - received and printed in an e-mail dated 28/4/2011, from Bob Vanselow - See Reg Item 4431 for details.trams, tramways, track, mmtb, track laying, construction, sleepers, rails, points -
Melbourne Tram Museum
Document - Report, Melbourne & Metropolitan Tramways Board (MMTB), "Noise Test - Tramcars and Tracks", 12/08/1957 12:00:00 AM
Report - typed carbon copy - about 60 foolscap sheets bound with black and white photographs of the testing equipment within a brown card folder, secured with fold back clips, with red adhesive tape binding on the outside. Titled "Noise Test - Tramcars and Tracks", dated 12/8/1957, prepared by the MMTB Testing Department, Report No. N1/1/88. Gives details of the testing methodology, where testing carried out, types of track construction and the results - concrete track noisier than sleeper construction - includes notes on "quiet" trams.trams, tramways, preston workshops, reports, specification, wheels, tramcars, track, noise -
Melbourne Tram Museum
Document - Report, Melbourne & Metropolitan Tramways Board (MMTB), "Report to Employees, 1981/82", 1982
MMTB Report - A4 full colour when folded, 3 fold - titled "Report to Employees, 1981/82", giving notes on passenger numbers. service, vehicle fleet, track construction, electrical improvements, employment and training, staff facilities, Melbourne and its trams and a summary of the year's operations. Has many photographs of activities. Second copy added 23/11/2016.trams, tramways, mmtb, employees, operations, tramways, buses -
Melbourne Tram Museum
Photograph - Illustration/s, Vintage Drivers Club, Mar. 1985
Illustration from the centre page spread of "Vintage Driver No. 332 - March 1985" of the construction of St Kilda junction electric tram track with work on the paving and overhead being completed. Has tram 571 in the photos along with the Colas motor tank (tar?) , workmen sweeping the roadway, a road roller and the Ballast Motor 11 with a trailer being pushed. Photo c1930. Has the St Kilda Junction service station in the background. Photo possibly shows the resurfacing of the junction. Has a number of parked motors cars in the image. Reference Timeline History of Melbourne Tramway gives trackwork completed at St Kilda Junction, but the Ballast Motor being completed 1927, tram 571 entered service August 1929.trams, tramways, aeta, tours, ticket, south melbourne depot, hanna st depot, tram 571, tram 11 -
Melbourne Tram Museum
Magazine, Association of Railway Enthusiasts (ARE), "Tram Tracks - Vol 1 - No. 3 - July 1946", Jul. 1946
Magazine - five Gestener duplication sheets - titled "Tram Tracks - Vol 1 - No. 3 - July 1946" - the Journal of Association of Victorian Tramway Enthusiasts. Has notes on the PCC car, Glenhuntly depot tour, construction of the Latrobe St tram line, C class 36 "dog car", use of T class cars, W3 class trams, U206, Ballarat 16, notes from other cities, Sydney, notes on VR tramcars and details of the Association.trams, tramways, melbourne, t class, w3 class, vr trams, glenhuntly tram depot -
Melbourne Tram Museum
Document - Report, Metropolitan Transit Authority (MTA), "MTA Engineering & Maintenance Change Projects", 1987
Photocopied 140 page document titled "MTA Engineering & Maintenance Change Projects", produced by the MTA, 11/12/1987 setting out the proposal changes to MTA staff, use of contractors, consultation with the unions, consultation with unions, has a table of contents, index. Looks at construction activities, building maintenance and track maintenance, electrical and vehicle maintenance for the rail and tram divisions.trams, tramways, ptc, unions, tramways, railways, mta, workshops -
Melbourne Tram Museum
Document - Tender Document, Melbourne & Metropolitan Tramways Board (MMTB), "Design, Manufacture and delivery of 100 only all-electric trams", Aug. 1966
Comb bound (white plastic) specification or tender document, approx. 70 pages, with glossy card covers, titled "Tender Schedule for All-Electric Trams", published by the Melbourne and Metropolitan Tramways Board, closing 12 September 1966. Details the conditions of tender, conditions of contract, notes, specification, gives background information about Melbourne, dimensions, performance, drivers and conductors, trucks, wheels, brakes, electrical equipment, control panels and drawings. The drawings give a map of the system, typical city route, Glenferrie Road route (grade diagram), concrete track construction, min. radius curves, loading gauge, all-electric tram and mounting details for the trolley base, schedule of prices, tender form, form of contract, schedule of information to be provided by the tenderer. Second copy from same donor added 9-3-2017 See Reg Item 2266 for the 1972 version and 4667 for a draft version - dated June 1965. See Item 4388 for the Z3 document. See Reg Item 4049 for associated newspaper cuttings.In red felt pen on top right hand corner "(1966)". Has stamp "Discarded from PTC Library 22 Oct. 1989" on front cover. 2nd copy has "1966" in ink in top right hand corner.trams, tramways, specification, tenders, z class, mmtb, melbourne -
Melbourne Tram Museum
Document - Report, Melbourne & Metropolitan Tramways Board (MMTB), "Report to Employees, 1980/81", 1981
MMTB Report ( headed METRA) - A4 full colour when folded, 3 fold - titled "Report to Employees, 1980/81", giving notes on passenger numbers. service, vehicle fleet, track construction, electrical improvements, employment and training, staff facilities, Melbourne and its trams and a summary of the year's operations. Has many photographs of activities.trams, tramways, mmtb, employees, operations, tramways, buses, metra -
Melbourne Tram Museum
Document - Research Notes, H. S. McComb, extracts from the HTT Annual reports, 1950's
Set of papers - 28 sheets giving extracts from the HTT Annual reports - hand written in ink on plain quarto paper. - Notes the closing date of the horse tramway as 31/1/16 - whether to delegate operation to PMTT - Wattle Park - Metropolitan Tramway Park - Riversdale Road extension - Construction of the tramway, contracts and issues - Opening of the Line - extension of the depot - New tramcars - Burwood Accident - Report of Engineer and Manager - Permanent Way issues - Overhead Items 2037 to 2041 within box 72.3 in a brown folder marked "Hawthorn Tramway Trust" in red pencil. See Reg Items 2364 to 2367 for copies of the original reports.trams, tramways, htt, hawthorn, reports, annual reports, pmtt, wattle park, riversdale rd, construction, hawthorn depot, track, overhead -
Melbourne Tram Museum
Document - Research Notes, H. S. McComb, details of the Hawthorn system - part 1, 1950's
Set of papers - 12 foolscap and some quarto sheets - hand written in ink and pencil giving details of the Hawthorn system, distances, running times, streets used. Notes on Straun Robertson, depot layout, notes on track mileage, Wattle Park, construction, loop locations, sketches of track, the authorising Act, track lengths and calculations. Items 2037 to 2041 within box 72.3 in a brown folder marked "Hawthorn Tramway Trust" in red pencil.trams, tramways, htt, hawthorn, reports, routes, track, hawthorn depot -
Melbourne Tram Museum
Document - Research Notes, H. S. McComb, "Extracts from the Minutes of the Prahran and Malvern Tramways Trust which was constituted under Act of Parliament No. 21030 in 1907", 1940's
Original and carbon copy of "Extracts from the Minutes of the Prahran and Malvern Tramways Trust which was constituted under Act of Parliament No. 21030 in 1907", 10 foolscap sheets. Includes depot purchase, regrading of High St, extension to Burke Road, relocation of water mains, surveys, starting of construction, tenders for track and buildings, opening, extension, F. A. McCarty & Co., Dandenong Road lines, railway bridges, extension of High St to St Kilda Road, MMBW, finances. Items 2041 to 2052 within box 72.3 in a brown folder marked "PMTT" in red pencil.trams, tramways, pmtt, malvern, routes, track, surveys, malvern rd, tenders, construction, opening, dandenong rd, mmbw, finances -
Melbourne Tram Museum
Pamphlet, Public Transport Victoria (PTV), "Buses replace trams", Feb. 2019
Pamphlet - six fold - A3 to DL side three colour printed on off-white paper, titled "Buses replace trams", advising intending passengers of the work between 23/2/2019 and 7/3/2019 due to track renewal on Holmes and Nicholson streets in Brunswick. Has a map, list of service changes, bus replacement guides and contact information. Has the logos of Transport for Victoria, Yarra Trams and PTV. Two copies held.trams, tramways, nicholson st, holmes st, tramway construction, route 1, route 6 -
Melbourne Tram Museum
Document - Folder with papers, Folder of memos and directions, c1940
Folder of Memos and directions (htd3207i1> htd3207i8) - Air raid precautions, covering painting, respirators, sheds, tools, kits, shelters, stacks , blackouts, trenches, emergency, air raid shelters (htd3207i9> htd3207i16) - Accidents, covering accidents and derailments, (htd3207i17) - Bridges – inspection of Victoria St bridge (htd3207i18) - Cable tracks, covering tarring, patching, top dressing of cable tracks (htd3207i19> htd3207i21) - Cartage, covering hired trucks, cartage of wood blocks, spoil, sleepers (htd3207i22> htd3207i23) - Contracts, blank page (no image) - Councils, covering track opening, storm water drain, bad roads (htd3207i24) - Costs, covering maintenance costs, construction costs, wet weather (htd3207i25> htd3207i26) - Depots, covering inspections, storage, paving, telephones, mail (htd3207i27> htd3207i30) - Derailments, covering controls, reports (htd3207i31) - Drainage (htd3207i32) - Eastern Lines, covering loading platforms, crossovers, work orders (htd3207i33> htd3207i34) - Eastern Lines Reconstruction (htd3207i35> htd3207i37) - Eastern Line Maintenance (htd3207i38> htd3207i40) - Estimates (htd3207i41) - Employment (htd3207i42) - Footscray Lines (htd3207i43) - Instructions (htd3207i44) - Journals, covering Engineering Journal and magazines (htd3207i45) - Materials – General, covering frames & covers, unloading stores, packing plates, petrol allowance, ashes at Preston workshops, electrodes, sleepers (htd3207i46> htd3207i50) - Maintenance – General, covering loading platforms, inspections, work orders, paving (htd3207i51> htd3207i57) - Northern Lines, covering greasing of curves, crossovers, loading platforms (htd3207i58> htd3207i61) - Northern Lines – Reconstruction, covering crossings, welding machines (htd3207i62> htd3207i64) - Northern Lines – Maintenance, covering repairs, crossings, lifting programme, fencing, curves, track inspection, repairs (htd3207i65> htd3207i70) - New Lines (htd3207i71> htd3207i80) - Plant – General (htd3207i81> htd3207i94) - Plant – Concrete Mixers (htd3207i95) - Plant – Motor Vehicles (htd3207i96> htd3207i100) - Plant – Rollers (htd3207i101> htd3207i103) - Plant – Grinders (htd3207i104) - Plant – Grinders & Scrubbers (htd3207i105> htd3207i110) - Plant – Compressors and Tie Tampers (htd3207i111) - Plant – Cleaner Cars (htd3207i112> htd3207i114) - Plant – Loaders (htd3207i115) - Plant – Tools (htd3207i116> htd3207i117) - Plant – Miscellaneous (htd3207i118) - Per Way – General (htd3207i119> htd3207i121) - Public Utilities (htd3207i122> htd3207i123) - Reconstruction – General (htd3207i124> htd3207i126) - Railways (htd3207i127> htd3207i129) See \dbtext\hawthorn\photo_collections\3207_Folder for scanned images.trams, tramways, instructions -
Melbourne Tram Museum
Magazine, Royal Automobile club of Victoria (RACv), "Growing Pains", Oct. 2019
... Trams tramways Track Construction Trackwork Track Laying Metro ..."Growing Pains" by Sue Hewitt Article from the RACV magazine Royalauto about Melbourne's road congestion. Although the article doesn't mention trams it features two photos of the St Kilda Rd tramways. First photo from 1925 shows construction of tramway at St Kilda Rd and Domain Road. Second photo shows Metro Tunnel Project's ANZAC station at same intersection in 2019.trams, tramways, track construction, trackwork, track laying, metro tunnel, anzac station, domain junction -
Melbourne Tram Museum
Photograph, Peter Rufus, rail used in the construction of Essendon depot in 1906, 2006
Set of two digital images of rail used in the construction of Essendon depot in 1906, marked "Carnegie 1906". See item 6809 for an actual piece.trams, tram track, tramways, essendon depot, nmetl, construction -
Melbourne Tram Museum
Document - Photocopy, Electric Railway Journal, Struan Robertson, "A Recent Australian Tramway", 1917
Photocopy of an article from the Electric Railway Journal, pages 10 to 12 of the 7 July 1917 issue, Vol 50, No. 1 titled, "A Recent Australian Tramway", describing the construction, tramcars and equipment for The Melbourne Brunswick and Coburg Tramway Trust written by Struan Robertson. Has photos of the track, sub-station. type of tramcar and depot with tramcars. MBCTTtrams, tramways, mbctt, new tramway, depot, thornbury depot, brunswick, coburg -
Melbourne Tram Museum
Negative, Bruce Herbert, "Burwood Tram Line Extns - near Blackburn Road", 29/12/1977 12:00:00 AM
Negative folder - made by SAGA Japan, containing 6 no. 120 film negatives 60mm x 90mm of the works on the extension to East Burwood, Burwood Highway, near Blackburn Road, 29-12-1977. Folder stamped 396 .1 - Burwood highway - out of focus - showing end of slab. .2 - ditto - looking west? - shows cross section of slab. .3 - Blackburn road with poles positioned - with BP service station in background. .4 - ditto .5 - sign showing tramway works in progress .6 - from the kerbside showing the track.trams, tramways, burwood highway, tramway construction, construction, east burwood -
Melbourne Tram Museum
Photograph - Set of 6 colour prints - Docklands Drive Docklands track construction, early 2009
Colour prints showing the methodology of track laying in Docklands Driver from Harbour Esplanade to New Quay or Waterfront City in early 2009. The palm trees were there first.Yields information about the construction of Docklands Drive track in 2009.Set of 6 colour prints on Fujicolor Crystal Archive papertrams, tramways, city circle, docklands melbourne, docklands drive -
Melbourne Tram Museum
Slide - Set of 7, Keith Caldwell, 17/06/1971 12:00:00 AM
Set of seven Agfa colour slide, blue and white plastic mount, photo by Keith Caldwell of a track deviation during the construction of the Alexandria Avenue underpass at the north end of St Kilda Road. Shows the deviation, temporary track ("on the fly), overhead works and after the bridge has been completed, the permanent track brought into use.. All have the Arts Centre in the background. Slides 1 to 4 - 17/6/1971, 5 to 7 - 20/6/1971, after the change over from the temporary track to the permanent track. .1 - W6 919 outbound, East Malvern Route 3 - has a large gantry beam in the background and an advertisement for briquettes and Norton Bear tape. In the background is the National Gallery of Victoria building. .2 - W2 819 outbound, route 8 Toorak, with Shrine of Remembrance in the background. .3 - W2 389 ditto for Glen Iris, Route 6 .4 - W2 349 outbound for East Brighton, route 64 and inbound W2 633, city, route 67. .5 - SW6 854 inbound using the new track on the bridge, but temporary track remains in front of the tram. Overhead crews at work. W5 768 following. Both trams are travelling on the wrong line or "bang road" Tram have a Stillwell Ford and Ferris Car radio adverts. .6 - SW6 905 inbound, route 67. Also running wrong line. In the background is a rail mounted overhead trolley tower and Bedford truck MZR129. .7 - SW6 845 in bound route 8 followed by SW6 854, route 72. Both trams are running on the wrong line. An excavator in the background is working on removing the deviation track. 845 has various adverts including one for Uniroyal Tyres..1 has in pencil "17.6.71" and "Alex Av Opass constrn" and .7 "20.6.71"trams, tramways, st kilda rd, temporary track, trackwork, overhead, alexandra ave, princes bridge, bridges, route 3, route 67, route 64, route 8, route 6, route 72, w6 class, w2 class, tram 919, tram 905, tram 819, tram 389, tram 349, tram 633, tram 854, tram 768, tram 845, tram 854 -
Melbourne Tram Museum
Document, Peter Duckett, "North Melbourne electric Tramway and Lighting Company", late 1940's?
Manuscript - 3 foolscap typed - 1st page a title page, titled "North Melbourne electric Tramway and Lighting Company", written by Peter Duckett. Not dated, possibly late 1940's. Outlines the history of the formation of the company, the routes, track construction, depot, power house, car barn, rolling stock, tramcars, overhead and take over by the MMTB - "what is now one of the worlds finest electric tramway undertakings."trams, tramways, nmetl, essendon, keilor rd, saltwater river, track construction, essendon depot, power station -
Melbourne Tram Museum
Document, Melbourne & Metropolitan Tramways Board (MMTB), Melbourne cable tram history, late 1930's
Manuscript - 29 quarto sheets carbon copy - article for publication possibly about the history of the Melbourne cable tram system. Notes cover - the background of history of city transport, the suburban councils, the formation of the MTOC, the MTT - list the various council representatives, development of the cable system, Mr. George Duncan, Dunedin, construction works, maintenance, finances, funding, contractors, construction timing, list of lines and opening dates, winding houses, the various lines, construction issues with drainage, cable lengths, horse trams. The conversion of cable trams, annual returns for 1886 to 1935. Page 22 has a heading "Why a Prophecy was Unfulfilled" - which looks at the finances of the MTT and the folding into the Tramway Board and then the MMTB, including community obligations, the MMTB Act, conversion operations, the Chairman's tour of 1923, St Kilda Road conversion, and finally conversion of Elizabeth St and Victoria St. Article dated mid to late 1930's.trams, tramways, cable trams, melbourne, public transport, history, mto co, mtt, dunedin tramways, finances, contracts, cables, construction, track construction, conversion, mmtb, chairman, community services -
Melbourne Tram Museum
Document, Melbourne & Metropolitan Tramways Board (MMTB), "Preston Workshops", Nov. 1926
Set of two typed reports detailing Preston Workshops. .1 - Report - marked draft, dated 24/11/1926 - 4 foolscap pages with marks, corrections, changes outlining the need for a workshop, refers to the Malvern depot, acquisition of the land, design, capacity, description of the various shops. Gives a description of the operation, construction of trams in the future, notes the cable repair shops at Nicholson St, cranes, employee numbers, costs, paint and body shop. Notes the mess room and that an ambulance room will be provided. .2 - Report - 3 quarto pages - undated - but based on the first sentence, c1929 - titled "Tramway Workshops Preston". Gives a description of the workshops, the main groupings, building sizes, cranes, floors, building and maintenance capacities, tracks, admin block, employment, sub-station and power supplies.In top right hand corner of each sheet of .1 "Reference RS 49/1" stamp and handwritten.trams, tramways, preston workshops, malvern depot, nicholson st, workshops, workplace conditions -
Melbourne Tram Museum
Photograph - Digital Image, Public Transport Victoria (PTV), "St Kilda Road and High Street - Buses replace trams - Sunday 13 Oct. to Sunday 27 Oct.", Oct. 2019
.1 - Pamphlet - 2 x 3 fold x titled "St Kilda Road and High Street - Buses replace trams - Sunday 13 Oct. to Sunday 27 Oct." 2019 for works at Domain, Park and St Kilda Road and track relay in High Street between St Kilda Road and Williams Road. Gives alternative bus routes. Part of the work was for the construction of the Noise Box or acoustic shed over the future Anzac Station site - part of the Metro Tunnel Works and track relocation. See htd3930i2.pdf for a detailed description of the work from the Metro Tunnel authority - Rail Projects Vic. This file does not want to open properly using dbtext works, access directly. Image i3 - from tdu website https://tdu.to/m/262235/re-d2-5005-at-temporary-tram-termin-us-st-kilda-road, shows the works underway. Posted by Metro Tunnel on twitter today showing progress on relocating tram tracks at site of Anzac station. This will allow construction of the southern box of the station. Large file (~2.6MB and 4096x2733 pixels, but enables you to get "up close and personal".trams, tramways, park st, domain junction, metro tunnel, toorak rd, st kilda rd, tramway construction -
Melbourne Tram Museum
Photograph - Set of 4 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1966
... Trams tramways East Preston Construction Trackwork Tram Depot ...Series of 4 black and white photographs of the construction of three tracks or roads at East Preston Depot 7/1955. .1 - Mud mining - earthworks with the Stately Shoe and Wall Bros buildings in the view. .2 - showing one track complete with a second underway, .3 - two tracks complete with a third just in the view. .4 - pouring concrete at the depot - bicycle shed?trams, tramways, east preston, construction, trackwork, tram depot, track materials -
Melbourne Tram Museum
Photograph - Set of 5 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1966
Series of 5 black and white photographs of the trackwork used at specific locations:\ .1 - plated curve of embedded plates for spandrel clips retaining the rails - would have allowed access. .2 - joint between rails - bridge expansion? In a temporary position. .3 - track being laid over a rail based bridge deck. .4 - track being laid or positioned for a bridge or replacement - possible slot beam and cable track in the background. .5 - temporary track over a bridge abutment or structure under construction.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment, bridges -
Melbourne Tram Museum
Photograph - Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), Nov. 1959
Black and white photographs of the temporary track being completed during the first stage of the construction of the King St overpass in Flinders St. looking west. shows work being completed. Reg Item 4274 by Keith Kings dates the work to mid Nov. 1959.Some photos have pencil marks on rear.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment, flinders st, king st, kingsway