Showing 1699 items
matching concrete
-
National Wool Museum
Sign - Display Board, Dennys Lascelles Ltd Concrete Building
Display panel giving details re: the construction of the Dennys Lascelles concrete building (the Bow Truss building) adjacent to the Dennys Lascelles wool offices and store (now NWM) in 1911-13. The building was designed as a show floor for wool bales, thus the lack of columns and roof supports was significant in providing free space. It was designed by Mr E.G. Stone and construction was supervised by Laird and Buchan. It was demolished in the 1990s. This display board / text panel may have been created for use in the concrete building.Display board from 1913 giving details re: the construction of the Dennys Lascelles concrete building (the Bow Truss building), adjacent to their wool store and offices.DENNYS LASCELLES LTD. / CONCRETE BUILDING. / Building Commenced in 1911. Finished in 1913. / Is 4 Storeys High. / The Show Floor covering almost an acre / of ground, is the largest flat roof space / in the world without visible supports ... / The suspended Roof weighs 1200 Tons. / The Building was Designed & Erected by / MR. E.G. STONE, C.E. / The Construction Absorbed:- / 8000 Casks of Cement. 3250 Loads of Sand. / 475 Tons of Steel. 2250 Yards of Crushed Stone. / 1100 Was Expended on Timber for Casing the Concrete Moulds. / 94 Cases of Nails & 432 Gallons of Oil / were required for the Concrete Casing. / The building was constructed entirely of Day Labor / at a cost of Over 40,000. / The Building Construction was supervised / by Messrs Laird & Buchan, F.R.A.I.A. / Architects - Geelong.wool sales, wool bales, dennys, lascelles limited, stone, mr e. g. laird and buchan, dennys lascelles concrete building, bow truss building, geelong -
Melton City Libraries
Photograph, Paramount Concrete, c.1972
Paramount Concrete Works tower on the site of Burnbank 1 – Cottage of Henri and Ann nee Dowling Myers side of road east of Myers Gully the junction of Reserve Rd. now known as Ryans Creek. Built c 1870. it remained in the family until a demolition order was placed on it in 1969 when vacated by Martha wife of Frederick 4th son of Ann and Henry. Her new house was built in McKenzie St on the south side near the corner of Smith St. Paramount Concrete established 1972, changed to Readmix Farley in 1983Paramount concrete with cranemisc. -
Kew Historical Society Inc
Photograph - Instructional photograph No.1: Using concrete for street kerbs, Portland Cement Association, 1921
One of seven photographs produced by the Portland Cement Association in 1921 showing how concrete kerbs could be created. Portland Cement Association (PCA) was founded in 1916. From 1917, the association actively promoted the benefits of concrete for road works in Australian newspapers. In the nineteenth century in Melbourne (Vic.) 'made roads' typically had gutters and kerbing lined with bluestone.The photographs are important evidence of the availability of instructional models for the use of concrete in street works in Victoria. While the photographs date from the early 1920s, the use of concrete for kerbing did not reach its maturity until after World War 2. The photos demonstrate knowledge about and the use of concrete in street works in a major Melbourne municipality at an early period.Black and white photograph with printed instructions on the reverse showing the production of concrete kerbing on 67th Street, West Allis, Milwaukee, Wisconsin (USA). The photograph was produced by the Portland Cement Association of Chicago in 1921 and used within the Chief Engineer's Department of the City of Kew (Vic.)."1st - Filling forms with Concrete. Construction of Combined Concrete Cerb and Gutter"street works, kerbing, gutters, concrete, portland cement association -
Ballarat Tramway Museum
Slide - 27 mm sq slide/s, Andrew Howlett, Tram No. 11 northbound in Lydiard St North, with the cutting concrete wall before Gregory St, Feb. 1969
The concrete wall behind the tram was removed following closure of the SEC operated system and reconstruction of the street.Yields information about the Lydiard St line and in particular the concrete cutting wall before Gregory St.Colour slide, Kodak white cardboard mount, developed Feb. 1969 of No. 11 northbound in Lydiard St North, with the cutting concrete wall before Gregory St Tram has the destination of Lydiard St Nth and has a Twin Lake sign.ballarat, tramways, trams, lydiard st north, gregory st, tram 11 -
Melbourne Tram Museum
Document - Report, Melbourne & Metropolitan Tramways Board (MMTB), "Information - Resilient CSS (Concrete) Track", Dec. 1962
Report - titled "Information - Resilient CSS (Concrete) Track" - prepared by the MMTB Engineering Testing Branch Dec. 1962. Report No. I 5/1/146. The report looks at the use of mass concrete where the rail is fully embedded and the noise issues compared with track fitted with a rubber-fluted rail pad. Details the tests undertaken and the results. Recommends a 100m test section be constructed and provides an estimate for this. See item 4665 for a sample of rubber boot used in the Box Hill extension.Yields information about an investigation into tram track noise issues.Report - 53 carbon copy pages with photographs clipped within manila card covers.tramways, mmtb, tram tracks, concrete, noise, rails, civil engineering -
Kew Historical Society Inc
Photograph - Instructional photograph No.2: Using concrete for street kerbs, Portland Cement Association, 1921
One of seven photographs produced by the Portland Cement Association in 1921 showing how concrete kerbs could be created. Portland Cement Association (PCA) was founded in 1916. From 1917, the association actively promoted the benefits of concrete for road works in Australian newspapers. In the nineteenth century in Melbourne (Vic.) 'made roads' typically had gutters and kerbing lined with bluestone.The photographs are important evidence of the availability of instructional models for the use of concrete in street works in Victoria. While the photographs date from the early 1920s, the use of concrete for kerbing did not reach its maturity until after World War 2. The photos demonstrate knowledge about and the use of concrete in street works in a major Melbourne municipality at an early period.Black and white photograph with printed instructions on the reverse showing the production of concrete kerbing on 67th Street, West Allis, Milwaukee, Wisconsin (USA). The photograph was produced by the Portland Cement Association of Chicago in 1921 and used within the Chief Engineer's Department of the City of Kew (Vic.)."2nd - Tamping Concrete into Approximate Contour"street works, kerbing, gutters, concrete, portland cement association -
Ringwood and District Historical Society
Receipt Book, City of Ringwood, Receipt book for concrete crossings done by the City of Ringwood in 1963 for streets in Heathmont 'Tooronga, Devon, Doulton - Erica', 1963
Used by the City Engineer A C Robertson to receipt payments for concrete crossings to residents. Amounts vary from 47 pounds to 21 pounds 10 shillings. The average seemed to be 24 pounds 5 shillings.Green cardboard receipt book with yellow taped spine containing receipts No 1501 - 1600 for concrete crossings done by the City of Ringwood in 1963 for streets in Heathmont 'Tooronga, Devon, Doulton - Erica.' +Additional Keywords: Robertson, A Cas above -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Concrete truck and workers spraying concrete, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows a concrete truck and workers spraying concrete onto the pool.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Federation University Historical Collection
Photograph, Ballarat College of Advanced Education Ferro-concrete Canoe Race, 1977, 1977
Ballarat College of Advanced Education is a predecessor institution of Federation University Australia. .1) Engineering students carry a canoe at Lake Wendouree. .2) Five canoes in the water .3) Race .4) TrophyFour photographs of concrete canoe boat race events ballarat college of advanced education, student activities, canoes, lake wendouree -
Ringwood and District Historical Society
Photograph, 37-39 Ringwood Street, Ringwood. Pouring concrete in office building - 12/2/1982
Written on back of photograph, "Pouring concrete in office building on no.37-39 Ringwood Street. 12/2/82". -
Ringwood and District Historical Society
Photograph, 37-39 Ringwood Street, Ringwood. Pouring concrete on first floor of new offices. 25/3/1982
Written on back of photograph, "Pouring concrete on first floor of 37-39 Ringwood Street - 25/3/82". -
Ballarat Heritage Services
Photograph, Concrete Bridge Over Lake Daylesford, 2020, 2020
Colour photographs of the concrete bridge over laker Daylesford built by the Country Road Board in 1929.lake daylesford, bridge, concrete bridge -
Kew Historical Society Inc
Photograph - Instructional photograph No.3: Using concrete for street kerbs, Portland Cement Association, 1921
One of seven photographs produced by the Portland Cement Association in 1921 showing how concrete kerbs could be created. Portland Cement Association (PCA) was founded in 1916. From 1917, the association actively promoted the benefits of concrete for road works in Australian newspapers. In the nineteenth century in Melbourne (Vic.) 'made roads' typically had gutters and kerbing lined with bluestone.The photographs are important evidence of the availability of instructional models for the use of concrete in street works in Victoria. While the photographs date from the early 1920s, the use of concrete for kerbing did not reach its maturity until after World War 2. The photos demonstrate knowledge about and the use of concrete in street works in a major Melbourne municipality at an early period.Black and white photograph with printed instructions on the reverse showing the production of concrete kerbing on 67th Street, West Allis, Milwaukee, Wisconsin (USA). The photograph was produced by the Portland Cement Association of Chicago in 1921 and used within the Chief Engineer's Department of the City of Kew (Vic.)."3rd - Metal template for Trimming Concrete 1/2" below Finished Surface ready for Application of Mortar facing." street works, kerbing, gutters, concrete, portland cement association -
Malmsbury Historical Society
Photograph (Item), Western Spillway concrete Overflow, Malmsbury ca1990
Buildings - Concrete Spillway -
Ringwood and District Historical Society
Geological specimen - Concrete block, Rough grey/black concrete block, part of Eastland demolition during November 2014
Part of Eastland demolition obtained through Probuild building contractors by Terry Ahern.Rough grey/black concrete block, part of Eastland demolition during November 2014 +Additional Keywords: Eastland / Probuild / Terry AhernPart of the old Eastland -
Federation University Historical Collection
Book, Halstead Press, Design of Reinforced Concrete, 1963, 1963
Hardcovered book with green, white and black dust Jacket. Includes receipt made out to the user, Brian Schreenan (engineer).concrete, reinforced concrete, sellers plate, robertson & mullens sellers plate, bookseller place -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Concrete complete, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows the completed concrete of the pool.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Spraying concrete 1, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows spraying concrete onto the pool floor.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way Greensborough.Digital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Spraying concrete 2, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows spraying concrete onto the pool floor.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Spraying concrete 3, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows spraying concrete onto the pool floor.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Spraying concrete onto the walls of the pool 1, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows workers spraying concrete onto the pool.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Spraying concrete onto the walls of the pool 2, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows workers spraying concrete onto the pool.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Concrete complete, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows the completed concrete base and sides of the pool.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Concrete and tiled edges complete, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows a spray lining being applied to the concrete pool.While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Greensborough Historical Society
Photograph - Digital Image, Watsonia High School Pool, Construction 1976. Spraying concrete onto the walls of the pool 3, 12/12/1976
The swimming pool at Watsonia High School was commenced in 1976 and opened in 1977. This photo shows workers spraying concrete onto the pool (distance shot).While the school has gone, the pool remains in 2019, operating as Yarra Swim School, Liat Way GreensboroughDigital copy of colour photograph, scanned from slide. Slide set at Item 6513.watsonia high school, swimming pools greensborough, yarra swim school -
Federation University Historical Collection
Book, Concrete Publications Limited, Statically-Inderterminate Structures, 1958
Blue hard cover book of 126 pagesnon-fictionstructures, engineering, continuous beams, single-span frames, arches, curved beams, plastic-hinge method -
Eltham District Historical Society Inc
Negative - Photograph, Construction of the new concrete bridge over the Diamond Creek on Main Road, Eltham, c.May 1926
Construction of the new concrete bridge over the Diamond Creek on Main Road, Eltham, c.May 1926. Viewed from present day Wingrove Park. The original long suspension bridge over the Diamond Creek on Main Road at Eltham collapsed during flooding of the Diamond Creek on October 13 and 14, 1923. The original bridge was built around 1840 for the coach road when Cobb & Co.'s coach was the only conveyance between Eltham and Melbourne. Widespread damage was done in Melbourne and surrounding areas by floods resulting from the overflow of the Yarra at many points along its banks. A temporary bridge rigged up was severely damaged by the flooding of the creek and was closed to vehicular traffic in April 1924. A new concrete bridge was constructed to replace it and by May 1926 all the concrete piles and abutments had been completed. The bridge was finally completed and opened for traffic in September 1926, almost three years after it initially collapsed.This photo forms part of a collection of photographs gathered by the Shire of Eltham for their centenary project book,"Pioneers and Painters: 100 years of the Shire of Eltham" by Alan Marshall (1971). The collection of over 500 images is held in partnership between Eltham District Historical Society and Yarra Plenty Regional Library (Eltham Library) and is now formally known as the 'The Shire of Eltham Pioneers Photograph Collection.' It is significant in being the first community sourced collection representing the places and people of the Shire's first one hundred years.Digital image 4 x 5 inch B&W Neg Print 9 x 12.5 cmshire of eltham pioneers photograph collection, eltham, eltham lower park, main road bridge, eltham south, bridge, diamond creek (creek), wingrove park, bridge construction -
University of Melbourne, Burnley Campus Archives
Plan, Flat Concrete Roof & New Staff Room, 1981
(1) Photocopy of plan showing Flat Concrete Roof and New Staff Room. (2) Title of a plan which is probably of (1). Internal Modifications dated 4.6.81 by J.T. Crean, Ass't Director of Public Works. Donated by Sandi Pullman 2012.staff, sandra pullman -
Eltham District Historical Society Inc
Negative - Photograph, Construction of the new concrete bridge over the Diamond Creek on Main Road, Eltham, c.May 1926
Construction of the new concrete bridge over the Diamond Creek on Main Road, Eltham, c.May 1926. Viewed from northern approach looking south east towards Eltham Park (Eltham Lower Park), showing the power lines that used to run in front of the park. The original long suspension bridge over the Diamond Creek on Main Road at Eltham collapsed during flooding of the Diamond Creek on October 13 and 14, 1923. The original bridge was built around 1840 for the coach road when Cobb & Co.'s coach was the only conveyance between Eltham and Melbourne. Widespread damage was done in Melbourne and surrounding areas by floods resulting from the overflow of the Yarra at many points along its banks. A temporary bridge rigged up was severely damaged by the flooding of the creek and was closed to vehicular traffic in April 1924. A new concrete bridge was constructed to replace it and by May 1926 all the concrete piles and abutments had been completed. The bridge was finally completed and opened for traffic in September 1926, almost three years after it initially collapsed.This photo forms part of a collection of photographs gathered by the Shire of Eltham for their centenary project book,"Pioneers and Painters: 100 years of the Shire of Eltham" by Alan Marshall (1971). The collection of over 500 images is held in partnership between Eltham District Historical Society and Yarra Plenty Regional Library (Eltham Library) and is now formally known as the 'The Shire of Eltham Pioneers Photograph Collection.' It is significant in being the first community sourced collection representing the places and people of the Shire's first one hundred years.Digital image 4 x 5 inch B&W Negshire of eltham pioneers photograph collection, bridge, bridge construction, cement mixer, diamond creek (creek), eltham, eltham lower park, eltham south, main road bridge -
Greensborough Historical Society
Photograph - Digital image, Marilyn Smith et al, Janefield Precinct: Preserved concrete edging, 27/11/2014
Janefield Precinct: Preserved concrete edging. The remains of this site are between Greensborough and Janefield. A RAAF Hygiene Training Camp was located on the Plenty River, just south of the Janefield community. It was in use from 1944 to 1946. The Camp was constructed from salvaged materials. Instruction included building and maintenance of grease traps, latrines, elementary plumbing and carpentry.Early remains of a WW2 training camp Digital colour photograph.raaf hygiene training camp janefield