Showing 12 items matching " napoleon bml"
-
Bendigo Historical Society Inc.Document - NEW CHUM & VICTORIA LINES OF REEF - BENDIGO GOLDFIELD
... ... Napoleon BML...History House 11 Mackenzie Street Bendigo goldfields DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria Lines of Reef Bendigo Goldfield Mines Dept New Chum Cons New Chum United Eureka Extd South Belle Vue Old Chum New Chum & Victoria Lansell Big 180 Ellenborough St Mungo Sth St Mungo Little 180 Mining Register 1893 - 1902 M D Annual Reports 1902 on Mines Dept Quarterly to 1892 South New Moon Hercules Ironbark Ironbark South Central R W & Blue Stanfield Hercules No 1 North Nell Gwynne New Chum Syncline Central Nell Gwynne Carshalton B M L Napoleon BML Nell Gwynne BML Nell Gwynne Reefs Monument Hill Central Deborah North Deborah Deborah South Deborah Neangar Lightning Hill Alliance Shellbach South Virginia Catherine Reef United Belmont & Saxby Lady Barkly Unity Vict Quartz New Argus New Chum Railway Garden Gully United Handwritten notes listing Bendigo Mines, their years of operation, ounces of gold taken out, Dividends, Calls, and depth of shaft. ...Handwritten notes listing Bendigo Mines, their years of operation, ounces of gold taken out, Dividends, Calls, and depth of shaft. Some of the mines only have the year they ceased operations mentioned. Dated 1/3/67. Also, a typed copy.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, bendigo goldfield, mines dept, new chum cons, new chum united, eureka extd, south belle vue, old chum, new chum & victoria, lansell big 180, ellenborough, st mungo, sth st mungo, little 180, mining register 1893 - 1902 m d annual reports 1902 on, mines dept quarterly to 1892, south new moon, hercules, ironbark, ironbark south, central r w & blue, stanfield, hercules no 1, north nell gwynne, new chum syncline, central nell gwynne, carshalton b m l, napoleon bml, nell gwynne bml, nell gwynne reefs, monument hill, central deborah, north deborah, deborah, south deborah, neangar, lightning hill, alliance, shellbach, south virginia, catherine reef united, belmont & saxby, lady barkly, unity, vict quartz, new argus, new chum railway, garden gully united -
Bendigo Historical Society Inc.Photograph - Napoleon Ore Bins, 1935
... Black and white photograph: framework for ore bins at Napoleon (BML) Gold Mine, being erected alongside head frame at mine site. ...Napoleon Gold Mine anticline Written in pencil on back of photograph : 'Erecting ore bins at Napoleon 27/8/56' Black and white photograph: framework for ore bins at Napoleon (BML) Gold Mine, being erected alongside head frame at mine site. ...Significant to mining history of Bendigo.Black and white photograph: framework for ore bins at Napoleon (BML) Gold Mine, being erected alongside head frame at mine site. Trestle way visible in extreme top of image. Written in pencil on back of photograph : 'Erecting ore bins at Napoleon 27/8/56'napoleon gold mine, anticline -
Bendigo Historical Society Inc.Photograph - Napoleon Main Pump, 1936
... Black and white photograph: pump machinery in underground at Napoleon (BML) Gold Mine. Image shows machinery, with steel control box at far left hand side. ...(illegible) pump No. 10 plat Napoleon 15/9/36 '' Black and white photograph: pump machinery in underground at Napoleon (BML) Gold Mine. Image shows machinery, with steel control box at far left hand side. ...Significant to mining history of Bendigo.Black and white photograph: pump machinery in underground at Napoleon (BML) Gold Mine. Image shows machinery, with steel control box at far left hand side. Safety rail in front of machinery. Rock wall behind. Written in pencil on back of photograph : '....(illegible) pump No. 10 plat Napoleon 15/9/36 ''napoleon gold mine, plat, pump -
Bendigo Historical Society Inc.Photograph - Napoleon Sinking Winch, 1936
... Black and white photograph: sinking winch machinery supported on concrete block, underground at the Napoleon (BML) gold mine. Two men, one standing at back of machinery left hand side, and one standing on concrete platform operating a pulley....(illegible) sinking winch No. 10 plat Napoleon 15/9/36'' Black and white photograph: sinking winch machinery supported on concrete block, underground at the Napoleon (BML) gold mine. Two men, one standing at back of machinery left hand side, and one standing on concrete platform operating a pulley. ...Significant to mining history of Bendigo.Black and white photograph: sinking winch machinery supported on concrete block, underground at the Napoleon (BML) gold mine. Two men, one standing at back of machinery left hand side, and one standing on concrete platform operating a pulley.Written in pencil on back of photograph : '....(illegible) sinking winch No. 10 plat Napoleon 15/9/36''napoleon gold mine, sinking winch, plat -
Bendigo Historical Society Inc.Photograph - Napoleon Reef Gold Mine Battery Site, 1936
... The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...History House 11 Mackenzie Street Bendigo goldfields The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. It had a depth of 921 feet. It was one of the latest and most lavish of Bendigo's mines. Plant and equipment were electrically driven. The four-compartment shaft, extra large by goldfield's standards, measured 17 feet 6 inches by 5 feet 2 inches and was cement lined below 900 feet instead of being red gum boxed as was the usual practice. The workshop was equipped to carry out all repairs for the equally lavish BML mines on the Nell Gwynne and Carshalton reefs. (The Gold Mines of Bendigo, Book 2, Arthur Victor Palmer)Significant to mining history of Bendigo.Black and white photograph. Image shows flat, open landscape with four large eucalypt trees in centre of image. Four men working with shovels on left hand side of image, one man with wheelbarrow and dog alongside. Wooden framed structure on right hand side. Written in pencil on back of photograph: ' Battery excavations started 22/9/36' and 'excavations started'.napoleon gold mine, napoleon reef gold mine -
Bendigo Historical Society Inc.Photograph - Napoleon Reef Gold Mine Battery Site, 1936
... The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...History House 11 Mackenzie Street Bendigo goldfields The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. It had a depth of 921 feet. It was one of the latest and most lavish of Bendigo's mines. Plant and equipment were electrically driven. The four-compartment shaft, extra large by goldfield's standards, measured 17 feet 6 inches by 5 feet 2 inches and was cement lined below 900 feet instead of being red gum boxed as was the usual practice. The workshop was equipped to carry out all repairs for the equally lavish BML mines on the Nell Gwynne and Carshalton reefs. (The Gold Mines of Bendigo, Book 2, Arthur Victor Palmer)Significant to mining history of Bendigo.Black and white photograph of a stamper head being lowered into position on the battery site of the Napoleon Reef Gold Mine. A wooden gantry supports the battery head as it being lowered, a man is standing on top of the stamper head. Concrete foundations are visible in immediate background. napoleon gold mine, napoleon reef gold mine -
Bendigo Historical Society Inc.Photograph - Napoleon Mine Battery, 1936
... The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...History House 11 Mackenzie Street Bendigo goldfields The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. It had a depth of 921 feet. It was one of the latest and most lavish of Bendigo's mines. Plant and equipment were electrically driven. The four-compartment shaft, extra large by goldfield's standards, measured 17 feet 6 inches by 5 feet 2 inches and was cement lined below 900 feet instead of being red gum boxed as was the usual practice. The workshop was equipped to carry out all repairs for the equally lavish BML mines on the Nell Gwynne and Carshalton reefs. (The Gold Mines of Bendigo, Book 2, Arthur Victor Palmer)Significant to mining history of Bendigo.Black and white photograph: battery shed under erectionWritten in pencil on back of photograph: 'battery erection 17/1`1/36' and 'cracker station building' napoleon gold mine, napoleon reef gold mine -
Bendigo Historical Society Inc.Photograph - Napoleon Mine Battery, 1936
... The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...History House 11 Mackenzie Street Bendigo goldfields The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. It had a depth of 921 feet. It was one of the latest and most lavish of Bendigo's mines. Plant and equipment were electrically driven. The four-compartment shaft, extra large by goldfield's standards, measured 17 feet 6 inches by 5 feet 2 inches and was cement lined below 900 feet instead of being red gum boxed as was the usual practice. The workshop was equipped to carry out all repairs for the equally lavish BML mines on the Nell Gwynne and Carshalton reefs. (The Gold Mines of Bendigo, Book 2, Arthur Victor Palmer)Significant to mining history of Bendigo.Black and white photograph: landscape view of mine sheds. Battery shed fully completed with trestleway to another shed. Trees in background. Written in pencil on back of photograph: 'completed battery 5/12/36'napoleon gold mine, napoleon reef gold mine -
Bendigo Historical Society Inc.Photograph - Napoleon Mine Battery, 1936
... The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...History House 11 Mackenzie Street Bendigo goldfields The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. ...The Napoleon (BML) gold mine (1932) was located beside McDougall Road, Golden Gully, between Martin and Hattam Street. It had a depth of 921 feet. It was one of the latest and most lavish of Bendigo's mines. Plant and equipment were electrically driven. The four-compartment shaft, extra large by goldfield's standards, measured 17 feet 6 inches by 5 feet 2 inches and was cement lined below 900 feet instead of being red gum boxed as was the usual practice. The workshop was equipped to carry out all repairs for the equally lavish BML mines on the Nell Gwynne and Carshalton reefs. (The Gold Mines of Bendigo, Book 2, Arthur Victor Palmer)Significant to mining history of Bendigo.Black and white photograph: battery under construction, concrete bottom blocks being 'boxed' up .Written in pencil on back of photograph: 'another new daring creation' and ' boxing the foundation 7/10/36'.napoleon gold mine, napoleon reef gold mine -
Bendigo Historical Society Inc.Photograph - Napoleon Reef Gold Mine Battery Site, 1936
... The Napoleon (BML) gold mine (1932) was located near McDougall Road, Golden Gully, between Martin and Hattam Street. ...History House 11 Mackenzie Street Bendigo goldfields The Napoleon (BML) gold mine (1932) was located near McDougall Road, Golden Gully, between Martin and Hattam Street. ...The Napoleon (BML) gold mine (1932) was located near McDougall Road, Golden Gully, between Martin and Hattam Street. It had a depth of 921 feet. It was one of the latest and most lavish of Bendigo's mines. Plant and equipment were electrically driven. The four-compartment shaft, extra large by goldfield's standards, measured 17 feet 6 inches by 5 feet 2 inches and was cement lined below 900 feet instead of being red gum boxed as was the usual practice. The workshop was equipped to carry out all repairs for the equally lavish BML mines on the Nell Gwynne and Carshalton reefs. (The Gold Mines of Bendigo, Book 2, Arthur Victor Palmer) 'Napoleon BML Mines No Liability have issued a report for the fortnight ended September 5, where it states that the development scheme has been formulated and necessary equipment is being ordered. The Napoleon main shaft, (about 1700 feet south of the old Napoleon shaft) will be a four compartment shaft (17ft 6 inches by ft 2 inches inside the timber). aLevels will be opened at approximately 100 ft vertical intervals and cross-cuts extended approximately 125 ft each side of centre country to explore a cross-section across the anticline opposite to the shaft. At every fifth level, main drives will be extended north to connect with the old Napoleon shaft and south approximately 1800 ft. At the latter point, another cross-section of the anticline will be explored by rising and cross-cutting. The old Napoleon will be unwatered and on the 500ft and 1000 ft levels main drives will be driven to connect with main levels from the Napoleon main shaft to the south as well as being driven north 1800 ft where another cross-section of the anticline will be explored. Cross-sections further north and south may be developed as desired and also at intermediate points if necessary. Clearing and grading of the main shaft site are now in progress and the erection of the office and store building is proceeding. The design of engine room, change house and machine shops is now in hand and erection will proceed as soon as working plans and specifications are prepared.' The main shaft has been commenced at 3ft and advanced 10 ft. to 13 ft. https://trove.nla.gov.au/newspaper/article/10975478?searchTerm=napoleon%20bml (The Argus, 8th. September 1934, 'Mining' page 18) Significant to mining history of Bendigo.Black and white photograph of a stamper head being lowered into position on the battery site of the Napoleon Reef Gold Mine. A wooden gantry supports the battery head as it being lowered. Three large concrete foundations are visible in immediate background, two of which have stampers already in position, the third stamper is being lowered onto the final foundation. In immediate foreground, 'boxing' is erected for future concrete pours. napoleon gold mine, napoleon reef gold mine -
Bendigo Historical Society Inc.Document - LISTS OF ITEMS AUCTIONED AT BENDIGO MINES
... Coy 18th August 1938 Ross Creek Extended G.M.Coy Ross Creek Mines Account Mines Dept Pitfield Plains, Glenfine South Shaft Adelong Dredge and leases 10th February 1943 Bright Valley Dredge 9,10th February 1943 Exchequer Extended North Chewton 18th October, 1939 Talbot Alluvials Norbury's No. 2 shaft 5th May 1941 Gordon Gold Mine Inglewood 30th April 1940 Postg Office Hill Mine Chewton 7th February 1940 Carlisle & Whittaker Plant Buninyong Rand Yandoit Mine North Chewton 19th October 1939 Spring Gully Mine Chewton 14th Decembert 1938 Eureka Central Chewton 26th February 1941The Golod Mine Clunes 15th March 1941 Guildford Plateau 20th Novemer 1940 New Long Tunnel Walhalla 12th February 1941 Napoleon BML 28th October 1941 Alfords Battery Hercules No. 1 Mine 12th February 1942 Ramrod Gold Mine Bendigo 19th March 1942 Bendigo Amalgamated Goldfields Limited 10th and 11th August 1938 Virginia South Extended 1st June 1938...Coy 18th August 1938 Ross Creek Extended G.M.Coy Ross Creek Mines Account Mines Dept Pitfield Plains, Glenfine South Shaft Adelong Dredge and leases 10th February 1943 Bright Valley Dredge 9,10th February 1943 Exchequer Extended North Chewton 18th October, 1939 Talbot Alluvials Norbury's No. 2 shaft 5th May 1941 Gordon Gold Mine Inglewood 30th April 1940 Postg Office Hill Mine Chewton 7th February 1940 Carlisle & Whittaker Plant Buninyong Rand Yandoit Mine North Chewton 19th October 1939 Spring Gully Mine Chewton 14th Decembert 1938 Eureka Central Chewton 26th February 1941The Golod Mine Clunes 15th March 1941 Guildford Plateau 20th Novemer 1940 New Long Tunnel Walhalla 12th February 1941 Napoleon BML 28th October 1941 Alfords Battery Hercules No. 1 Mine 12th February 1942 Ramrod Gold Mine Bendigo 19th March 1942 Bendigo Amalgamated Goldfields Limited 10th and 11th August 1938 Virginia South Extended 1st June 1938 Document LISTS OF ITEMS AUCTIONED AT BENDIGO MINES ...Typed copies of catalogues of items to be auctioned at the following mines: South Red, White and Blue 12th April 1938 Central Blue 28th October, 1941 at 11 a.m South Virginia Extended (found inside Central Blue catalogue) Big Blue 21st November, 1939 at 10.30 a.m Golden Transverse Bendigo 3rd September 1941Yandoit Co 19th April 1939 Chapman's Gold Mine Chewton 8th February 1939 Ross Creek Extended G.M. Coy 18th August 1938 Ross Creek Extended G.M.Coy Ross Creek Mines Account Mines Dept Pitfield Plains, Glenfine South Shaft Adelong Dredge and leases 10th February 1943 Bright Valley Dredge 9,10th February 1943 Exchequer Extended North Chewton 18th October, 1939 Talbot Alluvials Norbury's No. 2 shaft 5th May 1941 Gordon Gold Mine Inglewood 30th April 1940 Postg Office Hill Mine Chewton 7th February 1940 Carlisle & Whittaker Plant Buninyong Rand Yandoit Mine North Chewton 19th October 1939 Spring Gully Mine Chewton 14th Decembert 1938 Eureka Central Chewton 26th February 1941The Golod Mine Clunes 15th March 1941 Guildford Plateau 20th Novemer 1940 New Long Tunnel Walhalla 12th February 1941 Napoleon BML 28th October 1941 Alfords Battery Hercules No. 1 Mine 12th February 1942 Ramrod Gold Mine Bendigo 19th March 1942 Bendigo Amalgamated Goldfields Limited 10th and 11th August 1938 Virginia South Extended 1st June 1938 -
Bendigo Historical Society Inc.Document - NORTH DEBORAH , DEBORAH, CENTRAL NELL GWYNNE AND NAPOLEON GOLD MINES
... Napoleon: first subsidiary company formed by BML to carry out comprehensive programme of development along Napoleon anticline. ...Napoleon: first subsidiary company formed by BML to carry out comprehensive programme of development along Napoleon anticline. ...Five interpretive cards used for displays, yellow with black and orange text, describing the North Deborah, Deborah, Central Nell Gwynne and Napoleon Gold Mines. a. North Deborah: closed 16th November 1954. Shaft was 1300 feet deep. Total dividends 686,200 pounds. b. Deborah: underground operations suspended 1952, shaft 2076 feet. c. Central Nell Gwynne: operations ceased at end of 1949, shaft depth 1933 feet. d. Napoleon: first subsidiary company formed by BML to carry out comprehensive programme of development along Napoleon anticline. Shaft 1054 feet in 1937 when opertions ceased. e. Devonshire Sands, formed in 1933. Cyanide leaching plants installed on sand tailings heaps at Bendigo.Albert Richardsonbendigo, mining, north deborag mining company