Showing 4 items matching "flood mitigation"
-
Sunshine and District Historical Society IncorporatedDocument - Maribyrnong River Flood Mitigation Study Executive Summary March 1996, Melbourne And Metropolitan Board of Works (MMBW)
... Maribyrnong River Flood Mitigation Study Executive Summary March 1996...Melbourne And Metropolitan Board of Works Maribyrnong River Flood Mitigation Study Executive Summary March 1986...Part of the gwen Goedecke Collection Maribyrnong River Floood Melbourne And Metropolitan Board of Works Maribyrnong River Flood Mitigation Study Executive Summary March 1986 Ring bound document with coloured photo of the Maribyrnong River Document Maribyrnong River Flood Mitigation Study Executive Summary March 1996 Melbourne And Metropolitan Board of Works (MMBW) ...Part of the gwen Goedecke CollectionMelbourne And Metropolitan Board of Works Maribyrnong River Flood Mitigation Study Executive Summary March 1986maribyrnong river, floood -
Clunes MuseumPlan - PLANS, Harry E Sando, Borough of Clunes Contract 96.6 of 1893/4, c1894
... ...Flood mitigation...(Borough Enginee) as at 10th March 1894, this plan also signed by the contactor and witness, both signatures are illegible Creswick Creek Flood mitigation Weir System Headings on plans; "Ground Plan No.1, Ground Plan No.2, Sections of weirs Coloured drawings on tracing/architects papers, pinned with dress makers pins to stiff paper. ...Harry E Sando C.E. (Borough Enginee) as at 10th March 1894, this plan also signed by the contactor and witness, both signatures are illegibleColoured drawings on tracing/architects papers, pinned with dress makers pins to stiff paper. Scale 2 feet to 1 inchHeadings on plans; "Ground Plan No.1, Ground Plan No.2, Sections of weirscreswick creek, flood mitigation, weir system -
Orbost & District Historical Societyplan, before 1948
... (ref. 4 East Gippsland CMA Submission to Inquiry into Flood Mitigation Infrastructure in Victoria) ...(ref. 4 East Gippsland CMA Submission to Inquiry into Flood Mitigation Infrastructure in Victoria) This plan is significant as a historical document. ...Drainage infrastructure was developed and maintained in this region by the Snowy River Improvement Trust. The Trust was administered by a local committee and its activities funded by a local rate charged on the farmers and land owners in the Trust’s designated district. The level of the rate charged by the Trust was designed to be proportionate to the benefit derived from the works undertaken. Financial assistance was provided by the State Government from time to time for specific projects such as post flood repairs but not for new capital works. The Trust undertook new drainage and river management works including tree planting, rock beach construction and servicing of the drains and flood gates. The Trust also provided a personal flood warning service to the farmers in its district. The Trust ceased to operate in 1997 with the advent of the East Gippsland Catchment Management Authority. The infrastructure developed by the Trust continues to provide a service to the farmers in the region. (ref. 4 East Gippsland CMA Submission to Inquiry into Flood Mitigation Infrastructure in Victoria) This plan is significant as a historical document. The Snowy River Improvement Trust was vital to the Orbost district because of its ability to apply local knowledge and to engage the local farming community.A large plan of divisions of land for the purpose of levying the Snowy River Improvement District - Bete Bolong, Orbost, Waygara, Newmerella and Orbost East. The properties are coloured according to levy amount. The scale is 1" - 20 chains. snowy-river-improvement-trust -
Wodonga & District Historical Society IncBook - Hume and Dartmouth Dams : Operations Review Final Report and Recommendations, Hume and Dartmouth Dams Operations Review Reference Panel, May 1999
... The Panel’s terms of reference were essentially to consider how the operating rules might be amended to better address the competing objectives of water supply, environmental enhancement and flood mitigation. This report includes summaries of feedback considered by the reference panel as well as its final recommendations. ...During 1997 and 1998, the Hume and Dartmouth Dams Operations Review Reference Panel has undertaken a broadly based review of the way in which these two major water storages were operated. The Panel’s terms of reference were essentially to consider how the operating rules might be amended to better address the competing objectives of water supply, environmental enhancement and flood mitigation. This report includes summaries of feedback considered by the reference panel as well as its final recommendations.non-fictionDuring 1997 and 1998, the Hume and Dartmouth Dams Operations Review Reference Panel has undertaken a broadly based review of the way in which these two major water storages were operated. The Panel’s terms of reference were essentially to consider how the operating rules might be amended to better address the competing objectives of water supply, environmental enhancement and flood mitigation. This report includes summaries of feedback considered by the reference panel as well as its final recommendations.hume reservoir nsw, dartmouth dam victoria, water management
