Showing 3 items matching "g.o.r. landslip windy=point"
-
Lorne Historical SocietyPhotograph, Great Ocean Road. Windy point land slip
... Great Ocean Road. G.O.R. Landslip. Windy Point. 1971...Holes were drilled in the rock and large cables inserted and concrete forced in around them Great Ocean Road. G.O.R. Landslip. Windy Point. 1971 Great Ocean Road. This was some of the machinery used in stabilizing the G.O.R. at Windy Point, between the St George River and the Sheoak River. ...1971. This was some of the machinery used in stabilsing the Great Ocean Road between the St George's River and the Sheok River. Holes were drilled in the rock and large cables inserted and concrete forced in around themGreat Ocean Road. This was some of the machinery used in stabilizing the G.O.R. at Windy Point, between the St George River and the Sheoak River. Holes were drilled in the rock and large cables inserted and concrete fixed around them. This took place in late 1971great ocean road. g.o.r. landslip. windy point. 1971 -
Lorne Historical SocietyPhotograph, Landslip at Windy Point
... G.O.R. Landslip Windy=Point...Lorne Historical Society Lorne Community House Mountjoy Parade Lorne great-ocean-road G.O.R. Landslip Windy=Point 1971 Photograph of workmen working at the landslip at Windy Point 1971 Landslip at Windy Point Photograph Photograph ...Photograph of workmen working at the landslip at Windy Point 1971g.o.r. landslip windy=point, 1971 -
Lorne Historical SocietyPhotograph, Landslip Great Ocean Road 1971
... Lorne Historical Society Lorne Community House Mountjoy Parade Lorne great-ocean-road land-slip 1971: Windy-Point; cable-locks. concrete securing blocks. maintenance equipment Repairing land-slip at Windy-Point, showing cables that secured the face of the cliff. These cables ends are cut off and a concrete slab placed over the plate. Working machine below on the G.O.R. and workman holding stop/go sign. Landslip ...Repairing land-slip at Windy-Point, showing cables that secured the face of the cliff. These cables ends are cut off and a concrete slab placed over the plate. Working machine below on the G.O.R. and workman holding stop/go sign.land-slip 1971: windy-point; cable-locks. concrete securing blocks. maintenance equipment
