Showing 536 items
matching rail line
-
Greensborough Historical Society
Photograph - Photograph - Digital Image, Marilyn Smith, Poulter Avenue power station - Greensborough Railway Station 2021, 2021_02
... hurstbridge rail line upgrade... rebuild of the station as part of the Hurstbridge rail line... line upgrade. greensborough railway station hurstbridge rail ...Photographs of Poulter Avenue power station at Greensborough Railway Station in February 2021, before the planned rebuild of the station as part of the Hurstbridge rail line upgrade. 4 Colour digital photographsgreensborough railway station, hurstbridge rail line upgrade, poulter avenue greensborough -
Greensborough Historical Society
Newspaper Clipping - Digital Image, Bridge-over-rail job to cost $254,000, 1974 [Main Street Greensborough], 24/09/1974
... hurstbridge rail line... of the bridge was necessary for the duplication of the rail line between... for the duplication of the rail line between Macleod and Greensborough ...In 1974 the proposed road over rail bridge in Main Street Greensborough was estimated to cost $254,000. The reconstruction of the bridge was necessary for the duplication of the rail line between Macleod and Greensborough.News clipping, black and white text. hurstbridge rail line, greensborough station, main street greensborough -
Greensborough Historical Society
Photograph - Photograph - Digital Image, Marilyn Smith, Poulter Avenue power station, architectural features - Greensborough Railway Station 2021, 2021_02
... hurstbridge rail line upgrade... of the Hurstbridge rail line upgrade. ... of the station as part of the Hurstbridge rail line upgrade ...Photographs of architectural features at Poulter Avenue power station at Greensborough Railway Station in February 2021, before the planned rebuild of the station as part of the Hurstbridge rail line upgrade. 5 Colour digital photographsgreensborough railway station, hurstbridge rail line upgrade, poulter avenue greensborough -
Greensborough Historical Society
Pamphlet - Newsletter, Victorian Government, Victoria's big build; North and North East edition. Issue 01/2021, 2021
... hurstbridge rail line... Road upgrades, Hurstbridge rail line duplication and level... Road upgrades, Hurstbridge rail line duplication and level ...An update on major projects in Victoria, named "Victoria's Big Build" including the North East Link Project, M80 Ring Road upgrades, Hurstbridge rail line duplication and level crossing removals. 8 p., colour illus. and map. north east link, victoria's big build, western ring road, hurstbridge rail line -
Greensborough Historical Society
Photograph - Digital Image, Watsonia Railway Station before 1970, 1960s
... hurstbridge rail line... the rail line was lowered to remove level crossings and duplicate... in 1977 when the rail line was lowered to remove level crossings ...Watsonia Station before the 1970s. This photograph shows the old station. The new Watsonia Station was opened in 1977 when the rail line was lowered to remove level crossings and duplicate the line between Macleod and Greensborough.Digital copy of black and white photographwatsonia station, hurstbridge rail line -
Greensborough Historical Society
Photograph - Digital Image, Watsonia Railway Station before 1970, 1960s
... hurstbridge rail line... was opened in 1977 when the rail line was lowered to remove level... Watsonia Station was opened in 1977 when the rail line was lowered ...Watsonia Station before the 1970s. This photograph shows the rail crossing at the old station. The new Watsonia Station was opened in 1977 when the rail line was lowered to remove level crossings such as this and duplicate the line between Macleod and Greensborough.Digital copy of black and white photographwatsonia station, hurstbridge rail line -
Greensborough Historical Society
Photograph - Digital Image, Building Watsonia Station 1975, 1975_
... hurstbridge rail line... Station was opened in 1977 when the rail line was lowered... when the rail line was lowered to remove level crossings ...Building Watsonia Station circa 1975. This photograph shows the framework for the new station being installed. The new Watsonia Station was opened in 1977 when the rail line was lowered to remove level crossings and duplicate the line between Macleod and Greensborough.Digital copy of colour photographwatsonia station, hurstbridge rail line -
Sunbury Family History and Heritage Society Inc.
Photograph, Shannon Richards, Sunbury Station, March 2001
... Bendigo Rail Line... on the Sunbury Bendigo Rail line to accommodate new and larger carriages... on the Sunbury Bendigo Rail line to accommodate new and larger carriages ...In 2000 major renovation works were carried out on the Sunbury Bendigo Rail line to accommodate new and larger carriages which were going to replace older trains. Major work at Sunbury included extending the platforms and replacing an old wooden pedestrian bridge with a larger one the included a series of ramps and a clock tower as well as a new pedestrian bridge.A non-digital coloured photograph of a series of ramps over railway tracks with a clock tower. The photograph was an entry in the Junior section of a photographic competition organised by the Sunbury & District Heritage Association in March 2001. sunbury railway station, sunbury, railways, bendigo rail line -
Whitehorse Historical Society Inc.
Article, Blackburn Level Crossing
... To allow the rail line to be lowered under Blackburn Road... for the rail line to be lowered under Blackburn Road. More than 1,000... Mitcham melbourne To allow the rail line to be lowered under ...Blackburn Road level Crossing was closed for 2 weeks.Blackburn Road level Crossing was closed for 2 weeks for the rail line to be lowered under Blackburn Road. More than 1,000 piles will be drilled to reinforce the rail corridor which is due to be completed 2017.Blackburn Road level Crossing was closed for 2 weeks. level crossing removal authority, blackburn road, blackburn railway crossing, blackburn railway station -
Eltham District Historical Society Inc
Photograph, Peter Pidgeon, Victorian Labor Government Press Release announcing planned upgrades to Hurstbridge line rail services and protection of historic Railway Trestle Bridge, Panther Place, Eltham, 1 August 2018, 1 Aug 2018
... upgrades to Hurstbridge line rail services and protection of... to Hurstbridge line rail services and protection of historic Railway ...Announcement by Premier Daniel Andrews, Minister for Public Transport, Jacinta Allan and Member for Eltham, Vicki Ward mad alongside the Eltham Railway Trestle Bridge. MEDIA RELEASE "More Trains And Fewer Delays On The Hurstbridge Line" https://www.premier.vic.gov.au/wp-content/uploads/2018/08/180801-More-Trains-And-Fewer-Delays-On-The-Hurstbridge-Line-1.pdf Commuters on the Hurstbridge line will have more trains, more seats and fewer delays with a re-elected Andrews Labor Government to continue its massive upgrade of the Hurstbridge line. The Andrews Labor Government said it would deliver locals in Melbourne’s north-east more peak hour train services and less time stuck at boom gates, and we have. The first stage of the Hurstbridge Line Upgrade has been delivered – six months early and on budget. This includes the new Rosanna Station, duplicated track between Heidelberg and Rosanna and the removal of the dangerous level crossings at Alphington and Rosanna. There’s more to do and only Labor will deliver the next stage of the Hurstbridge Line Upgrade to give local commuters more train services and a more comfortable commute. The $530 million project will include a brand new train station at Greensborough and the duplication of three kilometres of track between Greensborough and Montmorency, and 1.5 kilometres of track between Diamond Creek and Wattle Glen to allow more train services during the morning peak. This will allow trains to run every six and a half minutes at Greensborough, every 10 minutes at Eltham and Montmorency, and every 20 minutes at Hurstbridge, Diamond Creek and Wattle Glen – as well as two extra Hurstbridge express services. Locals on the Labor Government’s new Mernda line will also get five extra train services during the morning peak, with a major upgrade of the Clifton Hill junction where the Mernda and Hurstbridge lines connect. Labor will also protect the Eltham Trestle Bridge – the last remaining timber bridge on Melbourne’s electric train network – which has local heritage protection and is an important part of the area’s character. The Liberals will leave this bridge to rot and demolish the nearby childcare centre and football club with their under-cooked and under-costed promise to upgrade the Hurstbridge line. Only Labor will protect this important piece of Melbourne’s history with planning work to be carried out for a long-term solution as part of the project. Stage two of the Hurstbridge Line Upgrade will create more than 950 jobs, with construction to start in 2020 and finish by 2022. Quotes attributable to Premier Daniel Andrews “We said we’d upgrade the Hurstbridge line and remove dangerous and congested level crossings at Rosanna and Alphington and we did – but there’s more to do.” “Only Labor will deliver the next stage of the Hurstbridge Line Upgrade with a new Greensborough Station and more trains, more often.” Quote attributable to Minister for Public Transport Jacinta Allan “The former Liberal Government promised new train lines but didn’t deliver a single kilometre of track – now they’re promising a half-baked upgrade of the Hurstbridge line with rubbery figures that don’t add up.” Quote attributable to Member for Eltham Vicki Ward “As a fifteen year old hopping on Red Rattlers at Eltham I wanted to do something to make the Hurstbridge line better. It’s taken me a few decades but finally our line will offer the frequency of services that are expected and needed in a 21st century city.”Born digital image (qty 27)jacinta allan, minister for public transport, panther place, premier daniel andrews, press announcement, railway line construction, trestle bridge, vicki ward mp for eltham, victorian parliament -
Melbourne Tram Museum
Pamphlet, The Met, "Low Floor light rail for the Upfield line - it is a better way to go", c1989
... "Low Floor light rail for the Upfield line - it is a better... light rail for the Upfield line - it is a better way to go... light rail for the Upfield line - it is a better way to go ...Pamphlet - four fold DL size full colour titled "Low Floor light rail for the Upfield line - it is a better way to go", explaining or providing advice on the proposal for the conversion of the Upfield line to Light rail and timing. Has a map of the proposal - has a translation in 11 languages. Includes a map showing the proposals, project details, why, level crossings, rail services and timing and proposals for a shuttle along Sydney Road. Second copy added 17-7-2017.trams, tramways, light rail, upfield light rail, conversion, sydney rd -
Greensborough Historical Society
Newspaper Clipping, Diamond Valley Leader, Now, that's a change, 28/03/2018
... hurstbridge rail line upgrade... been removed hurstbridge rail line upgrade rosanna station ...Out with the old and in with the new. Boom gates at Rosanna Station on Lower Plenty Road have been removedNews article 1 page, black text and colour image .hurstbridge rail line upgrade, rosanna station, lower plenty road rosanna, hurstbridge rail line -
Greensborough Historical Society
Newspaper Clipping, Diamond Valley Leader, $307m rail pledge - Opposition committed to improving services to northeast, 18/04/2018
... greensborough to eltham rail line... to eltham rail line hurstbridge rail line News article 1 page, black ...The bustling Hurstbridge train line will be duplicated between Greensborough and Eltham if the Opposition wins this year's state election.News article 1 page, black text and colour image .opposition funding promise, greensborough to eltham rail line, hurstbridge rail line -
Puffing Billy Railway
Double Headed Rail, circa 1872 - 1883
... melbourne to echuca rail line, initially known as the... of the Melbourne to Echuca rail line, initially known as the Melbourne, Mt... of the Melbourne to Echuca rail line, initially known as the Melbourne, Mt ...Double Headed Rail from Ravenswood Station Siding which was dismantled circa 1987 the two rails were stored for a time at Maldon before being donated to Puffing Billy Museum Bearing makers marks of Wilson & Cammell - Dronfield- Steel works Wilson & Cammell made Steel rails at their Dronfield Steel Works, in Dronfield, North East Derbyshire, England from 1872 - 1883 Double-headed rail In late 1830s Britain, railway lines had a vast range of different patterns. One of the earliest lines to use double-headed rail was the London and Birmingham Railway, which had offered a prize for the best design. This rail was supported by chairs and the head and foot of the rail had the same profile. The supposed advantage was that, when the head became worn, the rail could be turned over and re-used. In practice, this form of recycling was not very successful as the chair caused dents in the lower surface, and double-headed rail evolved into bullhead rail in which the head was more substantial than the foot. Info from Wikipedia - Rail Profile https://en.wikipedia.org/wiki/Rail_profile The first records of double headed rail being used In Victoria by Victorian Railways was in 1859, the rails, chairs, oak and trenails were imported from UK. After the 1870’s the Victorian Railways went over to using flat bottom rails, but they still needed replacement double headed rail for lines already laid and this continued up to at least 1883 Wilson & Cammell - Dronfield- Steel works Wilson & Cammell made Steel rails at their Dronfield Steel Works, in Dronfield England from 1872 - 1883 Mount Alexander & Murray River Railway The Melbourne, Mount Alexander & Murray River Railway Company received parliamentary assent in February 1853 to build Victoria's first inland railway from Melbourne to Williamstown, and Melbourne to Bendigo and Echuca. Construction commenced in January 1854 with work on a pier at Williamstown but lack of funds slowed progress, eventually prompting the company to sell out to the government. The 100-mile (162 km) section to Bendigo opened in October 1862. Its cost of £35,000 per mile made it the most expensive railway ever built in Australia. In 1864, the line was extended to Echuca, tapping into the booming Murray-Darling paddlesteamer trade. info from Museums Victoria - Victorian Railways https://museumsvictoria.com.au/railways/theme.aspx?lvl=3&IRN=450&gall=456 1863 Ravenswood Station open on the 1st Feb 1863 Victorian Railways - purchased and imported the Rail and Chairs from Raleigh, Dalgleish, White and Co. London Importation of railway plant : abstract of a return to an order of the Legislative Assembly dated 27th June 1860 for - Copies of the advertisements calling for tenders, the names of the tenderers and the accounts and correspondence with Mr Brunel relating thereto GP V 1859/60 no. C 15 http://www.parliament.vic.gov.au/papers/govpub/VPARL1859-60NoC15.pdf Report from the Select Committee upon the Importation of Railway Plant : together with proceedings of the Committee, minutes of evidence and appendix GP V 1859/60 no. D 38 (2.9 MB) http://www.parliament.vic.gov.au/papers/govpub/VPARL1859-60NoD38.pdf Ravenswood Siding When the Victorian Railways were established in 1856 they adopted one of the popular British permanent way standards - heavy 80lb (36.3kg) double-headed rail held up right in cast iron chairs attached to transverse timber sleepers by wooden pegs called trenails. The Ravenswood Railway siding was constructed in 1862 with 12 feet wrought iron double-head rail held in cast iron chairs with Ransom and May patent compressed keys. Trenails held the chairs to the sleepers and the joints were secured in joint chairs. Joints were subsequently joined using fish plates. It formed part of the Melbourne to Echuca rail line, initially known as the Melbourne, Mt Alexander and Murray River Railway. George Christian Derbyshire, the first Engineer-in-Chair of the Victorian Railways was responsible for the design and construction of the works. No new lines were built in Victoria using double-headed rail after 1870. The siding was disconnected from the main line in 1988. The Ravenswood Railway Siding demonstrates the original 1856 philosophy of the Victorian Railways to adopt British permanent way technology. The siding demonstrates significant aspects in the development of permanent way technology in England and Victoria over the period from the 1830's to the 1880's. The chairs in the Ravenswood siding are physical evidence of early railway technology rendered obsolete 120 years ago, namely joint chairs at rail joints and trenails to secure the chairs to the sleepers. The double-headed rail demonstrates an important stage in the evolution of British rail technology in the 1830s. The old fish plates, square headed bolts and square nuts demonstrate the success of fishing the rail joins. The Ravenswood siding demonstrates the earliest form of rail joint technology developed in England, and existing in Australia, the joint chair. In part of the siding the sequence of joint and intermediate chairs is consistent with the 1856 specifications, that sequence is rare with the joints secured in joint chairs. The survival of chairs in this sequence is rare and almost certainly demonstrates that they remained in continuous use at the same location from 1862 to 1988. This remnant of the Ravenswood siding has survived 126 years. The siding has proved to be the most significant of extant remnant double-headed sidings in Victoria, containing a rare combination of early permanent way technologies. Construction dates 1862, Info from Ravenswood Railway Siding Victorian Heritage Database Report http://vhd.heritagecouncil.vic.gov.au/places/4693/download-report The remaining section of this siding is significant at the State and National levels in that it demonstrates the use of chaired rail by the Victorian Railways Department for the Trunk Lines and, more particularly, the following stages in the evolution of this long obsolete method of permanent way construction: a) The use of joint chairs and intermediate chairs at regular intervals inferring that the original wrought iron rail lengths were 12 feet, as is known through documentary sources to have been the case. The survival of chairs in this sequence is unique and almost certainly demonstrates that they have remained in continuous use at the same location and in the same sequence from 1862 to 1988 . b) The use of joint chairs and intermediate chairs designed for use with trenails. c) The use of later intermediate chairs designed for use with steel pins and the use of fished joints with steel double head chaired rail, representing a second method of constructing the permanent way using chaired rail technology. info from Ravenswood Siding - Melbourne/Echuca Railway Line - Victorian Heritage Database Report http://vhd.heritagecouncil.vic.gov.au/places/70103/download-report Addition to Citation for Melbourne to EchucaRailway Line 1/10/1990 Double Head Rail The surviving lengths of double head rail with chairs on this railway compare with one surviving similar remnant on the Geelong to Ballarat railway and are representative of permanent way construction techniques applied exclusively to the two trunk railways of the 1860's. In this respect they are rare survivors and may be unique at the national level and of technical importance at the international level to the extent that they enhance contemporary understanding of early railway building technology. Surviving lengths of chaired double head rail survive at Kyneton, Ravenswood and Bendigo on this railway and include a number of different types of cast iron intermediate and joint chairs with hardwood keys and metal pins. The Ravenswood siding is of special significance for the diversity of chair types and for the sequence of chairs recalling rail lengths known to be associated with construction of the line in 1862. Construction of the Railway Tenders closed on 24 March 1858 with no less than 133 tenders being received. A contract was let to Cornish and Bruce for £3,356,937 to commence work on 1 June 1858 and complete the line by 31 July 1861. Cornish and Bruce made quick early progress with the Melbourne to Sunbury section being officially opened on 13 January 1859. The line was officially opened to Bendigo (Sandhurst) on 20 October 1862 by the Governor of Victoria, Sir Henry Barkly. A great banquet was held for 800 guests and this was followed by a grand ball. The extension of the line to Echuca was a relatively simple matter as that part of the line was across plain country without any significant engineering challenges. Tenders were called for the work in 1863 and the work was completed in 1864 by contractors Collier and Barry Apart from the line contractors, other firms directly involved were J Shire law and Co (sleepers), R Fulton, Langlands Brothers and Co, William Crossley (water supply), B Moreland, Langlands Brothers and Co (platelayers lorries), E Chambers (iron pins, traversers), Miller and McQuinstan (luggage vans and steam engines) and various contractors for building works. Info from Engineers Australia Engineering Heritage Victoria Nomination for Recognition under the Engineering Heritage Australia Heritage Recognition Program for the Goldfields Railways - Melbourne , Bendigo & Echuca Railway Page 25 - .2.9.2 Statement from National Trust of Australia (Victoria) Listing number B5323 for Mt Alexander/Murray Valley Rail Line: Page 69 - Theme 3 https://www.engineersaustralia.org.au/portal/system/files/engineering-heritage-australia/nomination-title/Melbourne_%20Bendigo_Echuca%20Railway%20Nomination.pdf The Melbourne, Mount Alexander and Murray River Railway Company was a railway company in Victoria, Australia. It was established on 8 February 1853 to build a railway from Melbourne to Echuca on the Victorian-NSW border and a branch railway to Williamstown. The company struggled to make any progress and on 23 May 1856, the colonial Government took over the Company and it became part of the newly established Department of Railways, part of the Board of Land and Works. The Department of Railways became Victorian Railways in 1859. Construction of the Bendigo line commenced in 1858, but this private consortium also met with financial difficulties when it was unable to raise sufficient funds, and was bought out by the Victorian colonial government. The design work was then taken over by Captain Andrew Clarke, R. E., Surveyor-General of Victoria, with bridge designs completed by Bryson and O'Hara The contract for the first stage of the line from Footscray to Sandhurst (now Bendigo), was let to Cornish and Bruce for £3,356,937.2s.2d ($6.714 million) with work commencing on 1 June 1858. Completion of the permanent way was to be by 31 July 1861 https://en.wikipedia.org/wiki/Melbourne,_Mount_Alexander_and_Murray_River_Railway_Company Victorian Railways - purchased and imported the Rail and Chairs from Raleigh, Dalgleish, White and Co. London Importation of railway plant : abstract of a return to an order of the Legislative Assembly dated 27th June 1860 for - Copies of the advertisements calling for tenders, the names of the tenderers and the accounts and correspondence with Mr Brunel relating thereto GP V 1859/60 no. C 15 http://www.parliament.vic.gov.au/papers/govpub/VPARL1859-60NoC15.pdf Report from the Select Committee upon the Importation of Railway Plant : together with proceedings of the Committee, minutes of evidence and appendix GP V 1859/60 no. D 38 (2.9 MB) http://www.parliament.vic.gov.au/papers/govpub/VPARL1859-60NoD38.pdf Victorian Railways : report of the Board of Land and Works November 1862 GP V 1862/63 no. 21 (2.8 MB) https://www.parliament.vic.gov.au/papers/govpub/VPARL1862-63No21.pdfHistoric - Victorian Railways - Double Headed rail Ravenswood Railway Station and Siding Victorian Heritage Database Reports Victorian Heritage Register VHR H1100 Victorian Heritage Register VHR H1786 National Trust VHR H1100 Mount Alexander and Murray River Rail way Line National Trust2 rail lengths of Double Headed Rail made of Iron makers marks : Wilson & Cammell - Dronfield - Steel and 20 joint chairs with metal rail pins Makers mark Wilson & Cammell - Dronfield - Steel (possible date 187? very hard to read ) puffing billy, double headed rail, wilson & cammell - dronfield - steel works, ravenswood station siding, melbourne to echuca rail line, initially known as the melbourne, mt alexander and murray river railway. -
Ringwood and District Historical Society
Photograph, Railway line construction - Ringwood area. Circa 1880's
... "Written on back of photograph" Rail line -Ringwood area..." Rail line -Ringwood area. 4th from left- Max Miller Black ...Black and white photograph"Written on back of photograph" Rail line -Ringwood area. 4th from left- Max Miller -
Glenelg Shire Council Cultural Collection
Photograph - Photograph - Railway Construction, Port of Portland, c. 1958
... rail line.... approach of the PHT rail line. Photograph Photograph - Railway ...Port of Portland Authority ArchivesFront: Back- 'Western approach railway'- Black biroport of portland archives -
Greensborough Historical Society
Flyer - Leaflet, Montmorency Train Station: Call to action [Oct. 2020], 2020_10
... hurstbridge rail line... during upgrade works. hurstbridge rail line montmorency station ...The Montmorency Train Station Group is a group of local people concerned about the relocation of Montmorency Station and the impact this will have on local residents, traffic, flora and fauna, as well as the impact on train services during upgrade works.2 page leaflet, colour images and text.hurstbridge rail line, montmorency station, montmorency train station group -
Greensborough Historical Society
Memorabilia - Bag, Hurstbridge Line Duplication : delivered by Level Crossing Removal Project, 2023
... hurstbridge rail line upgrade... montmorency station hurstbridge rail line upgrade 'H' Hurstbridge Line ...Given out at the opening of Montmorency Railway Station 2023.Draw string fabric bag.'H' Hurstbridge Line Duplication; Delivered by Level Crossing Removal Project.bags, montmorency railway station, montmorency station, hurstbridge rail line upgrade -
Greensborough Historical Society
Newsletter, Victorian Government, New Greensborough Station Precinct, January 2024
... Hurstbridge rail line... and Victoria's Big Build. greensborough railway station Hurstbridge rail ...Update on the new Greensborough Station Precinct; part of the Level crossing Removal Project and Victoria's Big Build.Four page newsletter colour illustrationsgreensborough railway station, hurstbridge rail line, railways -
Greensborough Historical Society
Document - Submission, Norm Colvin et al, Banyule Heritage Study 2020 Nominations - Plenty River railway bridge Greensborough, 2020
... hurstbridge rail line... hurstbridge rail line plenty river banyule heritage study 2020 1 p ...Part of the single track railway extension of 1902 from Heidelberg to Eltham, the Plenty River railway bridge Greensborough, was nominated for the Banyule Heritage Study 2020. This nomination was prepared by Norm Colvin & Anne Paul on behalf of the Greensborough Historical Society1 p. Text and photographshurstbridge rail line, plenty river, banyule heritage study 2020 -
Greensborough Historical Society
Slide - Photograph, John Ramsdale, Old railway line Whittlesea: Slide 47, 1990s
... whittlesea rail line... visual material. whittlesea whittlesea rail line No maker's marks ...Photograph shows what appears to be a rural farmhouse and paddock, this is part of the site of the old railway line to Whittlesea. In centre of photo is the old station platform.Part of the John Ramsdale collection of slides and audio visual material.Colour photograph scanned from slide.No maker's marks. No caption on slide.whittlesea, whittlesea rail line -
Greensborough Historical Society
Article - Newspaper Clipping, Diamond Valley Leader, Disturbing lastest on duplication, 18/03/2020
... hurstbridge rail line upgrade... the Hurstbridge line duplication. hurstbridge rail line upgrade ...The State Government is under fire for a disturbing decision to exclude Banyule Council from planning the Hurstbridge line duplication.News article 1 page, black text. and colour image.hurstbridge rail line upgrade, greensborough station, banyule city council -
Greensborough Historical Society
Photograph - Digital Image, Hurstbridge bound train at road level, Watsonia 1970, 1970_
... hurstbridge rail line... level, Watsonia 1970. watsonia station hurstbridge rail line ...Hurstbridge bound train at road level, Watsonia 1970. Digital copy of black and white photographwatsonia station, hurstbridge rail line, trains -
Greensborough Historical Society
Newspaper Clipping (copy), Greensborough's red letter days; railway opening, by D. Medhurst, 13/04/1933
... hurstbridge rail line... rail line 3 p. OCR transcript of original article (copied from ...Account of the background to the construction of the extension of the railway line between Heidelberg and Eltham, and the effects of the railway service on the Greesnborough, Briar Hil and Montmorency areas.3 p. OCR transcript of original article (copied from Trove)railways, hurstbridge rail line -
Greensborough Historical Society
Article, Journal, Hurstbridge train line, 19/06/2014
... hurstbridge rail line... of 2014. hurstbridge rail line eltham station Link to The Age ...Description of the existing manual signalling system at Eltham station, to be phased out by the end of 2014.1 p. reprint text and col. photographsLink to The Age photogallery database sourcehurstbridge rail line, eltham station -
Greensborough Historical Society
Newspaper Clipping, Diamond Valley Leader, Buses on line in February, 24/01/2018
... Hurstbridge rail line... victoria buses replace trains Hurstbridge rail line News article 1 ...Buses will continue to replace trains on the Hurstbridge line next month.News article 1 page, black text.public transport victoria, buses replace trains, hurstbridge rail line -
Greensborough Historical Society
Folder, Peter Simmenauer, Building the Heidelberg to Eltham railway, by Peter Simmenauer, 2018
... hurstbridge rail line... and collated by Peter Simmenauer railways hurstbridge rail line ...Background to the construction of the Heidelberg to Eltham railway extension, completed May 1902, written and collated by Peter SimmenauerFolder containing 4 p. article, copies of newspaper articles and contemporary documents and photographsrailways, hurstbridge rail line, heidelberg station, eltham station -
Greensborough Historical Society
CD-ROM, Australian Railways Historical Society, Heidelberg to Eltham Railway: ARHS Archive, 30/01/2018
... hurstbridge rail line... hurstbridge rail line ARHS Archive: Eltham Request CD-Rom in plastic ...Report by Australian Railways Historical Society in response to a request for information on the Heidelberg to Eltham railway extension by Peter SimmenauerCD-Rom in plastic caseARHS Archive: Eltham Requestrailways, hurstbridge rail line -
Greensborough Historical Society
Newspaper Clipping, Diamond Valley Leader, Prepare for rail disarray, 14/03/2018
... hurstbridge rail line... line closure rosanna station hurstbridge rail line News article ...Roads will be thrown into chaos when a chunk of the Hurstbridge train line is closed for six weeks for track upgrades and the level crossing removal at Rosanna station.News article 1 page, black text and colour image .level crossing removal project, hurstbridge train line closure, rosanna station, hurstbridge rail line -
Greensborough Historical Society
Newspaper Clipping, Eltham Railway: loan, deviation and compensation, 21/05/1900
... hurstbridge rail line... rail line 6 p. transcripts of newspaper reports from the Age 21 ...Relates to the disagreement between advocates of the original surveyed route and the proposed "deviation" for the Heidelberg to Eltham railway extension, 1900.6 p. transcripts of newspaper reports from the Age 21/05/1900 and Mercury and Weekly Courier 13/07/1900 regarding discussions on the route to be taken by the Heidelberg to Eltham railway extensionrailways, hurstbridge rail line