Physical description

Blackburn Road level Crossing was closed for 2 weeks for the rail line to be lowered under Blackburn Road. More than 1,000 piles will be drilled to reinforce the rail corridor which is due to be completed 2017.

Summary

Blackburn Road level Crossing was closed for 2 weeks.