Album - Hume Reservoir Australia Album - Plans and Progress Photos - River Murray Water Scheme, Department of Public Works, N.S.W, 1927
This set of photos is from a leather bound album bearing the inscription "HUME RESERVOIR AUSTRALIA" plus 'The Rt. Hon. L. C. M. S. Amery, P. C., M .P.' all inscribed in gold. It was presented to The Rt. Hon. L. C. M. S. Amery, P. C., M. P, Secretary of State for Dominion Affairs on the occasion of his visit to the Hume Reservoir on 2nd November 1927. This album is of local and national significance as it documents the planning and development of the Hume Reservoir up to 1927. It was the largest water reservoir in the British Empire. The album records the pioneering engineering work that went into its construction.1. Locality Plan and Plan of Dam. The dam is about ten miles by road upstream from Albury and about three-quarters of a mile below the confluence of the Mitta Mitta River and the Murray River. Its main features consist of a concrete portion across the bed of the river with earth embankment at both ends. The foundations throughout are on hard granite, found at an average depth of about 40 feet below the surface, the centre line being located to take advantage of the most favourable rock levels.Heading on page "WORKS UNDER RIVER MURRAY WATERS AGREEMENT/HUME RESERVOIR" Beneath top diagram "FIG. 1. ELEVATION" Beneath second diagram "FIG. 2. PLAN" On map "LOCALITY PLAN"hume reservoir australia, river murray waters scheme, hume weir diagrams, hume weir location -
Wodonga & District Historical Society Inc
Album - Hume Reservoir Australia Album - Detail plan and explanation, Department of Public Works, N.S.W, 1927
This set of photos is from a leather bound album bearing the inscription "HUME RESERVOIR AUSTRALIA" plus 'The Rt. Hon. L. C. M. S. Amery, P. C., M .P.' all inscribed in gold. It was presented to The Rt. Hon. L. C. M. S. Amery, P. C., M. P, Secretary of State for Dominion Affairs on the occasion of his visit to the Hume Reservoir on 2nd November 1927. This album is of local and national significance as it documents the planning and development of the Hume Reservoir up to 1927. It was the largest water reservoir in the British Empire. The album records the pioneering engineering work that went into its construction.2. Detail Plan and Section. Starting from the New South Wales and there will be an earthen embankment 430 feet 6 inches long which is retained by the North Wing Wall. Then come the sluice section 284 feet 3 inches long, the spillway 720 feet long and the South Wing Wall, making a total length of 1,042 feet 6 inches of concrete wall. Beyond the South Wing Wall is earth embankment again to a length of 3,827 feet. The Full Supply Level is R.L.626.00 and allowance has been made for a surcharge of 9 feet. A road will run along the top of the dam at R.L.642.00. The sluice section contains seven offlets, the three nearest the north wing wall being 13 feet in diameter for hydro-electric purposes and the other four 9 feet in diameter for regulation purposes only. There are to be stony sluice gates on the upstream ends of the outlets and needle valves on the downstream ends. The shock of the discharged water will be taken by a stilling pool. Trash racks will protect the intake ends of the outlets. Next comes the spillway section, which is curved on the downstream face, and carried up to within 15 feet of the full supply level. Above that will be a series of piers between which will be the flood gates and on top of which the roadway will be carried. The gates will be 20 feet wide and 15 feet high and will be 29 in number. They will slide down the face of the wall when opened for the escape of the water. The investigation of the control of this cascade of water was made by means of a model and as a result the form of “bucket” or energy dissipater shown on the section of the spillway was decided upon. The earth embankment in Victoria is being constructed by the State Rivers and Water Supply Commission of Victoria who are the Constructing Authority for that State under the River Murray Waters Agreement. The core of the embankment is of concrete 6 feet wide at the base tapering to 2 feet at the top end and is reinforced with steel rods from the level of the decomposed rock upwards. On the downstream side, at about natural surface level, is a tunnel for drainage and inspection purposes. Above the tunnel is a vertical layer of large stones to drain any seepage to the tunnel. Against the core wall is packed selected material of as impervious a character as can be got locally and beyond that the bank is carefully built up in horizontal layers by means of horses and wheel scoops. The upstream slope is 3-to-1 hardening to 2½-to-1 at the top and the downstream slope is 2½-to-1 hardening to 2.07-to-1 at the top. The thrust of the upstream toe is taken by a mass of granite blocks, and this face is protected by concrete laid in situ. The width of the bank at base is 650 feet and at top 32 feet.hume reservoir australia, river murray waters scheme, hume weir diagrams, hume plan details -
Wodonga & District Historical Society Inc
Book - Hume and Dartmouth Dams : Operations Review Options Paper, Hume and Dartmouth Dams Operations Review Reference Panel, 1998
... Hume and Dartmouth Dams : Operations Review Options Paper...Hume and Dartmouth Dams Operations Review Reference Panel ...In December 1996 the Murray-Darling Basin Ministerial Council agreed that the way in which Hume and Dartmouth Dams are operated should be reviewed. This options paper is the result of the review to November 1998. It describes the issues that have been identified as needing attention, the way in which the panel has gone about its task, the tensions that arise because of competing objectives for managing the regulated Murray, and possible improvements and changes to the balance between competing objectives. This paper was submitted to the interested stakeholders and the public for feedback.non-fictionIn December 1996 the Murray-Darling Basin Ministerial Council agreed that the way in which Hume and Dartmouth Dams are operated should be reviewed. This options paper is the result of the review to November 1998. It describes the issues that have been identified as needing attention, the way in which the panel has gone about its task, the tensions that arise because of competing objectives for managing the regulated Murray, and possible improvements and changes to the balance between competing objectives. This paper was submitted to the interested stakeholders and the public for feedback.hume reservoir, dartmouth dam, murray-darling basin, water management -
Wodonga & District Historical Society Inc
Book - Hume and Dartmouth Dams : Operations Review Final Report and Recommendations, Hume and Dartmouth Dams Operations Review Reference Panel, May 1999
... Hume and Dartmouth Dams : Operations Review Final Report...Hume and Dartmouth Dams Operations Review Reference Panel ...During 1997 and 1998, the Hume and Dartmouth Dams Operations Review Reference Panel has undertaken a broadly based review of the way in which these two major water storages were operated. The Panel’s terms of reference were essentially to consider how the operating rules might be amended to better address the competing objectives of water supply, environmental enhancement and flood mitigation. This report includes summaries of feedback considered by the reference panel as well as its final recommendations.non-fictionDuring 1997 and 1998, the Hume and Dartmouth Dams Operations Review Reference Panel has undertaken a broadly based review of the way in which these two major water storages were operated. The Panel’s terms of reference were essentially to consider how the operating rules might be amended to better address the competing objectives of water supply, environmental enhancement and flood mitigation. This report includes summaries of feedback considered by the reference panel as well as its final recommendations.hume reservoir nsw, dartmouth dam victoria, water management -
Linton and District Historical Society Inc
Photograph, Linton Reservoir, circa 1900, c1900
Sepia photograph of a large dam surrounded by trees, with wooden walkway on left hand side."Linton reservoir early 1900s a view of the Linton Reservoir. It is situated on the Morchup Road".linton reservoir -
Whitehorse Historical Society Inc.
Photograph - Aerial Photograph, Aerial View of Australian Tesselated Tile Co. Pty. Ltd. & others, 1935
An aerial view of Australian Tessellated Tile Works. |In the background M & MBW reservoir. In the foreground is the Builders Trading and Roofing Company Tile works (formerly the Monarch Pottery - note the M on the chimney)australian tesselated tile co.pty ltd, aerial photographs, dams and reservoirs, mitcham reservoir, builders trading and roofing co. ltd, monarch pottery -
Whitehorse Historical Society Inc.
Photograph - Black and white photograph, Mitcham Reservoir
Black and white photo of Mitcham Reservoirmitcham reservoir, dams and reservoirs