Showing 270 items
matching ringwood railway station
-
Ringwood RSL Sub-Branch
Medals, Boer War rosette, 1905 and 1919
Robert Summerton Games served in the Boer War with the 5th Victorian Mounted Rifles No 1614. He enlisted again in WW1 and served with the 5th Australian Light Horse and also the 4th Camel Regiment. Ribbon bar for Queen South Africa and King South Africa Medals, Rosette made of cloth in the colours of the QSA. Also cardboard Qld railway pass dated 6th May 1919. Also part of the box that was sent to Pte. Games containing his Boer War QSA. Trooper R S Games -
Ringwood RSL Sub-Branch
Souvenir Plaque, C WW2
Railway Spike from Thai Burma Railway mounted on wood.Ex Prisoner of War Association. Found by Bill Toon in 1994. -
Ringwood RSL Sub-Branch
Souvenir Framed item, Piece of bridge from the Burma Railway, C 1987
Wooden frame with text and a piece of teak from the Bridge over the River Kwai.Collected from the bridge on 10th March 1987. -
Whitehorse Historical Society Inc.
Photograph, Mitcham Railway Station
Mitcham Railway Station to be built underground during 2013.Coloured photograph of the Mitcham Railway Station. This platform is used by passengers heading south towards Ringwood, Lilydale, Belgrave etc. In 2013, the station was rebuilt underground.mitcham railway station, trains, railways -
Whitehorse Historical Society Inc.
Photograph, Mitcham Railway Crossing
Coloured photograph of a Metro train crossing Mitcham Road and heading east towards Ringwood - 2012. In 2013, due to the amount of traffic using Mitcham Road, the railway line and station were reconstructed underground.mitcham railway crossing, trains, railways, transport -
Whitehorse Historical Society Inc.
Photograph - Coloured Photograph, Blackburn Railway Road, 2012
Blackburn Railway station opened on 25/12/1882 but was not staffed and the crossing was not manned. The station opened as ac staff and ticket station on 12/8/1889 with hand operated gates.Automatic signalling was introduced on 13/7/1958.Coloured photograph of the Blackburn Road railway crossing at Blackburn, looking east towards Ringwood - 2012blackburn road, blackburn, blackburn railway crossing -
Whitehorse Historical Society Inc.
Photograph, Blackburn Railway Station, 2012
See NP3406Coloured photograph of the railway line leading away from the Blackburn station towards Ringwood in the east - 2012blackburn railway station -
Whitehorse Historical Society Inc.
Photograph, Blackburn Railway Station, 2012
In 1882 the railway from Melbourne to Camberwell was extended to Lilydale, Blackburn Station was then known as Blackburn Greek Station and was opened on 2 December 1882. At this time the Lilydale line had only a single track. On 12 August 1889 Blackburn was designated as a 'crossing station' as it had 2 platforms. In 1891 a second line was added between Box Hill and Ringwood stations. Service termination at Blackburn began in the late 1890's due to the large number of passengers visiting the Blackburn Lake Sanctuary. The Lilydale line was electrified to Ringwood in January 1923. Automatic signalling reached Blackburn in 19568. Boom gates replaced hand gates in 1970. in 1980, the goods siding was removed and the old station was demolished.Coloured photograph of the south side of the Blackburn Station. People using this platform are headed towards the city - 2012blackburn railway station -
Whitehorse Historical Society Inc.
Photograph, Mitcham Railway line, 2012
Coloured photograph of the railway line crossing Mitcham Road. Blue car on road.Railway line heading east towards Ringwood.mitcham railway station, mitcham railway line, railways -
Whitehorse Historical Society Inc.
Print - Photograph, Windsor Family, c1940
By1880 most railway crossings were identified by a sign, although at very busy crossings a watchman was posted. Eventually most stations were manned and gates were installed. The watchman was generally housed in a small wooden or brick building with a clear view of the single line. The next stage was mechanical closing of the gates, using a lever situated in a shed behind the gatehouse. By 1956 automatic barriers had been installed. A working model of the gate style crossing can be seen at New Street Brighton.A collection of 12 black and white photographs of the Windsor family who lived in the gatehouse next to the Tunstall station. The stationmaster Ernest Windsor was also responsible for track maintenance between Ringwood and Middleborough Road Box Hill. His wife Betty Jean Windsor was gatekeeper for 2 years. On the back of each photograph are the names of the family members in the photo.Catherine Ann Windsor (born 1897), John Ernest (Ern) WIndsor, Catherine (Kitty) Windsor (born 1919), Patricia Janette WIndsor (born 1935) Tunstall Railway Gatesstationmasters, tunstall station, windsor ernest, windsor catherine, windsor patricia, windsor betty, windsor catherine (kitty) -
Ringwood RSL Sub-Branch
Document railway, LSWR Continental Services, 1919
Brought home by a returned Australian service person.London and South Western Railway timetable and prices London to Paris -
Ringwood RSL Sub-Branch
Book - POW, The true story of The Death Railway & The Bridge on the River Kwai
THe story of the Burma - Thailand Railway. Soft cover, no dust cover. 60 pages containing black and white prints. -
Ballarat Tramway Museum
Ephemera - Timetable/s, Melbourne and Metropolitan Tramways Board (MMTB), Set of 14 MMTB Melbourne bus timetables, 1969
Set of 14 MMTB timetables for various bus routes, dated July 1969. Generally includes Sat and Suns, Good Friday and Christmas day as well as weekdays, unless noted otherwise. Also includes a map of the route, detailed time points, sections, connecting services, fares, and organisation address - 616 Little Collins St. Melbourne. Have been folded into eight or ten portions. All on white paper unless noted otherwise. Items shown with an # - have a sticker modifying timetable information details on the front page. Items shown with a % are larger size sheets of paper, folded into 10. 1155.1 - Clifton Hill - Elsternwick # .2 - Garden City - City # .3 - Fishermen's Bend - City .4 - Box Hill - East Doncaster via Blackburn, Mitcham via Donvale PO and Mitcham - Ringwood via Eastland .5 - Warrandyte via Templestowe, via East Doncaster, Donvale PO - City % .6 - Warrandyte, Park Orchards Ringwood .7 - Williamstown Rd., Footscray Railway Station, Ballarat Rd # .8 - Latrobe University, Northland, West Heidelberg - City # % .9 - Deer Park, Sunshine Park, Sunshine, Footscray - City # .10 - as above, but for Saturdays and Sundays on pink paper # .11 - Box Hill, Heidelberg, Templestowe .12 - Box Hill, North Blackburn .13 - East Kew, Box Hill, Doncaster .14 - Bullen, North Kew - City # % Images of a sample of documents added 16-11-2013. mmtb, timetables, melbourne -
Ringwood RSL Sub-Branch
Book - Burma Railway Artist, The War Drawings of Jack Chalker
-
Ringwood and District Historical Society
Photograph, Maroondah Highway Central, Ringwood. Looking west from entrance to railway station, 1960
Black and white photograph (2 copies)Image shows shops looking west from Midway Arcade and Town Hall. -
Ringwood and District Historical Society
Photograph, Maroondah Highway Central, Ringwood. Whitehorse Road, showing old railway crossing. 1918
Black and white photograph (2 copies)Written on back of photograph: "View showing old rail crossing, Station Master's house and Coffee Palace." Stamp of photographer on back of photograph reads, "T.R.G. Williams, Photographer, Ringwood" -
Melbourne Tram Museum
Ephemera - Timetable, Melbourne & Metropolitan Tramways Board (MMTB), East Doncaster Junction, Nunawading North, Jul, 1961
... North, Blackburn Railway Station, Box Hill Railway Station... North, Blackburn Railway Station, Box Hill Railway Station ...Timetables for specific routes, day of week giving information on tram times at specific time points, route map, sections and fares and organisation address - 616 Little Collins St. Melbourne. 2nd July 1961 1 - East Doncaster Junction, Nunawading North, Blackburn Railway Station, Box Hill Railway Station- Mitcham - Ringwood. 2 - Doncaster Junctioin - Melbourne - route 81 with many supplementary routes - July 1961 3 - Bulleen - City - Garden City routes 15 and 16 - July 1961Demonstrates and early MMTB timetable for bus routes which included extensive details of services.Set of 3 MMTB Bus timetable, folded sheets with maps.Bus routes underlined in blue inktrams, tramways, timetables, tickets, bus services, fares, mmtb, doncaster, ringwood, mitcham, bulleen, garden city, route 15, route 16, route 81 -
Ringwood and District Historical Society
Photograph, Maroondah Highway Central, Ringwood. Town Hall rooftop view of Railway station entrance, c.1962
Black and white photograph (2 images)Image shows corner of Railway Station entrance looking east. -
Ringwood and District Historical Society
Photograph, Main Street Ringwood, looking east c1940
Black and white photograph (2 copies- 1 large, 1 small)Written on rear of backing sheet: "Main St. Ringwood. Looking East down to Warrandyte Road. Railway Station entrance on right past Carter's - 1940". Clocktower in background in original position. -
Ringwood and District Historical Society
Photograph, Railway Station entrance, Ringwood - c1940
... Railway Station entrance, Ringwood - c1940....Typed below photograph: "Ward Series No.3. Railway Station...Typed below photograph: "Ward Series No.3. Railway Station ...Black and white photograph (2 copies)Typed below photograph: "Ward Series No.3. Railway Station, Ringwood". Frank Parker's Estate Agent on left, Methodist church beyond footbridge. -
Ringwood and District Historical Society
Flyer, Auction Sale Advertisement - Ringwood Railway Estate and Ringwood Heights Estate, Ringwood, Victoria - August, 1924
... Station, Ringwood, Phone Ringwood 7. Footnote - "Will sell..., Opposite Railway Station, Ringwood, Phone Ringwood 7. Footnote ...Refer also to Reg. No. 5183 for Ringwood Railway Estate (September 1923) and Reg. No. 5184 for Ringwood Heights Estate previous release (March 1924)Folded double-sided brochure advertising public auction of Final Sections of Ringwood Railway Estate and Ringwood Heights Estate on Saturday, 30 August, 1924, with town photographs, location map, terms of sale, and summary of local features and services.Subdivision includes Whitehorse Road, Sherbrooke Avenue, Burwood Avenue, Bon View Avenue, Grant Crescent, Hillcrest Avenue, Heatherbrae Avenue, Margaret Street, and Mary Street. (Agents) Knight & Harwood, 315 Collins Street, Melbourne, Phones Central 10615, 10616, in conjunction with J.B. McAlpin, Opposite Railway Station, Ringwood, Phone Ringwood 7. Footnote - "Will sell as above under instructions from the Owner, Mr. Thomas Grant, J.P.". -
Ringwood and District Historical Society
Flyer, Subdivision Advertisement - Ringwood Heights Estate Public Auction - March, 1924
... with J.B. McAlpin, Opposite Railway Station, Ringwood, Phone... Station, Ringwood, Phone Ringwood 7. Folded double-sided brochure ...Refer also to Reg. No. 5185 for Ringwood Heights Estate final section release (August 1924)Folded double-sided brochure advertising Ringwood Heights Estate Public Auction on Saturday March 1, 1924, with town photographs, location map, terms of sale, and summary of local features and services.Subdivision includes Whitehorse Road, Bon View Avenue, Grant Crescent, Hillcrest Avenue, Heatherbrae Avenue, Margaret Street, and Mary Street. (Agents) Knight & Harwood, 315 Collins Street, Melbourne, Phones Central 10615, 10616, in conjunction with J.B. McAlpin, Opposite Railway Station, Ringwood, Phone Ringwood 7. -
Ringwood and District Historical Society
Photograph, Old railway crossing near Ringwood station, c1925
... Old railway crossing near Ringwood station, c1925....- 1 large, 1 smaller) Old railway crossing near Ringwood ...Black and white photograph (2 copies- 1 large, 1 smaller)Typed below one photograph: "Bullock team at old railway crossing near station, taken from Maroondah Highway. Circa 1925." Written on back of other photograph: "Rail crossing 1924. Team owned by Hussey. Opposite Adelaide Street and Ringwood House. Corner of Station Street and Greenwood Avenue on right." Blood Brother's store in background. -
Ringwood and District Historical Society
Photograph, Railway Station precinct shops, south side of Maroondah Highway, Ringwood - 1969
Black and white photograph Image shows shops on south side of Maroondah Highway between railway station entrance and clocktower site at Wantirna Road. -
Ringwood and District Historical Society
Photograph, South-West corner of entrance to Railway Station, Maroondah Highway, Ringwood - 4 March 1973
... South-West corner of entrance to Railway Station, Maroondah... to railway station - 4 March 1973". CBC bank on corner. Black ...Black and white photograph Written on back of photograph: "West corner of entrance to railway station - 4 March 1973". CBC bank on corner. -
Ringwood and District Historical Society
Photograph, Maroondah Highway Central, Ringwood. Shops opposite old Town Hall site and Midway Arcade, 1969
Black and white photographShops include CBC Bank on corner of Railway Station entrance, and A.N.Z Bank at 116 Maroondah Highway. -
Ringwood and District Historical Society
Photograph, Maroondah Highway Central, Ringwood. Town Hall rooftop view of Railway Station entrance, - c.1962
Black and white photograph (2 images)Image shows ANZ Bank to left, Chemist and Jimmy's Handy Bar towards entrance. Methodist Church in background at top right. -
Ringwood and District Historical Society
Photograph, Maroondah Highway Central, Ringwood. Town Hall rooftop view of Railway station entrance. c.1962
Black and white photograph (2 images)Written on back of one photograph: "Town Hall roof Dec, 1962. Series taken by Paddy Miles." Image shows Methodist Church in background. -
Ringwood and District Historical Society
Photograph, Train derailment at Wantirna Road subway in Ringwood, looking towards station. Station St. on right. 1/2/1902
Black and white photographs - 2 copiesVarious accompanying inscription beneath and on back of photographs. They read as follows: "Train derailment at Wantirna Road subway looking towards station. Station St. on right. 1/2/1902. This date has been written as 1908 on other locations in other places. Area behind engine was later railway car park." "Ringwood derailment 1902 (copied from magazine Latrobe library [ARHS Vic. Div. photo collection #748-1]. Cross at lower right marks spot from where fireman McKeone was rescued. Wantirna Rd. underpass. Station to left". -
Ringwood and District Historical Society
Photograph, Boiler explosion at Ringwood station 20th June 1894 for engine 297R. "Heard in Box Hill"
Black and white photographs - 2 copiesTyped below photograph, "Boiler explosion at Ringwood station 20/6/1894. Heard in Box Hill". Article from newspapers:- Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 27 January 1894, page 21 Official enquiry. The Board of Enquiry appointed by the Railway Commissioners to enquire into the causes of the boiler explosion which shattered the locomotive at Ringwood on Saturday night, assembled at the Railway department on Wednesday to commence its deliberations, The board consisted of Mr R. Fulton, engineer, C. W. McLean; engineer to the Marine Board, and Mr Mephan Ferguson, iron-founder. There is some difficulty at the outset about the constitution of the board; It was suggested that the Apt of Parliament contemplated that boards of experts, after the manner of the present one, needed, to have their appointments confirmed by the Governor-in-Council. The point, however, was not considered sufficiently important to prevent the board from proceeding with evidence. Robert Greyford, stationmaster at Ringwood, was the first witness. He said he saw the explosion on Saturday night at about twenty minutes to 8. There was a rush to the engine to see what had happened, and the driver and fireman were both found on the platform of the engine. The driver seemed badly hurt, but the fireman, to all appearances, was not so badly injured. They were both attended to and sent up to Melbourne by the last suburban train. Witness had a look at the engine and found the dome and all the plates round the boiler blown clean, away. The springs were also blown clean away. The Chairman (Mr Fulton) : Did you measure the distance ? Witness: Yes; one of the plates was 209 yards away. A piece from the top of the boiler 15 pounds in weight he found driven into the hard beaten track 410 yards away. Several pieces of boiler plate were found scattered at various distances. The buildings roundabout were injured. The Chairman; Did you notice anything peculiar about either of the driver or the fireman ? — No ; nothing wrong, with either of them. If the engine was blowing off at all, it must have been very light. In your opinion, were they perfectly sober ? — Perfectly. In approaching the station, is there a down or an up grade? — A very slight down grade. How is the road from Healesville ? — Up and down all the way. It is down, grade for about 200 yards coming into Ringwood station. They shut off ; steam about a quarter of a mile away, and come in at a good pace. They generally put on 15 pounds of steam while they are in the station. Mr Ferguson : Had the driver the usual load on ? — Yes ; about the usual load. Witness added that he had known the driver personally for about 10 years, and he had always been a careful, steady, sober man. He did not know the fireman so well. John Palmer, porter at Ringwood station, also saw the explosion. He was attending to the train on its arrival. He was knocked down by the force of the explosion. When he got up he saw the engine driver being carried into the office covered in blood. He noticed nothing peculiar about the driver and fireman, nor about the engine. Mr McLean : How far were you from the engine when you were knocked down ? — From ten to fifteen yards. William Paul, the guard of the train to which the injured locomotive Was attached, said he was looking at the engine at the very moment the explosion occurred. It seemed to come from exactly under the dome. The force of it took him off his feet. He was about 15 yards from the tender. When he rose he tried to reach the engine, but could not do so on account of the steam and coal dust. He called out to know whether any of the passengers were injured, and got no response, so that he concluded they were all right. All the lamps but about half dozen were extinguished by the force of the explosion, although the glass was not broken. He could testify most distinctly that the driver and fireman were both sober. The driver was a man who never drank. The steam started to blow off about a minute and a half before the explosion took place. The last place at which the engine took water was Healesville. The Chairman : Do yon know anything of the quality of the water there ? Is it creek water ? — Yes ; it comes from the Graceburn River. You never heard of its quality ?— No. How long have you known this engine on the road— About 13 months. Hew long have you known the driver on this line ? — About six weeks. I have known the fireman several years. The driver was a strict teetotaller, and I never saw the fireman take anything to drink in his life. Mr T. H, Woodroffe, chief mechanical engineer of the Victorian Railways, produced a report he had written to the secretary, about this explosion. The document gave facts concerning the engine and the explosion. It stated that the rapture seemed to have occurred at the rim of the plates adjoining the fire box. The engine was built at the Phoenix Foundry, Ballarat, in 1883. It was repaired at various times, the last time being in July of last year when it was sent to the Port Melbourne shops, and was then tested to a cold water pressure of 195 and found all right. It was the custom to overhaul all locomotives about every five years. The Chairman : There were no very heavy repairs in July, 1893; were there? — Not to the boilers. The shop manager's report says that the plug and safety tap holes were repaired, five new copper studs put in firebox, ash-pan door repaired, tender cleaned and overhauled, and studs re-rivetted, and boiler tested to pressure of 195, cold water. Mr Woodroffe read the report of the repairs effected to the boiler in December, 1888. That would be the time the plate was put in the boiler. On that occasion three new plates were put in the bottom and the boiler tested up to 195. The Chairman: Do you keep a record of the water used ?— Yes, the water in this case, I think, came from the Maroondah scheme. Mr Woodroffe said boilers were examined front time to time in the running sheds. In his opinion every possible care had been taken to keep the engine in proper care. There might, however, be lessons learnt from this. The Chairman: No doubt. From his examination of the plates [the] witness did not think the state of them could have been detected from the outside. There were no signs of leakage or sweating or anything of that sort. The next witness- was Walter Stinton, workshop manager at Newport and he said that the injured engine had been repeatedly repaired under his charge. He gave a technical account of the repairs effected on various occasions. The testing of locomotives was under his special notice. They had a high pressure pipe running; round the works, and a pump set at 2001b. When the boiler was pumped full of water the pressure when applied up to 1951b. The board appointed by the department to inquire into the Ringwood locomotive boiler explosion sat again at Spencer street on 25th inst. Mr R. Fulton presided and the other members of the board were. Mr Mephan Ferguson and Mr C. W. McLean. Charles Grubb, foreman of the boiler-makers at the Newport workshops, said he had inspected the pieces of plate that had been blown out of the engine, and after examining them, pointed out to the Chief Mechanical Engineer the portion where the plate had started to burst. It was under the lap, on the right hand side of the boiler. The grooving might be accounted for by bad water. During the past twenty years he had examined all the boilers that came into the Williamstown workshops, and while some were hardly marked at all, others were very badly eaten away. The practice was to cut out the defective portions. In this case the boiler was repaired in a similar manner. The Chairman : Can you suggest any other way of repairing so as to prevent accident ? — No, unless by taking out a plate on one side from the joint, and carrying it further up so as to avoid the joints meeting, or by taking out the plate altogether. What would.be the cost .of putting in a new " plate I—Perhaps about double the price; but I wouldn't recommend that course. It would be putting a new plate against plates that have been in use ten years or so and that would not be advisable. I think the present system better. I consider the present system of repairing the best. This is the first we have had so bad like that, to my knowledge. You attributed this to bad water. Is there no other probable cause ? — Well; unless the iron be bad. This was Lowmoor iron. I think this accident was caused by the eating away of plates. This one was the worst I have seen, for the short time it had been running. We use three classes of iron — Lowmoor, Monkbridge and Bowling. By Mr Woodroffe (Chief Mechanical Engineer) ; There are engines still running that were repaired at the same time as this one, in 1888, and. in the same way. These are engines 339 and 333. They have been recently examined and are in splendid order. What in your experience, is the age of a boiler on the Victorian railways? — From 17 to 20 years our earlier boilers stood. The later boilers don't stand so well. How is that? — There is difference in construction, and the material is lighter. The old boilers had thicker plates. Have you been asked in any way to curtail boiler affairs? — No, sir; nor in any way. You have never hesitated to carry out any necessary repairs? — Never. Our orders have been to exercise every care in examining, repairing and renewing boilers. Witness said that his practice was when an engine came into the workshop to find out how long she had been running. If over five years, he informed the workshop manager, and they thought it necessary the tubes were taken nut. If everything was in good order witness reported to the manager. The cost of taking out the tubes and putting them in again was about L20. Mr Woodroffe : Have you ever hesitated to repair a boiler on the score of expense ? — No, never. Mr McLean : Hew do yon ascertain whether a boiler requires repairs?— I keep a record of every boiler examined. From every boiler that comes in I have the dome covers taken off, and when it is practical I get inside. l can almost tell from the top of a boiler what the bottom is like. If there is any doubt about it I have the tubes taken out. If I have suspicion of defective plate I cause to have bored a triangle in the plate at the point where there is the most wear. There is a travelling inspector who visits all the running sheds of the colony except Port Melbourne and tests the boilers. He reports to us and we note what he points out. Alfred Thompson, locomotive inspector of the eastern section, said he knew this engine, 297R. He read a list of her repairs. He heard of the accident on Saturday night and went up to Ringwood. The Chairman : Did you ever notice anything peculiar about the engine? — No, I considered her A1 and would not have hesitated to have put on 140lb pressure owing to the repairs she had undergone. Witness considered that the explosion was caused by the expansion and contraction of the plates ; and, no doubt, the plate had been eaten away through bad water. The other side of the boiler showed: signs of corrosion: By Mr Woodroffe ; Is every care taken with the boilers ? — Yes, every possible care is taken for the safety of boilers, Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 27 January 1894, page 7 EXPLOSION OF A LOCOMOTIVE BOILER, NARROW ESACPE FROM FATALITIES. THE DAMAGED ENGINE. [See drawing of loco – saved in “Railways” folder] The explosion of a locomotive boiler at Ringwood on Saturday evening, formed the subject of much discussion in railway circles on Monday. The Minister arrived at the office at an unusually early hour and immediately entered into a consultation with the acting chairman, Mr Kibble, and Mr Commissioner Murray. As the result of the interview it was resolved to ask three gentlemen of acknowledged engineering experience to sib as a board with the . object of inquiring into the cause of the accident and furnishing a report. Mr Richardson and the Commissioners are tally seized of the importance of having a searching investigation into the accident, and, with Mr Murray, the former went to Ringwood to inspect the scene of the disaster. They will he accompanied by Mr Woodroffe. During the morning no official report had come to hand from the driver or fireman of the engine in reference to the accident, but that is thought to be due to the circumstance that they have not sufficiently recovered to be able to give a circumstantial account of what occurred. The engine was one of the old R's, and, Mr Kibble pronounced them to be about the best class of engines used. So far nothing can be said as to the probable cause of the accident, as the broken plating of the engine has not been submitted to the inspection of experts. Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 27 January 1894, page 7 STATEMENT BY THE FIREMAN. This morning Thomas Miles, fireman on the engine the boiler of which exploded on Saturday night, is suffering from an injury to the spine, as well as a very severe shaking to the system. He states that he was fireman on the engine attached to the train which left Healesville on Saturday evening, at ten minutes to 8. Everything went all right until Ringwood was reached, when, .just as the train was about to continue its journey, a load explosion took place and Miles remembers nothing more until he was picked np on the platform ; and found himself suffering from a pain in the back, and an injury to his arm. He cannot think of any reason which could have caused the explosion, as there was plenty of water in the boiler, and everything seemed working all right. Mr R. Fulton, consulting engineer, of Queen street; Mr McLean, a member of the Marine Board ; and Mr Mephan Ferguson, engineer, have consented to act as a board to inquire into the cause of the engine boiler explosion at Ringwood on Saturday evening. The board has been appointed under section 117 of Act 1135, which provides that the Governor-in-Council may direct the taking of a such a step. Mr1 Fulton will act as chairman of the board, which met for the first time at the railway offices, Spencer street, this forenoon. Before separating the members of the Board paid a visit to the Prince's Bridge locomotive sheds in company with Mr Woodroffe, the chief mechanical engineer, for the purpose of inspecting the shattered boiler. It has been stated that the explosion is known to have been caused by a flaw in a plate which was put on the boiler about four years ago, but enquiries have tailed to elicit anything in support of that view. The engineers connected with the department are not inclined to say anything on the subject. Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 14 April 1894, page 20 The Ringwood Boiler Explosion, The Minister of Railways has received the supplementary report of the board appointed by him to investigate the circumstances connected with the explosion of a locomotive boiler at Ringwood. In their first report the board did not attach blame to anyone. Mr Richardson felt satisfied that the responsibility of having the engines properly inspected and overhauled periodically could be fixed if the inquiry were extended. He therefore referred the matter again to the Board, who took further evidence. In the report now furnished, the Board hold Loco. Inspector Thompson blameable, but point out as a mitigating circumstance that he had not received "written instructions" respecting inspections and overhauls. Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 7 July 1894, page 32 The Ringwood Boiler Explosion. The Minister of Railways takes exception to the tone of a paragraph appearing in a morning contemporary respecting the Ringwood boiler explosion. It makes it appear that Mr Richardson has referred the report of the board which considered the facts connected with the explosion to the Crown solicitor simply because he differed from the finding of the board. The Minister explains that when he received the report he found that the responsibility for having boilers properly inspected and overhauled had not been clearly fixed. He personally obtained farther evidence on that point, and arrived at a conclusion, from which the commissioners differed. As he did not like to take upon himself the responsibility of deciding upon the effect of the evidence, he submitted the matter to the Crown Solicitor, but that officer did not furnish him with the information sought. He has, therefore, referred the question to the Attorney-General, together with the draft of a regulation respecting boiler inspections and overhauls in the future. Mr Richardson says that his whole aim is to have the responsibility positively fixed. Weekly Times (Melbourne, Vic. : 1869 - 1954), Saturday 28 April 1894, page 23 The Minister of Railways has completed his consideration of the supplementary report received by him from the Ringwood Boiler Explosion Board. The report, it will be remembered, held Loco-Inspector Thompson blameable for the non-inspection of the boiler, but considered there was extenuating circumstances. There was a certain amount of doubt as to the absolute instructions given for overhauling engines periodically. Mr. Richardson is sending the report on to the Commissioners with instructions that the responsibility respecting inspection of boilers shall be made clear for the future.