Bendigo Historical Society Inc.
Plan - New Nil Desperandum Co. Gold Mine, W.H. Cundy, Mining Engineer, 1908
... ...Commonweatlth Bank Chambers...History Period of activity: 1865-1916 consisting of three companies Nil Desperandum (1865-1873), Nil (1882-1890+) and New Nil Desperandum (1906-1916)
Line of reef: Welbourne
Maximum recorded annual production: 3746zs obtained from 6158 tons in 1868
(Nil Desperandum) 2599ozs obtained from 7356 tons in 1908 (New Nil Desperandum)
Total production: 16,367ozs obtained from 58,992 tons
Dividends: £16,000 (Nil Desperandum), £3000 (New Nil Desperandum)
Deepest working level: 780 feet
Deepest shaft: unknown, but below water level
http://images.heritage.vic.gov.au › attachment
(City of Greater Bendigo: Marong Heritage Study Mining Sites) gold mining gold Margaret Roberts Collection McColl Rankin and Stanistreet Commonweatlth Bank Chambers Nil Desperandum Co. Marong Plan of New Nil Desperandum Co. gold mine, Bendigo. ...
NIL DESPERANDUM MINE and NEW NIL DESPERANDUM CO.
Other Names
Location Parcel No. P130635, mine site on
both Crown - Gravel Reserve
(mullock heap and filled shaft) and
Freehold Land (machinery site), north side of Raywood-Elmore main road, east of road to Neilborough, Raywood
Map Reference Raywood, 1:25,000 - BV501.527
Victorian Heritage Register
National Estate Register
Planning Scheme No
Description Just inside the boundary fence of a private property is a large brick winding engine foundation, 25 feet by 10 feet and 4 feet high. Constructed of hand-made
bricks set in a concrete mortar, this foundation has been modified or repaired with concrete at its northern end. The upper course of bricks has been removed,
exposing long sections of 2-inch diameter mounting bolts. Small brick foundations lie either side of the large foundation, the western one capped with
thick concrete. Two boiler depressions are visible to the west of the engine foundations. 5 metres east, at ground-level, is a concrete engine foundation with
protruding 1¼ inch mounting bolts. Running east from this foundation is a line of timber battery stumps set in rough concrete footings. The stumps are grouped
in four sets, representing the site of a 20-head battery. A remnant of a large mullock heap lies south of the engine foundations, on Crown land. The
foundations have been modified and are partially hidden by trees. Access is also restricted by boundary fences.
History Period of activity: 1865-1916 consisting of three companies Nil Desperandum (1865-1873), Nil (1882-1890+) and New Nil Desperandum (1906-1916)
Line of reef: Welbourne
Maximum recorded annual production: 3746zs obtained from 6158 tons in 1868
(Nil Desperandum) 2599ozs obtained from 7356 tons in 1908 (New Nil Desperandum)
Total production: 16,367ozs obtained from 58,992 tons
Dividends: £16,000 (Nil Desperandum), £3000 (New Nil Desperandum)
Deepest working level: 780 feet
Deepest shaft: unknown, but below water level
http://images.heritage.vic.gov.au › attachment
(City of Greater Bendigo: Marong Heritage Study Mining Sites)
Plan of New Nil Desperandum Co. gold mine, Bendigo. Plan has longitudinal section of mine. Written on outside of plan in black pen" New Nil Desperandum Co'.
Mine plan is part of the Margaret Roberts Collection. gold mining, gold, margaret roberts collection, mccoll rankin and stanistreet, commonweatlth bank chambers, nil desperandum co., marong