Showing 219 items
matching dam construction
-
Kiewa Valley Historical Society
Photo - Junction Dam Construction, Circa 1940's
... Photo - Junction Dam Construction...Black and white photograph of Junction Dam construction... of the construction of the Junction Dam detail the harsh conditions faced ...Junction (Lake Guy) Dam is a 'slab and buttress' type wall. A timber frame is built and then filled with concrete. The first batch of concrete was placed in September, 1940. By June, 1941 the buttresses were finished to a height safe from floods and in October of that year a flood of 2,800 cusecs occurred but with only slight damage to the installations. Industrial trouble caused some delays but there was also slow progress on the part of the contractor and the work was taken over by the S.E.C., terminating the contract. The dam was completed in March, 1944. A walkway was made through the dam wall. Lake Guy was named after Mr. L.T. Guy who was the Resident engineer, in charge of construction work and associated activities on the Kiewa Area from 1939 to November 1946Photos of the construction of the Junction Dam detail the harsh conditions faced by construction workers, building dams and villages to accommodate workers in the 1940s to the 1950s. Australia at this period in time, experienced a surge of population (influx of World War II refugees), which was the catalyst for developing and undergoing an enormous hydroelectricity program for the Alpine regions, both in Victoria and New South Wales. This program was initiated to supply electricity to the major southern Australian cities of Adelaide, Melbourne and Sydney. It was thought that these developments would reduce, if not eliminate, the requirement for coal driven power stations. However time has demonstrated that these power stations have not matched the demand required by the industries and the populations of the major urban and cities.Black and white photograph of Junction Dam constructionjunction dam, bogong, secv -
Ringwood and District Historical Society
Photograph, Capt. E.T. Miles, Mr. Trethowan (Supervisor of Works), W. Everard, M.P., A.T. Miles - At Maroondah Dam construction 1923-1924
... . Everard, M.P., A.T. Miles - At Maroondah Dam construction 1923... (Supervisor of Works), W. Everard, M.P., A.T. Miles - At Maroondah Dam..., M.P., A.T. Miles - At Maroondah Dam construction 1923-1924 ...Typed below photograph, "Capt. E.T. Miles, Mr. Trethowan (Supervisor of Works), W. Everard, M.P., A.T. Miles - At Maroondah Dam construction 1923-1924". -
Ringwood and District Historical Society
Photograph, Maroondah Dam construction 1923-24 - Capt E.T. Miles, Mr Trethowan, Mr W Everad and Mr A.T. Miles
... Maroondah Dam construction 1923-24 - Capt E.T. Miles, Mr...Catalogue card reads, "Maroondah Dam construction 1923-24... Dam construction 1923-24. Left to right: Capt.. E.T. Miles, Mr ...Catalogue card reads, "Maroondah Dam construction 1923-24. Left to right: Capt.. E.T. Miles, Mr. Trethowan (in charge of work), W. Everard, and A.T. Miles". -
Wodonga & District Historical Society Inc
Album - Hume Reservoir Australia Album - Foundation work and dam construction, June 1924, 1927
... Hume Reservoir Australia Album - Foundation work and dam... SCHEME. HUME RESERVOIR. 13. Foundation work and dam construction.... 13. Foundation work and dam construction proceeding inside ...This set of photos is from a leather bound album bearing the inscription "HUME RESERVOIR AUSTRALIA" plus 'The Rt. Hon. L. C. M. S. Amery, P. C., M .P.' all inscribed in gold. It was presented to The Rt. Hon. L. C. M. S. Amery, P. C., M. P, Secretary of State for Dominion Affairs on the occasion of his visit to the Hume Reservoir on 2nd November 1927. This album is of local and national significance as it documents the planning and development of the Hume Reservoir up to 1927. It was the largest water reservoir in the British Empire. The album records the pioneering engineering work that went into its construction.DEPARTMENT OF PUBLIC WORKS, N.S.W. RIVER MURRAY WATERS SCHEME. HUME RESERVOIR. 13. Foundation work and dam construction proceeding inside levee bank which may be seen at the right hand end of the work, New South Wales, June 1924.hume reservoir australia, river murray waters scheme, hume reservoir construction -
Melbourne Water
Photographs: The Maroondah Dam Wall Under Construction, 1921-1922
... Photographs: The Maroondah Dam Wall Under Construction ... which document the construction of the Maroondah Dam.... The construction of the dam wall represents an important advancement ...The Maroondah System was first and foremost developed as a functional component of Melbourne's Water Supply System. In addition to functionality, the Melbourne and Metropolitan Board of Works (MMBW) envisioned the Maroondah Reserve to be enjoyed aesthetically and recreationally by the public. This souvenir illustrates the realisation of the Maroondah System as a local recreational and tourist attraction in the early 20th century. The Maroondah Reserve gardens were landscaped with English-style ornamental stonework, exotic trees, flower beds and rose gardens. All features of the water supply system became widely celebrated as beauty spots that continue to be very popular to this day with tourists and locals alike. This souvenir is a product of that flourishing tourist trade. These water supply sites continue to enhance Melbourne’s charm and liveability and are now recognised as places of cultural and historic significanceThese photographs are invaluable in providing insight into many aspects of the Maroondah Reservoir’s early development. The dam wall is a distinctive example of early engineering techniques, with its gravity arch design and concrete construction. The construction of the dam wall represents an important advancement in the technology of dam-building.These images are part of a series of eight photographs which document the construction of the Maroondah Dam in the 1920s.melbourne metropolitan board of works, mmbw, melbourne water, photograph, water, maroondah dam, construction, wall -
Kiewa Valley Historical Society
Photograph of Bogong Dam Wall Construction - 2 identical photos, c1940
... Photograph of Bogong Dam Wall Construction - 2 identical...construction, dam wall, excavation... and the dam was completed in March 1944. Type of construction...Black and white photos (2 identical) of early construction... - Construction of Bogong Dam Wall (written in pencil) No. 2 - Same as one... Kiewa River to allow construction of the dam wall ...Excavation of a diversion tunnel was commenced in 1939 to divert water from the East Kiewa River to allow construction of the dam wall. This was completed in February 1940 and excavation for the dam wall commenced in the same month, with the first batch of concrete placed in September. Lewis construction Company had the contract, but the S.E.C. took over construction in March 1942 and the dam was completed in March 1944. Type of construction: reinforced concrete, slab buttress.Importance in the Kiewa area as it shows the formwork and preparation necessary before the pouring of concrete for the first dam in the Kiewa Hydro Electric SchemeBlack and white photos (2 identical) of early construction of Junction Dam wall, viewed from downstream.Back of photo, upper right hand corner: No. 1 - Construction of Bogong Dam Wall (written in pencil) No. 2 - Same as one (written in pencil)construction, dam wall, excavation, bogong, secv -
Bendigo Historical Society Inc.
Photograph - Kangaroo Flat Gold Mine Collection: photos of Woodvale site, Daly property, pre dam construction, 1986
... , Daly property, pre dam construction...: photos of Woodvale site, Daly property, pre dam construction ...Photographs taken at the time of the purchase by Western Mining Corporation of the property owned by G.P. Daly of Raywood Road, Woodvale, in 1986. The intent of the purchase was to provide land for the Woodvale ponds. Land size was 16 acres, known as Allotment 13, Section 3, Parish of Nerring. Paper with two colour photographs attached, each of three photos joined to show landscape view, of the property purchased from G.P Daly by Western Mining Corporation. Photographs show rural land, grassy paddocks with tree line in background. Barb wire fence visible in foreground of bottom photo. Top photograph is titled 23. Daly property looking south-east. Bottom photograph is titled 24. Daly property looking north east. woodvale, g.p. daly, western mining corporation, purchase -
Eltham District Historical Society Inc
Photograph, Maroondah Dam under construction
... Maroondah Dam under construction... Dam under construction Photograph ...Copy of black and white photographmaroondah dam -
Stawell Historical Society Inc
Slide, Ian McCann, The dam under Construction, 1965
... The dam under Construction... The dam under Construction Slide Ian McCann ...Colour Slide: Rubble in the dase of the damlake bellfield -
Stawell Historical Society Inc
Slide, Ian McCann, Side wall of the Dam under construction, 1960's
... Side wall of the Dam under construction.... Side wall of the Dam under construction Slide Ian McCann ...Colour slide shoning the side wall of th edaum druing constuction with at least six people on the cliff face.grampians -
Wodonga & District Historical Society Inc
Photograph - Mitta Junction Township
... Hume Dam Construction... on the Victorian side of the Hume Dam construction site (originally called... on the construction of the Hume Dam. Some of the photographs have been mounted... of the Hume Dam construction site (originally called the Mitta ...Mitta Junction which was established about 1920 on the Victorian side of the Hume Dam construction site (originally called the Mitta Junction Reservoir). The town was built to house workers and their families. It included houses, private and government boarding houses, a shop, hall and school as well as tennis courts and a cricket pitch. Mitta Junction was a thriving community with many activities, including Balls and Euchre Nights, held at the Hall which opened in February 1922. The community also fielded a very successful football team in the local competition. After the completion of the Dam, the village and all its contents were sold at auction in June 1936 for £7,000. Individual houses sold at about £40 for removal to nearby towns. The Mitta Junction School which opened in 1922 continued to operate with very small numbers after the village was moved. Its numbers were boosted in the early 1980s by the children of Army staff at the nearby Latchford Barracks Army Apprenticeship School. It finally closed in December 1985.These images are significant because they capture the history of an important vanished town whose residents played a vital role in the construction of the Hume Dam.A collection of black and white images and a sketch map featuring the village of Mitta Junction, built to house workers on the construction of the Hume Dam. Some of the photographs have been mounted on heavy card.mitta junction township, hume dam construction, hume dam history -
Kiewa Valley Historical Society
Photo - Junction Dam, September 1941
... Black & white photo of Junction Dam construction... & white photo of Junction Dam construction Photo - Junction Dam ...Junction Dam was part of the Hydro Electric Scheme during the 1940'sState Electricity Commission of Victoria construction of the Kiewa Hydro Electric SchemeBlack & white photo of Junction Dam constructionjunction dam, secv, bogong -
Kiewa Valley Historical Society
Photo - Junction Dam, November 1941
... Black and white photograph of Junction Dam construction... and white photograph of Junction Dam construction Photo - Junction ...Junction Dam was part of the Hydro Electric Scheme in the 1940'sState Electricity Commission of Victoria (S.E.C.V.) construction of the Kiewa Hydro Electric SchemeBlack and white photograph of Junction Dam constructionjunction dam, secv, bogong -
Kiewa Valley Historical Society
Black and white photo of Junction Dam wall under construction, c1940
... Black and white photo of Junction Dam wall under... construction of the dam wall. This was completed in February, 1940...Black and white photo, early construction of Junction Dam... photo, early construction of Junction Dam Wall, viewed from ...In December of 1939 the excavation of a diversion tunnel was commenced to divert water from the East Kiewa River to allow construction of the dam wall. This was completed in February, 1940. Lewis Construction Company had the contract with excavation starting in February and the first batch of concrete placed in September. In 1942 the SECV took over the construction and the wall was completed in March, 1944. Type of construction: Reinforced concrete, slab buttress.Of historical importance in the Kiewa area as it shows the form work and preparation necessary before the pouring of concrete for the first dam in the hydro electric scheme. The destruction caused by the 1939 bushfires is also evident in the upper left hand cornerBlack and white photo, early construction of Junction Dam Wall, viewed from downstreamOn back of photo (left hand upper corner) Junction Dam 5-4-81 Dam viewed from downstream. 352 Time to use for correct exp. 40 sec.bogong, junction dam, secv -
Kiewa Valley Historical Society
Photo - Junction Dam, 19/08/1940
... Black and white photograph of Junction Dam construction... and white photograph of Junction Dam construction. View from ...Junction Dam was part of the Hydro Electricity Scheme during the 1940'sState Electricity Commission (S.E.C.V.) construction of the Kiewa Hydro Electric SchemeBlack and white photograph of Junction Dam construction. View from upstream.junction dam, bogong, secv -
Wodonga & District Historical Society Inc
Photograph - Constructing the Hume Weir, c1928
... Hume dam construction... Dam during its initial construction and ongoing development... of photographs documenting the construction of the Hume Dam during its ...This image is from Wodonga Historical Society's large collection of photographs documenting the construction of the Hume Dam during its initial construction and ongoing development. Hume Dam took 17 years to construct from the turning of the first sod on 28 November 1919 by Sir Ronald Munro-Ferguson, Governor-General of Australia. The first filling was in December 1934 and it was officially opened on 21 November 1936. Between 1950 and 1961 further modifications were made which enlarged its storage capacity. Progressive improvements have been made since that time to ensure the dam meets modern safety standards.This photo reflects a major stage in the construction of the Hume Dam.A large black and white image of construction of the Hume Weir on the Murray River mounted on board.hume dam construction, hume weir australia -
Melton City Libraries
Photograph, Construction of Dam Wall- Melton Water Supply, 1963
... Construction of Dam Wall- Melton Water Supply...Photographs of the construction of the dam wall... identities Photographs of the construction of the dam wall ...Photographs of the construction of the dam wall for Melton's water supplylocal significant events, council, local architecture, local identities -
Kiewa Valley Historical Society
Photograph Junction Dam, Photo Junction Dam and Bogong Village in Background, circa 1950s
... dam construction... working conditions and housing in the construction of the Junction... paper. The paper is semi gloss.This photo is of the construction... and housing in the construction of the Junction Dam in the 1940s ...This item clearly shows the conditions covering both working conditions and housing in the construction of the Junction Dam in the 1940s. Working conditions were extreme and health and safety legislation was at its infancy. The residential buildings were intended to last only for the period of construction, however greater demand for longevity as a tourist haven prevailedThis photo of the construction of the Junction Dam, with The Bogong village as backdrop, details the harsh conditions faced by construction workers, building dams and villages to accommodate workers in the 1940s to the 1950s. Australia at this period in time, experienced a surge of population (influx of World War II refugees), which was the catalyst for developing and undergoing an enormous hydroelectricity program for the Alpine regions, both in Victoria and New South Wales. This program was initiated to supply electricity to the major southern Australian cities of Adelaide, Melbourne and Sydney. It was thought that these developments would reduce, if not eliminate, the requirement for coal driven power stations. However time has demonstrated that these power stations have not matched the demand required by the industries and the populations of the major urban and cities.Black and white photo of original photo with a flashlight reflection in the bottom centre. The photo is on Kodak XtraLife II paper. The paper is semi gloss.This photo is of the construction of the Junction Dam Wall with the Bogong Townshiip in the background.Back of photo is printed " Kodak XtraLite II paperdam construction, bogong village, alpine development, junction dam -
Rutherglen Historical Society
Image, c1935
... dam construction... Society hume weir dam construction On back of photo: "Construction ...Donated by Mrs A Terrill, member of Rutherglen Historical SocietyBlack and white reproduction of unmounted photograph of Hume Weir dam wallOn back of photo: "Construction of Hume Weir"hume weir, dam construction -
Rutherglen Historical Society
Image, October 1929
... dam construction... a single sheet of A4 paper. This one is of construction work... construction dam construction Written on paper next to photo: "Valves ...Photocopies of Hume Weir photographs 1928-29One of two black and white photographs, photocopied onto a single sheet of A4 paper. This one is of construction work on a dam, with scaffolding above a partially completed wall. Water is flowing through several valves in the wall.Written on paper next to photo: "Valves etc. at Hume Weir Oct '29"hume weir, construction, dam construction -
Rutherglen Historical Society
Image, October 1929
... dam construction... a single sheet of A4 paper. This one is of construction work... construction dam construction Written on paper next to photo: "Needle ...Photocopies of Hume Weir photographs 1928-29One of two black and white photographs, photocopied onto a single sheet of A4 paper. This one is of construction work on a dam, showing lower part of dam wall, and featuring one of the valves.Written on paper next to photo: "Needle valve Hume Weir Albury Oct '29"hume weir, construction, dam construction -
Rutherglen Historical Society
Image, c 1930
... dam construction...-country hume dam hume weir hume reservoir lake hume dam ...Black and white photograph of the Hume Weir under construction.On back of photo: "Hume Weir" and an oval rubber stamp "V. Peterson | Photographer | Hume Reservoir"hume dam, hume weir, hume reservoir, lake hume, dam construction -
Rutherglen Historical Society
Image, c 1930
... dam construction...-country hume dam hume weir hume reservoir lake hume dam ...Black and white photograph of the Hume Weir under construction.On back of photo: "Hume Weir" and an oval rubber stamp "V. Peterson | Photographer | Hume Reservoir"hume dam, hume weir, hume reservoir, lake hume, dam construction -
Kiewa Valley Historical Society
Photo - Junction Dam, December 1941
... Black and white photograph of Junction Dam formwork... and white photograph of Junction Dam formwork construction Photo ...Junction Dam was part of the Hydro Electricity Scheme during the 1940'sState Electricity Commission of Victoria (S.E.C.V.) construction of the Kiewa Hydro Electric SchemeBlack and white photograph of Junction Dam formwork constructionjunction dam, bogong, secv -
Eltham District Historical Society Inc
Album - Photograph, J.A. McDonald, Upper Yarra Dam, Oct. 1956
... Upper Yarra Dam construction October 1956... melbourne Upper Yarra Dam construction October 1956 Record ...Upper Yarra Dam construction October 1956Record of various Shire of Eltham infrastructure works undertaken during the period of 1952-1962 involving bridge and road reconstruction projects, sometimes with Eltham Shire Council Project Reference numbers quoted. It was during this period that a number of significant improvements were made to roads and new bridges constructed within the shire that remain in place as of present day (2022). In many situations, the photos provide a tangible visible record of infrastructure that existed throughout the early days of the Shire. The album was put together by or under the direction of the Shire Engineer, J.A. McDonald.infrastructure, shire of eltham, bridge construction, road construction, 1956-10, upper yarra da, upper yarra reservoir -
Puffing Billy Railway
Vehicle - Traction Engine - Foden Compound, 1914
... for saw milling, dam constructions and log hauling...., & Davies Ltd Melbourne Used for saw milling, dam constructions ...Ordered by Langwill Bros., & Davies Ltd Melbourne Used for saw milling, dam constructions and log haulingFoden Traction Engine This engine is a compound traction engine built by Foden Ltd of Sandbach England in 1914 – builders number 4525. This was ordered by Langwill Bros and Davies Ltd of Melbourne and was used by Mr F Orr on his farm at Bullarto South Victoria. On the farm it was used for many agricultural purposes and was used at times as a stationary engine to run a wooden thrashing machine. The unit was last used on the farm in 1947 and put aside on the farm with a “museum” of other old agricultural tractors and machinery. Mr Orr gave us the engine as an exhibit for the Menzies Creek Museum of Puffing Billy in the 1960s. At that stage he was an elderly gentleman of 97 years and maintained a great interest in his farm which had been in his family’s hands for three generations at that stage. His grandfather had cut the farm from the bush. The traction engine in its youth was used to go around other farms in the district and went as far away as the Wimmera and Mallee farms thrashing crops of wheat, barley and oats. It towed the wooden thrashing machine behind it on its trips to these farms on hire to the farmers. Foden Compound Traction Engine Built by Foden Ltd., Sandback, England in 1914 to the order of Langwill Bros., & Davies Ltd., Melbourne, it was used on a farm for sawmilling, dam constructions and log hauling. Donated by F. Orr of Bullarto South, Victoria. Foden Compound Traction Engine - made of Steel (Painted)Foden foden, traction engine, steam, puffing billy -
Kew Historical Society Inc
Album - Photograph Album No.1, Henry Beater Christian, 1924-26
... maroondah dam (vic.) — construction... (vic.) black spur (vic.) marysville (vic.) maroondah dam (vic ...Henry Christian (c.1809-91), the grandfather of the photographer, was one of the first settlers in Kew. He arrived in Victoria with his wife Agnes and son Orlando in 1855 on the Gypsy Queen. He established a rope-making business in Bulleen Road by 1858 but was declared insolvent two years later. In his final years, he was celebrated as one of the oldest living settlers of the district. His son, Orlando Henry Beater Christian (c.1853-1930) became a member of the Hawthorn Band and a foundation member of the Willsmere Swimming Club. Orlando and his wife Elizabeth had four children of which Henry Beater Christian (1886-1962) was the oldest.An album of photographs, compiled by Henry Beater Christian (1886-1962) of Pakington Street, Kew, depicting individuals, natural and settled environments and the interactions between these worlds. Henry Christian, was a keen explorer, not just of his immediate environment but also of the Victorian wilderness. His major opus is contained in two albums in which he records, sometimes in majestic detail and on other occasions the intimate features of the natural world. His photographic travels during the 1920s, often in solitary ramblings but on other occasions with companions, recall the heroic landscape photography of an earlier era, pioneered by Nicholas Caire. In addition to their aesthetic value, the albums are historically significant records within the State of Victoria, of what is now a distant point in time, and of places that have become radically altered through human intervention.Digital copy of a 47-page photograph album containing 255 gelatinous silver images, loaned by Diane Washfold with permission given to digitise and hold a copy in our collection. The album contains a groups of photographic positives taken by Henry B Christian (a resident of Pakington Street), of places in Kew and throughout regional Victoria during the 1920s. The mainly sepia photographs, while small, are of a high resolution. Photographs are typically lightly glued onto pages. Locations are frequently identified by white or black ink, which in a number of cases is illegible due to wear.henry beater christian (1886-1962), landscape photography, photograph albums, kew (vic.) — yarra river, kew (vic.) — zig-zag bridge, kew (vic.) — macauley’s boathouse, studley park (vic.) — yarra river, wonderland — grampians (vic.), black spur (vic.), marysville (vic.), maroondah dam (vic.) — construction, warburton (vic.), cockatoo (vic.), bruthen (vic.), swan reach road (vic.), glen hills (vic.), lightning creek (vic.), omeo (vic.), glen wills (vic.), mt wills (vic.), sunnyside (vic), granite flat (vic.), toolangi (vic.), yea (vic, )., flowerdale (vic.), mt white law (vic.), baw baw (vic.), christian-washfold collection -
Kiewa Valley Historical Society
Photographs x 2 - Clover Dam, Circa 1940's
... photograph of Clover Dam under construction showing workmen at work.... Construction of dams, such as Clover Dam provided the large quantity ...As part of the push to cut electricity costs and diversify supply, the Victorian Government (circa 1930) implemented the conversion strategy from mainly brown coal supply to hydro - electricity. The Kiewa Hydroelectric Scheme became the largest scheme of its kind in the State Of Victoria and the second largest scheme in Australia. Clover Dam and Power Station were built by the State Electricity Commission of Victoria as part of the Kiewa Hydro Electric Scheme from the late 1930's to the early 1940's. This dam was constructed to supply water to feed four turbines (62 mega watts) at the West Kiewa Power Station. This was at the forefront of sustainable "Green" energy. Costs associated with power supplies is still a major incentive of governments, however environmentally friendly alternatives such as wind and nuclear have also made inroads. The Kiewa valley and its surrounding alpine catchment were looked at(Victorian State Government), from the beginning of the twentieth century as a source of alternate power for an ever-increasing demand for electricity by growing population and heavy industrial areas within Melbourne City and State regions. Construction of dams, such as Clover Dam provided the large quantity holding areas of water required to turn the turbines at the various power stations to provide the electricity needed. The impact of these controls by moderating water run-off from the alpine regions is beneficial in reducing flooding from thawing of snow on the alps. This by-product allows agriculture and grazing to be less vulnerable to seasonal flooding thereby resulting in a more stable annual production level. Photographs also document early engineering and building techniques used in the construction of dams and power stations during the 1940’s and 1950’s. Note the lack of safety equipment and suitable work attire worn by construction workers on the sites 1. Black and white photograph of Clover Dam under construction. Has a .5cm white border around photo 2. Black and white photograph of Clover Dam under construction showing workmen at work. Has a .5cm white border around photo Written in pencil on back of both photographs - Clover Damclover dam, secv -
The Beechworth Burke Museum
Photograph, c. 1927 - 1930
... with the construction of Hume Dam, its associations with the River Murray Waters ...Taken during the construction of the Bethanga Bridge (1927-1930), this sepia photograph shows a view of the incomplete bridge taken from inside the structure and looking down the span of the bridge from where the photographer stands. The photograph depicts an incomplete deck, with loose-looking wooden planks/panels lain along the centre in groups of three. Once complete, the original decking of the bridge was made of timber before being replaced by cement in 1961 (Victorian Heritage Database).Bethanga Bridge is of historical significance to the Indigo Shire for its associations with the construction of Hume Dam, its associations with the River Murray Waters Agreement and the River Murray Commission, and illustration of the needs and influence of the farming communities along the river in this area - particularly in relation to the building of the Weir. It also represents the collaboration between New South Wales and Victoria on a large infrastructure project, being the only built structure shared by both New South Wales and Victoria due to its location. also reflecting on the Shire's geographical closeness to this neighboring state. This photograph is part of a series that documents the construction of this well-known heritage site of significance to the Indigo Shire. It reflects upon a period of growth and change in the area.Sepia, rectangular photograph printed on matt photographic paper, unmountedReverse: 1997.3190 / Another snap of the bridge. taken on the bridge showing huge steel sides / 84-19-4 / V [in circle] 354 / KODAK PRINTbethanga bridge, hume dam, bridges album, construction, road construction, hume weir -
Kiewa Valley Historical Society
Photograph of Clover Dam foundations, Clover Dam Foundations, 1949
... Black and white photograph taken during the construction... Dam and also shows the methods of construction used ...Stripping of the foundations commenced in 1948 and the first concrete in the dam was poured in May, 1949. With the suspension for the winter months of work on the High Plains, it was possible to increase the number of men, and work then proceeded at a steady pace for the remainder of the year. Some interruption was caused by a flood in September, which over topped the rockfill coffer dam. By the end of 1950 17,000 yards of material had been excavated from the foundations and 4,000 cubic yard of concrete placed. Work at Clover Dam was completed in 1953, but two bays were left open for flood emergency. The pondage was filled on the 16th August, 1954. A pictorial record of the placing of concrete foundations of Clover Dam and also shows the methods of construction used at this site in 1949.Black and white photograph taken during the construction of Clover Dam. Shows early stages of the concrete foundations, cranes and the railway line which was constructed to bring materials to the site. Handwritten in blue ink of back of photograph "Clover Dam Foundations"dam, foundations, concrete, construction