Showing 3 items matching "leighton contractors"
-
Melbourne Tram MuseumDrawing, Leighton Contractors, "PTC - Southbank Light Repair Centre", 1996
... ...Leighton Contractors...Prepared by Leighton Contractors for the PTC. ...Leighton Contractors..."PTC - Southbank Light Repair Centre" Drawing Leighton Contractors ...Drawing - "PTC - Southbank Light Repair Centre" - showing the first stage of the Southbank tram depot, 1996. Provides a site plan showing tram tracks, maintenance building, amenities and adjacent roads. The depot has since been extended. Prepared by Leighton Contractors for the PTC. Yields information about Southbank tram depot 1996A3 sheet printed - two copies held.tramways, southbank tram depot, leighton contractors, trackwork -
Melbourne Tram MuseumNegative - Swan St Burnley overbridge works - set of 2, Hugh Ballment, 4/1969
... There is a sign for Leighton contractors. Work was done during April 1969 - item 1426. ...There is a sign for Leighton contractors. Work was done during April 1969 - item 1426. ...The photographs show track work at the Swan St railway overbridge Burnley as part of the construction of the third track between Burnley and Hawthorn stations. The work involved a temporary track on part of the future bridge which involved single line working for tram line for a while. Construction crews are working on setting up the deviation for the temporary track. There is a sign for Leighton contractors. Work was done during April 1969 - item 1426. See item 6600 for other photographs of the work.Yields information about the reconstruction of the railway overbridge at Burnley for the 3rd track between Burnley and Hawthorn.Negative - 127 film black and whitetramways, swan st, bridge works, burnley -
Melbourne Tram MuseumDocument - Report, Metropolitan Transit Authority (MTA), "Hong Kong Light Rail System", c1990
... Report - 20 A4 pages stapled in the top left hand corner - titled "Hong Kong Light Rail System" with a table of contents, explaining the joint venture between the MTA and Leighton Asia and other major sub-contractors including Comeng, with diagrams, project roles, the vehicles....Melbourne Tram Museum 8 Wallen Road Hawthorn melbourne Trams tramways Light Rail Hong Kong Comeng The Met MTA Report - 20 A4 pages stapled in the top left hand corner - titled "Hong Kong Light Rail System" with a table of contents, explaining the joint venture between the MTA and Leighton Asia and other major sub-contractors including Comeng, with diagrams, project roles, the vehicles. ...Report - 20 A4 pages stapled in the top left hand corner - titled "Hong Kong Light Rail System" with a table of contents, explaining the joint venture between the MTA and Leighton Asia and other major sub-contractors including Comeng, with diagrams, project roles, the vehicles.trams, tramways, light rail, hong kong, comeng, the met, mta
