Showing 7 items matching "soil sterilization"
-
University of Melbourne, Burnley Campus ArchivesPhotograph - Black and white print, E.M. Gibson, Soil Sterilizer, April 1947
... Soil Sterilizer. Built 1946." EMG...Black ands white photograph of the Soil Sterilizer in the Old Nursery in a shed...."April 1947. Soil Sterilizer - Bin. Built 1946." E M Gibson 689 1/1...Soil Sterilizer. Built 1946." EMG soil sterilizer bin e. m. gibson collection old nursery "April 1947. ...Soil Sterilizer. Built 1946." EMGBlack ands white photograph of the Soil Sterilizer in the Old Nursery in a shed."April 1947. Soil Sterilizer - Bin. Built 1946." E M Gibson 689 1/1soil sterilizer, bin, e. m. gibson collection, old nursery -
University of Melbourne, Burnley Campus ArchivesPhotograph - Black and white print, E.M. Gibson, Soil Sterilizer, April 1947
... Black and white photograph of the Soil Sterilizer and Boiler in a shed in the Old Nursery..."April 1947. Soil Sterilizer - General view. Built 1946." E M Gibson 689 1/3...Soil Sterilizer - General view. Built 1946." E M Gibson 689 1/3 Black and white photograph of the Soil Sterilizer and Boiler in a shed in the Old Nursery Soil Sterilizer Photograph Black and white print E.M. ...Black and white photograph of the Soil Sterilizer and Boiler in a shed in the Old Nursery"April 1947. Soil Sterilizer - General view. Built 1946." E M Gibson 689 1/3soil sterilizer, e. m. gibson collection, boil, er, old nursery -
University of Melbourne, Burnley Campus ArchivesPhotograph - Black and white print, E.M. Gibson, Soil Sterilizer Boiler, April 947
... Soil Sterilizer. Built 1946." EMG..."April 1947. Soil Sterilizer - Boiler. Built 1946." E M Gibson 689 1/2...Soil Sterilizer. Built 1946." EMG soil sterilizer boiler e. m. gibson collection old nursery "April 1947. ...Soil Sterilizer. Built 1946." EMGBlack and white photograph of a boiler in a shed in the Old Nursery."April 1947. Soil Sterilizer - Boiler. Built 1946." E M Gibson 689 1/2soil sterilizer, boiler, e. m. gibson collection, old nursery -
University of Melbourne, Burnley Campus ArchivesPlan, Arrangement of Soil Sterilizing Room for New Plant Science Laboratory at Burnley College of Horticulture, c. 1960
... ...Soil sterilization...Arrangement of Soil Sterilizing Room for New Plant Science Laboratory at Burnley College of Horticulture Plan ...Plan by State of Victoria, Dept. of Public Works. showing connections between ducts and sterilization trolley. Drawn by R.M. department of public works, soil sterilization, plant science laboratory -
Sunshine and District Historical Society IncorporatedAdministrative record - City of Sunshine - Commissioner Mr Alexander Alex George Gillon Collection 1976 - 1982 - Notice of finance meeting of the council 14th November 1978, City of Sunshine, 8th November 1978
... Notice of Finance Meeting of the Council 14th November 1978 Report of the Town Clerk Proposed Hostel for the Fail Aged 319 - 321 Geelong Road Kingsville Request for Financial Assistance Tenders for Vending Machines Sunshine Swimming Pool The Hub Statement of Receipts and Payment of the Period Ended 23rd October 1978 The Municipal Sunshine Tip Statement of Receipts and Payment of the Period Ended 23rd October 1978 City of Sunshine General Account City of Sunshine Financial Reports for the Period Ended 23rd October 1978 Report of the City Engineer Soil Sterilizer Nursery Replacement of Sweeper No 123 Bon Thomas Reserve Pre-School Centre Outfall Stormwater Drain & Water Main Neale Road Construction (North Carriageway) Application to Country Road Board for Funds for the Year Ending 30th June 1980...City of Sunshine Alexander "Alex" George Gillon Sunshine Swimming Pool Kennedy Street Sunshine The Hub Sun Crescent Sunshine Tip Bon Thomas Reserve Pre-School Centre Bon Thomas Reserve Quinn Street Neale Road Deer Park Notice of Finance Meeting of the Council 14th November 1978 Report of the Town Clerk Proposed Hostel for the Fail Aged 319 - 321 Geelong Road Kingsville Request for Financial Assistance Tenders for Vending Machines Sunshine Swimming Pool The Hub Statement of Receipts and Payment of the Period Ended 23rd October 1978 The Municipal Sunshine Tip Statement of Receipts and Payment of the Period Ended 23rd October 1978 City of Sunshine General Account City of Sunshine Financial Reports for the Period Ended 23rd October 1978 Report of the City Engineer Soil Sterilizer Nursery Replacement of Sweeper No 123 Bon Thomas Reserve Pre-School Centre Outfall Stormwater Drain & Water Main Neale Road Construction (North Carriageway) Application to Country Road Board for Funds for the Year Ending 30th June 1980 Foolscap sized document. ...Notice of Finance Meeting of the Council 14th November 1978 Report of the Town Clerk Proposed Hostel for the Fail Aged 319 - 321 Geelong Road Kingsville Request for Financial Assistance Tenders for Vending Machines Sunshine Swimming Pool The Hub Statement of Receipts and Payment of the Period Ended 23rd October 1978 The Municipal Sunshine Tip Statement of Receipts and Payment of the Period Ended 23rd October 1978 City of Sunshine General Account City of Sunshine Financial Reports for the Period Ended 23rd October 1978 Report of the City Engineer Soil Sterilizer Nursery Replacement of Sweeper No 123 Bon Thomas Reserve Pre-School Centre Outfall Stormwater Drain & Water Main Neale Road Construction (North Carriageway) Application to Country Road Board for Funds for the Year Ending 30th June 1980 city of sunshine, alexander "alex" george gillon, sunshine swimming pool, kennedy street, sunshine, the hub, sun crescent, sunshine tip, bon thomas reserve pre-school centre, bon thomas reserve, quinn street, neale road, deer park -
Sunshine and District Historical Society IncorporatedAdministrative record - City of Sunshine - Commissioner Mr Alexander Alex George Gillon Collection 1976 - 1982 - Report of committee meetings 14th November 1978, City of Sunshine, 14th November 1978
... Report of Committee Meetings 14th November 1978 Works Committee Two Days Have Been Lost Due To Bad Weather West Road Footpath 75% Completed Braybrook Area Footpath Work is Progressing Macedon Street Kerb & Channell 80% Completed McIntyre Road South of Bridge Kerb & Channell 80% Completed McIntyre Road South of Bridge Road Works Delayed Due to No Supply of Bitumen Cullin Street Road Works Delayed Due to No Supply of Bitumen Petrol Storage for Mowers Is Causing Issues The Sealing of Concrete Wickets with Laycol not yet completed Fire Hazard Gangs have commenced removing fire hazards Council Surveyors have carried out initial survey of Castley Reserve Swimming Pool completion date 22nd November 1978 but still could be delayed due to connection of gas and commissioning time Bon Thomas Reserve and Diamond Avenue Reserve progress is slow due to vandalism and supply of rubber gaskets Orama Street Pre-School and Child Care Centre concrete slab has been poured Highpoint West site works begin this week Toilets on Reserves nearing completion with the exception of Selwyn Park Steps are being taken to minimise the fuel storage during the current T.W.U. stoppage Report of the Finance Committee Report of the Town Clerk Proposed Hostel for Failed Aged Request for Financial Assistance Tenders for Vending Machines Sunshine Swimming Pool Overpayment of Gratuities Report of the City Engineer Soil Sterilizer Nursery Replacement of Sweeper No 123 Bon Thomas Resereve Pre-School Centre Neale Road Construction (North Carriageway) Application to Country Roads Board for Funds for the Year Ending 30th June 1980 ...City of Sunshine Alexander "Alex" George Gillon West Road Maribyrnong Macedon Street Maidstone McIntyre Road Sunshine North Cullin Street Castley Reserve Simmie Street Sunshine West Bon Thomas Reserve Quinn Street Diamond Avenue Reserve Daimond Avenue Albanvale Orama Street Pre-School and Child Care Centre Orama Street Deer Park Highpoint West Rosamond Road Selwyn Park Selwyn Street Albion Sunshine Swimming Pool Kennedy Street Bon Thomas Resereve Pre-School Centre Neale Road Report of Committee Meetings 14th November 1978 Works Committee Two Days Have Been Lost Due To Bad Weather West Road Footpath 75% Completed Braybrook Area Footpath Work is Progressing Macedon Street Kerb & Channell 80% Completed McIntyre Road South of Bridge Kerb & Channell 80% Completed McIntyre Road South of Bridge Road Works Delayed Due to No Supply of Bitumen Cullin Street Road Works Delayed Due to No Supply of Bitumen Petrol Storage for Mowers Is Causing Issues The Sealing of Concrete Wickets with Laycol not yet completed Fire Hazard Gangs have commenced removing fire hazards Council Surveyors have carried out initial survey of Castley Reserve Swimming Pool completion date 22nd November 1978 but still could be delayed due to connection of gas and commissioning time Bon Thomas Reserve and Diamond Avenue Reserve progress is slow due to vandalism and supply of rubber gaskets Orama Street Pre-School and Child Care Centre concrete slab has been poured Highpoint West site works begin this week Toilets on Reserves nearing completion with the exception of Selwyn Park Steps are being taken to minimise the fuel storage during the current T.W.U. stoppage Report of the Finance Committee Report of the Town Clerk Proposed Hostel for Failed Aged Request for Financial Assistance Tenders for Vending Machines Sunshine Swimming Pool Overpayment of Gratuities Report of the City Engineer Soil Sterilizer Nursery Replacement of Sweeper No 123 Bon Thomas Resereve Pre-School Centre Neale Road Construction (North Carriageway) Application to Country Roads Board for Funds for the Year Ending 30th June 1980 Foolscap sized document. ...Report of Committee Meetings 14th November 1978 Works Committee Two Days Have Been Lost Due To Bad Weather West Road Footpath 75% Completed Braybrook Area Footpath Work is Progressing Macedon Street Kerb & Channell 80% Completed McIntyre Road South of Bridge Kerb & Channell 80% Completed McIntyre Road South of Bridge Road Works Delayed Due to No Supply of Bitumen Cullin Street Road Works Delayed Due to No Supply of Bitumen Petrol Storage for Mowers Is Causing Issues The Sealing of Concrete Wickets with Laycol not yet completed Fire Hazard Gangs have commenced removing fire hazards Council Surveyors have carried out initial survey of Castley Reserve Swimming Pool completion date 22nd November 1978 but still could be delayed due to connection of gas and commissioning time Bon Thomas Reserve and Diamond Avenue Reserve progress is slow due to vandalism and supply of rubber gaskets Orama Street Pre-School and Child Care Centre concrete slab has been poured Highpoint West site works begin this week Toilets on Reserves nearing completion with the exception of Selwyn Park Steps are being taken to minimise the fuel storage during the current T.W.U. stoppage Report of the Finance Committee Report of the Town Clerk Proposed Hostel for Failed Aged Request for Financial Assistance Tenders for Vending Machines Sunshine Swimming Pool Overpayment of Gratuities Report of the City Engineer Soil Sterilizer Nursery Replacement of Sweeper No 123 Bon Thomas Resereve Pre-School Centre Neale Road Construction (North Carriageway) Application to Country Roads Board for Funds for the Year Ending 30th June 1980 city of sunshine, alexander "alex" george gillon, west road, maribyrnong, macedon street, maidstone, mcintyre road, sunshine north, cullin street, castley reserve, simmie street, sunshine west, bon thomas reserve, quinn street, diamond avenue reserve, daimond avenue, albanvale, orama street pre-school and child care centre, orama street, deer park, highpoint west, rosamond road, selwyn park, selwyn street, albion, sunshine swimming pool, kennedy street, bon thomas resereve pre-school centre, neale road -
Sunshine and District Historical Society IncorporatedAdministrative record - City of Sunshine - Commissioner Mr Alexander Alex George Gillon Collection 1976 - 1982 - Report of committee meetings 15th October 1979, City of Sunshine, 16th October 1979
... Survey three men presently working at Sunshine Tip on this survey Bon Thomas Reserve Pre-School Centre building completed Orama Street Child Care Centre building completed Diamond Avenue Pre-School Centre and Diamond Avenue Infant Welfare Centre building completed Highpoint West Infant Welfare Centre and Highpoint West Library completion estimated in 3 to 4 weeks Ballarat Road Infant Welfare Centre requires further internal painting Depot Aemities Block 3 to 4 weeks for completion Scovell Reserve excavations completed, ready to pour slab Diamond Avenue Pre-School Centre and Diamond Avenue Infant Welfare Centre landscaping completed Bon Thomas Reserve Pre-School Centre work progressing Dempster Park synthetic turf laid on two practice wickets Council Nursery soil sterilizer connected ready to operate Various Reserves Car Parks crush rock has been delivered Matthews Hill Reserve water reticulation extended. ...Survey three men presently working at Sunshine Tip on this survey Bon Thomas Reserve Pre-School Centre building completed Orama Street Child Care Centre building completed Diamond Avenue Pre-School Centre and Diamond Avenue Infant Welfare Centre building completed Highpoint West Infant Welfare Centre and Highpoint West Library completion estimated in 3 to 4 weeks Ballarat Road Infant Welfare Centre requires further internal painting Depot Aemities Block 3 to 4 weeks for completion Scovell Reserve excavations completed, ready to pour slab Diamond Avenue Pre-School Centre and Diamond Avenue Infant Welfare Centre landscaping completed Bon Thomas Reserve Pre-School Centre work progressing Dempster Park synthetic turf laid on two practice wickets Council Nursery soil sterilizer connected ready to operate Various Reserves Car Parks crush rock has been delivered Matthews Hill Reserve water reticulation extended. ...Report of Works Committee Meeting Kerb & Channel Burns Street and Sonley Street completed Kerb & Channel Thomson Street commenced Kerb & Channel Furlong Road completed Kerb & Channel Mernda Street & Maynes Street commenced Footpath Kellaway Street two thirds complete Footpath Braybrook Area work now progressing in Elizabeth Street Report of the Finance Committee Report of the Town Clerk Estimates 1979/80 Report of the City Engineer & Planner Capital Works Programme 1979/80/81 Report of the Agenda & Forward Planning Committee Report of the Town Clerk Contract for Cleaning of Council Properties Report of the Chief Health Surveyor Infant Welfare Report of the Superintendent of Traffic & By-Laws Report of the City Librarian Reports on Melton Library Report of the City Engineer Planning Permit Application Additional Skating Rink Wright Street Sunshine Tenders for Road Sweeper Tenders for Class Dozer Tenders for Semi-trailer Type Bookmobile Tenders for Tractor Loader Drainage Sunshine View Estate State2 Aycliffe Drive Pre-School & Infant Welfare Centre Footpath Glengala Road near S.E.C. Easement work progressing Roadworks Mernda Street & Maynes Street excavation completed Roadworks Burns Street and Sonley Street progressing Drainage McLeod Street completed Drainage Andrea Street commenced Repairs to Yallourn Street Bridge progressing Sassella Park runups for Little Athletics now excavated E.P.A. Survey three men presently working at Sunshine Tip on this survey Bon Thomas Reserve Pre-School Centre building completed Orama Street Child Care Centre building completed Diamond Avenue Pre-School Centre and Diamond Avenue Infant Welfare Centre building completed Highpoint West Infant Welfare Centre and Highpoint West Library completion estimated in 3 to 4 weeks Ballarat Road Infant Welfare Centre requires further internal painting Depot Aemities Block 3 to 4 weeks for completion Scovell Reserve excavations completed, ready to pour slab Diamond Avenue Pre-School Centre and Diamond Avenue Infant Welfare Centre landscaping completed Bon Thomas Reserve Pre-School Centre work progressing Dempster Park synthetic turf laid on two practice wickets Council Nursery soil sterilizer connected ready to operate Various Reserves Car Parks crush rock has been delivered Matthews Hill Reserve water reticulation extended. Boom gates to be erected in Duke Street in conjunction with M.M.B.W. Tree Maintenance 92% completeburns street, sonley street, thomson street, maidstone, furlong road, sunshine north, mernda street, maynes street, sunshine west, kellaway street, elizabeth street, braybrook, skating rink, wright street, sunshine, aycliffe drive pre-school & infant welfare centre, aycliffe drive, deer park, glengala road, mcleod street, andrea street, st. albans, yallourn street bridge, yallourn street, ardeer, deer park little athletics centre, sassella park, station road, bon thomas reserve pre-school centre, quinn street, orama street child care centre, orama street, diamond avenue pre-school centre, diamond avenue infant welfare centre, diamond avenue, albanvale, highpoint west infant welfare centre, highpoint west library, rosamond road, maribyrnong, ballarat road infant welfare centre, ballarat road, scovell reserve, scovell crescent, dempster park, phoenix street, matthews hill reserve, matthews street, duke street
