Showing 3 items matching "termination of contract"
-
Bendigo Military MuseumDocument - ROUTINE ORDERS, Aust Dept of Defence, c1961
... ...Termination of Contract...Part of the collection of "William Fawcett" V246452 refer Cat No 9627. CMF Termination of Contract fawcett 1 Headed: "Routine orders Part 11 No's 77-145 incl. ...The ACMF was the Australian Citizen Military Forces and was the Army Reserve. Part of the collection of "William Fawcett" V246452 refer Cat No 9627.Three (3) cream colour foolscap sheets with writing in purple, lists 33 officers who have been terminated from ACMF and transferred to Royal Aust Infantry or other related units.Headed: "Routine orders Part 11 No's 77-145 incl. By Brigadier S.M. McDONALD MC", "RESTRICTED".cmf, termination of contract, fawcett 1 -
Robin Boyd FoundationDocument, Frederick Romberg, The Gromboyd Letters extra page, 1987
... The concluding paragraph of the contract between Grounds, Romberg, and Boyd and the National Art Gallery and Cultural Centre is reviewed and the details of events that gave rise to the termination of the partnership with Grounds are outlined....The concluding paragraph of the contract between Grounds, Romberg, and Boyd and the National Art Gallery and Cultural Centre is reviewed and the details of events that gave rise to the termination of the partnership with Grounds are outlined. ...This is an added page to the two volume 'Gromboyd Letters' (items D269-270). The concluding paragraph of the contract between Grounds, Romberg, and Boyd and the National Art Gallery and Cultural Centre is reviewed and the details of events that gave rise to the termination of the partnership with Grounds are outlined.Single foolscap typewritten photocopy pagegromboyd, roy grounds, frederick romberg, national art gallery, cultural centre, robin boyd -
Melbourne Tram MuseumDocument - Specification, City of Melbourne Tramways, "Hawthorn Horse Tram", 1880s
... Contract No 109 - as per above, except for termination at Auburn Road. ...Contract No 109 - as per above, except for termination at Auburn Road. ...Contract No 52 - Specification of materials to be supplied, and works to be performed, in the construction of the Hawthorn Tramway. The contract embraces the excavation, laying down of permanent way, metalling, paving, and every detail complete as shown in the drawings. The contract commences at the Hawthorn Terminus of the Richmond Cable Tramway and extends along Burwood Road, Power Street, Riversdale Road and terminates at Glenferrie Road. Total length 1 mile, 52 chains and 25 links. Contract No 109 - as per above, except for termination at Auburn Road. Total length 67 chains and 50 links. .trams, tramways, horse trams, tenders, trackwork
