Physical description
Contract No 52 - Specification of materials to be supplied, and works to be performed, in the construction of the Hawthorn Tramway. The contract embraces the excavation, laying down of permanent way, metalling, paving, and every detail complete as shown in the drawings. The contract commences at the Hawthorn Terminus of the Richmond Cable Tramway and extends along Burwood Road, Power Street, Riversdale Road and terminates at Glenferrie Road. Total length 1 mile, 52 chains and 25 links.
Contract No 109 - as per above, except for termination at Auburn Road. Total length 67 chains and 50 links.
.