Historical information
The photograph shows the demolition and removal of the cable tram track at the intersection of Smith Street and Queens Parade North Fitzroy. The workmen are excavating the former cable tram track. The inbound cable tram track remains in position. The 1955 Annual Report notes that work commenced following the completion of the Queen's visit in March 1954 and that all work was done by day labour. The track was opened to electric tram service late in June 1955.
The second image is from a Melbourne and Metropolitan Board of Works plan (part) No. 1217 - Collingwood for the intersection, obtained for reference from the State Library of Victoria Collection of MMBW Plans. It shows the layout of the cables and the large sheave pit that the cable itself passed around. The trams were required to drop the cable from the grip prior to the entry to the curve and then coast around.
Photographer is possibly Keith Kings.
Significance
Yields information about the extent of work needed to convert the former Northcote Cable tram route to Electric trams, the people and the methods used to undertake the work.
Physical description
Photograph - Black and White of the demolition of the cable tram track at the corner of Queens Parade and Smith Street North Fitzroy.
Subjects
References
- MMTB Annual Report - 1955
