Historical information
Provides information about the works planned to realign tram tracks at the Metro Tunnel Anzac station, following the completion of the surface works. Gives timing, tram routes affected, plans of the proposals, contact details. All St Kilda Road routes would be affected from 27/11/2022 to 17/12/2022, tram stops would be closed, bus replacement services. includes works to remove the Glenhuntly Road level crossing at Glenhuntly Station.
Significance
Yields information about the trackworks for the future Anzac Station interchange and St Kilda Road services.
Physical description
Set of two documents issued by Rail Projects Victoria (Metro Tunnel) and Yarra Trams with regard to the reallignment of tram tracks at Anzac Station Nov. 2022
1 - Metro Tunnel - Works proposed, maps - 6 A4 pages
2 - Yarra Trams - Service Changes St Kilda Road works - 4 A4 pages.