Set of 30 colour prints, taken by C. Dean from 30/10/2004 to 2/1/2005 of the rebuilding of the sub-station and initial tramway operations.
.1 - Interior view of substation after transformer removed - 30/10/2004
.2 - ditto
.3 - ditto
.4 - ditto
.5 - G.Wood, A. Reither working on the re-building of the walls.
.6 - Temporary door
.7 - Sign on No. 39 - "There are no trams running today".
.8 - COTMA Storage shed frame at Bungaree - 2/12/2004
.9 - 38 outside shed, pending delivery of the transformer - 17/12/2004
.10 - 38 and 1 ditto
.11 - ditto
.12 - The box arrives - with forklift and G. Wood
.13 - unpacked
.14 - ditto - with P.Mong
.15 - ditto
.16 - ditto
.17 - P.Mong checking delivery
.18 - moving into position - G.Wood and P.Mong
.19 - ditto
.20 - ditto with Pallet mover.
.21 - In position
.22 - ditto
.23 - No. 40 being repainted
.24 - 38 and 1 outside the shed
.25 - framing the new walls
.26 - ditto
.27 - new device frame
.28 - The BTM big band - re-opening day - 26/12/2004
.29 - ditto - Sam Boon
.30 - No. 26 and that road traffic - cars! - Wendouree Parade - 2/1/2005
Inscriptions & markings
Each photo has on rear in ink "date", "number" and "Photo by Carolyn Dean"