Significance
Significant in being a detailed set of instructions for the Forest City signalling system that was operated by the tram's trolley pole. Details of the locations and crossing loops where used, primarily around the loop and through Bridge St. and how it operated. Prepared and printed by the SEC during 1965.
Physical description
Five page, foolscap duplicated document, stapled in two locations along the top edge, titled Forest City Signals, and dated 20-1-1965, giving details about the Forest City signalling system installed in Ballarat. Explains how the system operates, gives instructions, details of the system, location of the loops, trams following each other, power failure. Also gives details of how the Bridge St system operated and the switch at Grenville St. Gives instructions for running out of the depot.
Note: The locations of the signals are not as detailed as in the Driver Training Manual - See Reg Item 3486
See also Reg Item 5373 for another similar copy and fully scanned copy.