Document - Report, "Report on probably cost of construction of the Ballarat and Dunolly Tramway", 23/6/1857

Physical description

Report - 9 pages- handwritten, dated June 23 1857 to the Provincial Committee of the Ballarat and Dunolly Railway"



Prepared by Henry Smith Civil Engineer, looks as various aspects of a prolapsed timber rail / sleepered tramway plated, horse drawn, grades, earthworks. Gives a total cost of 2897 pounds.



Last page has a ink and washed sketch of the track structure - plan and cross section.



Only the cover, first page and last page imaged.

Back to top