Set of 15 Digital Images of the aftermath of the sub-station repairs, wiring it up and the installation of the isolating transformer taken between 11/12/2004 and 18/12/2004
.1 - Garry Wood with some concrete for the substation floor
.2 - Alan Snowball and Paul Mong laying the floor.
.3 - Part of the Switchboard modified to position the new Isolating Transformer
.4 - ditto
.5 - the Transformer arrives - 15/12/2004
.6 - being positioned in the depot
.7 - the manufacturers plate - Illawarra Transformers Wollongong
.8 - unpacked
.9 - being positioned
.10 - In position
.11 - the door to no where - the platform across to the store and archives yet to be built
.12 - some of the equipment installed but found not to be suitable for the purpose. Was ex an PTC sub
.13 - wiring it up
.14 - Paul working
.15 - the new control panel.