Physical description

Set of 10 Digital Images of the work involved in the repairs to tram No. 40 during the period 7/8/2004 to 26/12/2004.
.1 - No. 1 end panel removed
.2 - work to sand down underway - not top gutter rail.
.3 - Trolley with trolley pole bases
.4 - damaged to gutter metal work
.5 - close up showing the rust to the metalwork at No. 1 end drivers dash
.6 - removed panels
.7 - rust to the gutter metal work
.8 - Alastair Reither sanding one of the pillars
.9 - ditto
.10 - work progressing with undercoat and new timber panel - ex the packing case that arrived with the Isolating Transformer.