Physical description
Set of two pamphlets involved the concept of the "Route 96 Project - Have your say: Nicholson Street Early Designs". Notes the introduction of the E class tram.
.1 - DL full colour booklet, 24 pages with a questionnaire response form, outlining the Route 96 project to speed up trams providing route segregation for most of the distance. Issued 2013. Provides concept designs, Blyth St terminus, easy access stops, tram lanes. Gives dates for meetings.
.2 - fold out full colour map, 8 folds, printed both sides providing details of the planning for the various stops and segregation between Victoria Parade and Blyth St..
The loss of car parking and issues with the Fitzroy St St Kilda stop met a lot of opposition. The Blyth St terminus was rebuilt June 1015.
Two copies held., both were originally contained within a plastic wrapper. One wrapped version obtained when collected.
Produced by Public Transport Victoria.
See also Reg Item 24?? for a 2009 version.