Rock was unloaded from the tramway and placed in a barge for transportation down the North Arm to the Entrance
Physical description
Black and white photograph of the buffers beside the North Arm at the terminus of the tramway which carried rock from the Colquhoun quarry for forming the artificial entrance at Lakes Entrance Victoria.