Newspaper - JENNY FOLEY COLLECTION: HARD WORK

Historical information

Construction of the Waranga Basin initially took place 1905-1915 when it was dug by pick, shovel and horse-drawn scoops. It's embankment was initially 29ft high but over time this was increased to 40 ft. It is an off-river dam that is fed by diversion of water from the Goulbourn River and its aim is to provided irrigation water.

Physical description

Bendigo Advertiser ''The way we were'' from 2003. Hard work: steam dragline excavating silt from the Waranga Basin to supply water to the Rodney district during the 1938-39 drought. The clip is in a folder.

Back to top