Historical information
BHS Collection
Physical description
Bendigo advertiser ''The way we were'' from 2003. High hopes: construction of the tower access bridge at lake Eppalock in 1962. The bridge, which reaches into the intake tower, took about 2 months to build. It was built on the bank in sections and lowered into the water. The end of the bridge lay under 20 metres of water until lifted. The clip is in a folder.