Document - DRAINAGE PROBLEMS - ELLENBOROUGH FLOODED

Physical description

Handwritten copy of a report in the Bendigo Advertiser 24/5/1907. ''Serious break in Water Main which is situated about 100 yards south of the mine. Main service pipe which supplies Harveytown has been leaking for some time past. Water soaking through old surface workings into the Belmont & Saxby shaft where it rose 60 feet and filled two x-cuts, one out weat 208 ft, and the other out east about 45 ft. Ellenborough began baling on Sunday 26th May, and it will take many days before work can be resumed. The mine was only working one shift and no men were underground at time of in rush''.
Document from Albert Richardson Collection of mining history.