Historical information
The specification produced by the Metropolitan Transit Authority (The Met) for manufacturing, supplying, and delivering electric trams. Has three options for delivery - 200 four-axle trams, 100 four-axle and 60 six-axle or 120 six-axle articulated trams. The last was selected. Tenders closed 27/4/1984. The donor used the book to superintend the contract by Comeng Dandenong. Has many notes for future engineering reference. See htd7741doc.pdf for source details.
Significance
Demonstrates a specification document produced by the MTA for the B2 class trams.
Physical description
Bound specification approx 300 pages, with green cover and green comb binding. Has many loose sheets.
Inscriptions & markings
Extensive notes throughout document for future issues, and current queries.