Historical information
Drawing is marked up in red to show the proposed track work in LaTrobe St, noting junctions, crossings, and green for existing north-south tracks. Has a note that the cable track in Spencer St was to be converted and a junction installed at the corner of LaTrobe and Spencer Sts. This junction was not installed, just the curve into Spencer St.
Significance
Yields information about the LaTrobe St planning of the late 1940s.
Physical description
Drawing - marked up plan with red and green lines, folded with punch holes on the left hand side.