Historical information
Set of three negatives - two showing the excavation of Wendouree Parade for the installation of the track across the Parade to connect with the depot. The 1974-75 BTPS Annual reports recorded that track work commenced on Friday 22/11/1974 and was completed the following Monday. The 3rd photo shows tram 40 at the end of the access track pending the connection.
Significance
Yields information about the installation of depot junction trackwork by the BTPS
Physical description
Set of 3 x 35mm black and white negatives.