Historical information
Document dated 15-11-1999, titled "The Operational Performance Regime", prepared by Swanston Trams for Malvern Depot, training drivers about the DOI proposed tram monitoring system in relation to timetables, cancelled trams, short shunts, late running and early or late running monitored by the AVM system. Details the role of drivers, explains timing points, location of the points for each route, penalties, running times, and the importance of timekeeping. Part of the tram performance reporting system that was provided to passengers and possible ticket refunds.
Significance
Demonstrates the training paper provided to drivers to make them aware of the new monitoring system and the penalties that would apply to Swanston St for late running etc at the time of privatisation.
Physical description
Document - 9 A4 pages stapled in top left hand corner photocopied.