Document, M>Tram, "M>Tram operational performance regime (OPR) training manual, c2002

Historical information

Document titled "M>Tram operational performance regime (OPR) training manual" - undated, c2002 with a photo of B2 2078 on the front cover. Prepared for the training of fleet operations staff about the tram monitoring system in relation to timetables, cancelled trams, short shunts, late running and early or late running monitored by the AVM system. Details the role of staff, explains timing points, location of the points for each route, penalties, running times, and the importance of timekeeping. Part of the tram performance reporting system that was provided to passengers and possible ticket refunds. See item 8711 for a 1999 version.

Significance

Demonstrates the training paper provided to fleet operations staff about the monitoring of tram services and the timing points used for each M>Tram route.

Physical description

Document - 14 A4 sheets stapled in top left hand corner.

Back to top