0007-013. Bream A Project , Bass Strait 1987. The project is just starting. This photograph shows Anchor Handling Tug Supply (AHTS) vessels Lady Lorraine, Lady Cynthia, and Lady Carojine, Anchor Handling Tug (AHT)Lady Florence, and Derrick Barge DB 29 alongside Barry Beach Marine Terminal, Gippsland, Victoria. The DB 21 is taking on board equipment for the project prior to be towed out and positioned at the location in Bass Strait where the production platform Bream A will be installed.
0007-014. Bream A Project , Bass Strait 1987. Derrick barge DB 29 loading project equipment with Lady Lorraine alongside Barry Beach Marine Terminal, Gippsland Victoria. Also alongside the wharf is the barge Intermac 256 which is being prepared to having the Bream A Jacket (a Jacket is the base of the platform that will be landed on the sea floor and will then be pinned in place with piles driven down into the sea bed).
0007-017. Bream A Project , Bass Strait 1987. Helicopter on DB 29 helipad ready for take off with Lady Lorraine, Lady Gay and Lady Cynthia at Barry Beach Marine Terminal, Gippsland, Victoria.
0007-016. Bream A Project , Bass Strait 1987. Helicopter taking off from DB 29 with Lady Lorraine and Lady Gay at Barry Beach Marine Terminal, Gippsland, Victoria.
Green, with gold border trimming photo album, containing 38 photographs depicting ships, barges and the construction of the Bream A oil and gas production platform in Bass Strait, Victoria, Australia 1987.