Showing 435 items
matching new chum goldfields
-
Bendigo Historical Society Inc.
Newspaper - VICTORIA HILL - APPROVAL TO DEVELOP VICTORIA HILL
Newspaper article from the Bendigo Advertiser dated 23.4 .68. The Bendigo and District Tourist Association asked council's approval to develop an area of about eight acres surrounding the old Nell Gwynne Mine. They also asked that notices be put up to stop people dumping rubbish. The Royal Historical Society also requested that the Victoria Hill area be cleaned up. Article is glued to a piece of writing paper. It has Cent. Nell, Vict. Hill and New Chum written in blue pen along the side.newspaper, bendigo advertiser, victoria hill, victoria hill, approval to develop victoria hill, bendigo and district tourist association, nell gwynne mine, royal historical society, cent. nell, vict hill, new chum -
Bendigo Historical Society Inc.
Newspaper - VICTORIA HILL - 'NEW CHUM GOLD'
Newspaper article from 'Down the Mall' in the Bendigo Advertiser dated Saturday 2/5/1970. '' If the 'old boys' of the Victoria Hill area had been about yesterday when a party of school children inspected the old mining district, it is likely they would have sent off 'new chum' gold with the visitors. Back in the days when mining was active, most of the boys carried their bottle of 'new chum' gold - mundic made to sparkle with a few drops of vinegar. They gave willing help to people making their debut panning for gold and never failed to 'salt' the dish with 'new chum gold.''newspaper, bendigo advertiser, victoria hill, victoria hill, new chum gold, bendigo advertiser sat 2/5/1970 -
Bendigo Historical Society Inc.
Document - NEW RED WHITE & BLUE MINE - NEW RED WHITE & NEW CHUM RAILWAY MINE MANAGER'S REPORT 17/2/03
Handwritten extracts from the New Chum Railway Mine Manager's Report 17/2/03. Mine Manager W Hicks. Extracts: Machinery. New Boiler is giving every satisfaction. While bailing water after the Xmas holidays, one of the ropes broke with a full tank of water. The tank being fitted with safety appliances, acted. Therefore no damage was done to the shaft. The old ropes were taken off and replaced by two new ones of 2,500 feet each, with a breaking strain of 34 tons. Mine 7 machinery are all in good working order. 1925 - Portion of Cath. Reef battery sold to Big Blue.document, gold, new red white & blue mine, new red white & blue mine, new red white & blue mine manager's report 17/2/03, w hicks, cath reef battery -
Bendigo Historical Society Inc.
Photograph - NEW CHUM RAILWAY MINE - NEW CHUM RAILWAY MINE ENGINE BEDS
... PHOTO New Chum Railway Mine New Chum Railway Mine Engine Beds ...Black & white photograph of the New Chum Railway Mine Engine Beds. Photograph shows the engine beds on land beside the railway line. Signal and telephone pole at the line. In the foreground is grass and weeds. The engine beds are in the centre and behind them are a number of bushy trees. Written on the back of the photograph: New Chum Railway Mine, Engine Beds. 115 men employed here, 1899. A Richardson, 29 Harrison St. Bendigo.photo, new chum railway mine, new chum railway mine engine beds, a richardson -
Bendigo Historical Society Inc.
Photograph - NEW CHUM RAILWAY MINE - SITE OF NEW CHUM RAILWAY MINE SHAFT
... PHOTO New Chum Railway Mine Site of New Chum Railway Mine Shaft ...Black & white photograph of the Site of the New Chum Railway Mine's 4,318 feet shaft. Photograph is of a dug out area under some trees. The hole has some rubble, corrugated iron and a board in it. Written on the back: New Chum Railway Mine - Site of 4,318 feet shaft as at November, 1966. A Richardson, 29 Harrison St. Bendigo.photo, new chum railway mine, site of new chum railway mine shaft, a richardson -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - THE NEW CHUM REEFS AND SOUTH VICTORIA
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten notes on the New Chum Reefs (White & Black Leads) and South Victoria. Ref. Dicker's 23/11/1861 Pages 7 to 9. Notes include geography, Claims, Owners, Area & Title, Workings, Reef and Yield, Drainage and Remarks. Dates are 13/8/1861, 16/10/1861 and 11/9/1861.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, the new chum reefs and south victoria, dicker's 23/11/1861 pages 7 to 9, new chum company, bonatti's claim, gibbs & lazarus claim, phoenix company, south victoria, the black lead, messrs ballerstedt, garibaldi's company's claim, new chum company, m'dougall & co, m'dougall, inglis, menzies, dehan, the white lead, new chum quartz mining company, bonati and company, phillip bonati, woolcrow, albrecht, pragleman, mortinson, plumbreck, emmerling, sievis, denis's claim, messrs thompson and powell, geo denis, begelhole and company, mr begelhole, brown, begelhole, blackwell, hildebrand & co, begelhole & co, w begelhole, thomas brown, henry begelhole, john blackwell, watson & co, j b watson, gibbs, lazarus, local court grant, gibbs & lazarus claim, mr gibbs, mr lazarus, phoenix company's claim, pioneer company, henry jackson, sullivan, burrows, chambers, marshall, william gunther, klemin, fulton, brown, brown, anderson, first quartz mining company, burrow's & co's claim, hudson's, thomas burrows, w philips, george husdon's claim, george hudson, wybrant's claim, john wybrant -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - BENDIGO GOLDFIELD
... Lines of Reef Bendigo Goldfield Mines Dept New Chum Cons New ...Handwritten notes listing Bendigo Mines, their years of operation, ounces of gold taken out, Dividends, Calls, and depth of shaft. Some of the mines oly have the year they ceased operations mentioned. Dated 1/3/67.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, bendigo goldfield, mines dept, new chum cons, new chum united, eureka extd, south belle vue, old chum, new chum & victoria, lansell big 180, ellenborough, st mungo, sth st mungo, little 180, mining register 1893 - 1902 m d annual reports 1902 on, mines dept quarterly to 1892, south new moon, hercules, ironbark, ironbark south, central r w & blue, stanfield, hercules no 1, north nell gwynne, new chum syncline, central nell gwynne, carshalton b m l, napoleon bml, nell gwynne bml, nell gwynne reefs, monument hill, central deborah, north deborah, deborah, south deborah, neangar, lightning hill, alliance, shellbach, south virginia, catherine reef united, belmont & saxby, lady barkly, unity, vict quartz, new argus, new chum railway, garden gully united -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - NEW CHUM CONSOLIDATED COMPANY, S'HURST
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten notes from Se? Mines Reoprt Pages 46 & 47 on the Machinery at New Chum Consolidated Company, Sandhurst. Notes include boilers, Compressors, Battery and mentions plans. There is also descriptions of the machinery.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, new chum consolidated company s'hurst, se? mines report pages 46 & 47, shenandoah, garibaldi, mr john delbridge, pearl company -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - VICTORIA REEF GOLD MINES COMPANY
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Photocopied handwritten notes about the Victoria Reef Gold Mines Company. Extracts from Dickers M. Record Vol. 1 23/11/1861 Ps 2 &3. Extracts include Capital, Shares, Names of Directors and Manager, Workings, Main shaft size and depth, Cost of work and labour, Drainage, Pumping Plant and Engine House.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, victoria reef gold mines company, ballerstedt & co l l, dickers m record vol 1 no 1 23/11/1861 ps 2 & 3, edward cook esq, thomas burrows, henry jackson, alexander rose, david chaplin sterry, theodore ballerstedt, h b nicholas, cost of work & labour, canal basin foundry glasgow -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - NEW CHUM RAILWAY MINE MANAGER'S REPORT 1880 - 84
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten excerpts from Mine Manager's Reports from January 1880 to May 1884. Mine Manager Mr J Alderson. Items mentioned: telephones, mechanical breakdowns, air supply, trouble with flat ropes, water problems, leaning and testing boiler engines.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, new chum railway mine manager's report 1880 - 84, mr j alderson, o'rourke and henderson, allingham, aitkens, pandora, richard heals, flat ropes, young chum co, horwood's, old chum, harkness, crushing mill, g armstrong, roberts & sons, eureka coy -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - NEW CHUM SYNCLINE
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten notes mentioning the 9th, 10th and 15th level north and south of the C N Gwynne bdg and distances. Bulk of production from 9 level and intermediate below - ?document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, new chum syncline, c n gwynne -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - LIST OF REFERENCE NUMBERS FOR ALL MINING REPORTS
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten list of Reference Numbers for all Mining Reports. Fourteen References listed.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, list of reference numbers for all mining reports, mines dept. special edition australian mining standard 1/6/1899, mines dept booklet'bendigo goldfield' geo brown 1936, mines dept annual and quarterly reports, mines dept bulletin no 33 h. herman 1914, annals of bendigo, a. richardson, booklet 'healthy golden bendigo' 1906 public library bendigo, souvenir '200th dividend' , issue 'new moon' by directors 1/12/1906, mines dept bulletin no 47 structure of bendigo goldfield h herman 1923, publication 'the bendigo goldfield resources of the central area' victor j r pabst 21/2/1917, the bendigo goldfield registry j n macartney 1/3/1871, mines dept bulletin no 30 h herman 1914, bendigo amalgamated goldfields coy financial report 1920. mining sales catalogues j h curnow & son -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - NOTES ON JOHNSON'S REEF
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten notes mention 'History of Bendigo by G Mackay, St Mungo Line of Reef from the Belmont Mine, Princess Alexander Shaft, Johnson's no 1 Mine, North Johnson's with notes on buildings, etc and date 22/9/1892, and the Johnson's Reef Extended dated 29/10/1892, with note on building, mullock heap, and sill 779.18 above sea level. Also mentioned are Leo Chapman and Tom Sayers.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, notes on johnson's reef, history of bendigo, g mackay, mines' dept, st mungo line of reef, e j dunn report 21/10/92, princess alexander shaft, united devonshire shaft, johnson's reef, garden gully line, johnson's no 1 mine, north johnson's, e j dunn's report 29/10/1892, johnson's reef extended, leo chapman, tom sayers -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - NEW CHUM & VICTORIA LETTER & NOTES
... DOCUMENT Memo New Chum & Victoria Lines of Reef New Chum & Victoria ...Handwritten letter to Mr Blake with reference to meeting students and the changes in Bendigo. Mentioned are the Log Lock-Up, the Central Deborah Mine, the ex-manager of the mine, Mr Rowe acting as a guide, Victoria Hill and the Bendigo Pottery. The notes titled ''To replace Around the Goldfields'' mentions the Third Edition, 'Historic Guide to Bendigo', published in 1969 of land reclaimation schemes rapidly removing all traces of several mines. Those affected on the New Chum Line of Reef are; The Victoria Consols, Ironbark and Hercules and Energetic. The Sheepshead Line - the Ironbark and Ironbark South. On the Garden Gully Line - The Cornish United, Koch's Pioneer and Confidence Extended. The Paddy's gully Line - The British American, Lansell's Sandhurst (Needle) and the Collman and Tacchi. On the Derby Line - Johnson's No 3 (Nelson) and on the Hustlers Line are the United Hustlers and Redan and the K. K. Mines. Also a carbon copy of the notes.document, memo, new chum & victoria lines of reef, new chum & victoria letter & notes, mr blake, mr hattam, log lock-up, central deborah mine, mr rowe, victoria hill, bendigo pottery, historic guide to bendigo third edition, new chum line of reef, the victoria consols, ironbark, hercules and energetic, sheepshead line, ironbark, ironbark south, garden gully line, cornish united, koch's pioneer, confidence extended, paddy's gully line, the british american, lansell's sandhurst (needle), collman and tacchi. derby line, johmson's no 3 (nelson), hustlers line, united hustlers and redan, k k mines -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - NEW CHUM & VICTORIA MINE MANAGER'S REPORT - R JACKSON
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten extracts from the New Chum & Victoria Mine Manager's Report in the year 1886. Rob't Jackson the Mine Manager. Items mentioned are: Winding Engine, Pulleys at the end of Engine House, Poppet Legs, Boiler, Gas and New Winding Engines.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, new chum & victoria mine manager's report - rob't jackson, gas coy, rob't jackson, mine manager's half-year report august 1886 -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - NEW CHUM & VICTORIA MINE MANAGER'S REPORT
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten notes on New Chum & Victoria Mine Manager's Report. Dates 1878 and 1879. Wm. H. Grainger Mine Manager. Items mentioned are: amount of firewood, winding engine, mishap towinding gear, winding engine driver mistake, flat ropes, rope breaking, Directors deciding to replace flat ropes with round ropes, water laid on from main to mine, Directors decided to throw out present winding gear, old machinery being pulled down and all work stopped except repairs to shaft and alterations to pithead pulleys.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, new chum & victoria mine manager's report, wm h grainger, messrs mitchell of melbourne, north old chum, mitchell & osborne, middleton safety hooks, ar -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA LINES OF REEF - MINING MACHINERY, NEW CHUM LINE, EAGLEHAWK
... DOCUMENT Gold new chum & victoria lines of reef New Chum & Victoria ...Handwritten notes on mining machinery sold at auction. South St Mungo - Winding Engine. Pair of 15 ? Cyl. Winding Engines. 7 ft Winding Gear. Also Jackass Boiler. Feed Pump, Trucks, Rails, Flat Sheets, Poppet Heads, Housing, etc. Sold for 270 pounds. Purchaser H Ralph for Austral Drill Co. Lady Barkly Company - 12 inch Cylinder Winding Engine. 8 ft Winding Gear. Cornish Flue Boiler, Feed Pump, Rails,Poppet Heads, Housing, etc. Sold for 162 pound 10 shillings. Purchaser W. J. Sever, Mining Merchants, Melb. Crushing Battery - Complete 40 Head Battery. Tandem Compound Engine. 11 in & 22 in Cylinders. High Press, Boilers, Electric Lighting Plant. 6 in Cyl. High Speed Engine, Fire-proof, Feed Pump, Rails, Flat Sheets, Tools & Sundries. 1000 pound to R. Ralph. These three mining plants, complete. Sold by Messrs Bell, Lambert and Nixon - Auctioneers. Ref; Bendigo Advertiser. July 14th 1910 Page 2.document, gold, new chum & victoria lines of reef, new chum & victoria lines of reef, mining machinery new chum line eaglehawk, south st mungo, h ralph, austral drill co, lady barkly company, w j sever, crushing battery, messrs bell, lambert and nixon, bendigo advertiser july 14th 1910 page 2 -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA - NEW CHUM & VICTORIA MINE MANAGERS REPORTS
... DOCUMENT Gold new chum & victoria New Chum & Victoria New Chum ...Handwritten copies from New Chum & Victoria Mine Managers Reports. 9/11/1888 Cage caught in shaft reported by Wm Grigg. 9/11/1888 More abouth the cage being caught, reported by Mine manager R Jackson. 4/1/1889 Replaced rings in eastern winding engine. No water for 2 days as main burst at Bendigo Creek. 18/1/1889 East boiler leaking. Boilermakers in. Still leaked. 1/2/1889 East battery repaired. 15/2/1889 Water in shaft 15 galls an hour. Total depth from surface 2,134 feet. Wm Vinnard. M. Man. 7/6/1899 Firewood in stock, at ?indes, 552 tons at battery. Urgently require a 2nd boiler. Can only wind for 20 minutes, then stop for steam to rise before hauling. J Agnew Mine Manager.document, gold, new chum & victoria, new chum & victoria, new chum & victoria mine managers reports, wm grigg, r jackson, wm vinnard, j agnew -
Bendigo Historical Society Inc.
Document - NEW CHUM & VICTORIA - NEW CHUM & VICTORIA MINE MANAGERS REPORT
... DOCUMENT Gold new chum & victoria New Chum & Victoria New Chum ...Hand written copy of New Chum & Victoria Mine Managers Report. Robt Jackson Mine Manager. Mentioned are extracts of preparations for new Engine-house dated 5th March 1886 and extracts on Hauling Costs of mullock dated 19/3/1886.document, gold, new chum & victoria, new chum & victoria, new chum & victoria mine managers report, robt jackson, hauling costs -
Bendigo Historical Society Inc.
Newspaper - NEW CHUM RAILWAY MINE - LAST YEARS OF MINE CAPTURED IN POSTCARD FORM
Newspaper article titled 'Last Years of Mine captured in Postcard Form' from the Bendigo Miner, Thursday, December 15, 2011 by Ian Fenselau. Article mentions some history of the mine, how it got it's name, depth of the mine and it's comparison with the Victoria Reef Quartz. It also mentions the death of James Nolan when he fell down the shaft and studies of ventilation released by Dr Walter Summons. The machinery foundations are still visible in Golden Square.newspaper, bendigo, the bendigo miner, new chum railway mine, last years of mine captured in postcard form, ian fenselau, victoria reef quartz mine, james nolan, dr walter summons -
Bendigo Historical Society Inc.
Book - AUCTION SALES: MINING CATALOGUE AUCTION SALES
Blue, black & white Woolstar exercise book with black & white check pattern to the left and a world globe over the top. Name on the front: A Richardson. Written on the front: Mining Catalogue Auction Sales. Book contains Lot numbers and description for auction sales at various mines. Mines mentioned are: Central Blue Gold Mine 19/2/42, Big Blue 23/11/1938, South Blue, Hercules Consols 19/2/1942, South Virginia 19/2/42, New Prince of Wales 5/2/48, Golden Carshalton G M 19/12/1957, North Virginia 3/5/57, North Nell Gwynne 25/2/53, South Shaft Diamond Hill, New Don 21/10/48, Sheepshead Battery Site 21/10/48, Forbes Carshalton 9/7/47, South Virginia 9/7/47, East Clarence 31/8/49?, Deborah Surplus Equipment 31/8/49, Deborah No 2 Shaft, North Deborah 31/8/49, Hercules Main Shaft 19/6/1950, Stanfield Shaft 20/6/1950, United Crushing Coy Battery (Unity Carlisle) 20/6/1950, Toolleen Gold Mine 23/2/1950, Ironbark Gold Mine 6/10/49, Ironbark South 1/12/49, Hercules New Chum 1/12/49, Great Southern Gold Mine 10/4/47, New Chum Syncline 2/3/1950, Deborah Associated 19/4/195? And the Deborah Consolidated 19/4/1950. Further information of Bendigo Mines from The Gold Mining Registry Guide to Bendigo Mines by H Kirkwood, Eaglehawk. Published by W. Welch. Mines include Lazarus New Chum Reg'd & Lazarus New Chum No 1, Princess Alexandra, Ellenborough, Trio-Hauling Coy, South Catherine Reef G. M. C., Princess Alice, Central Catherine Co,Cravens New Chum Co N. L., Garibaldi Mining and Crushing Co, Williams United, Catherine Reef Claimholders G. M. N. L., New Chum & Victoria Reef, Johnsons (Garden Gully) Line, United Ulster, Garden Gully Rly Reserve, South Ulster, Ulster and Cosmopolitan Coys, Golden Gate and Lansell'sBig 180. Some information on the Moon Mines 24/6/67 South New Moon, New Moon, Nth New Moon and New Moon Consolidated.In the reverseof the book is some information on the Lazarus New Chum Mine, Lazarus No 1 and Lazarus Mines. Also mentioned are New Chum Rly and Victoria Quartz. In 1895 a large gold bearing reef in Lazarus at 3000 feet. Also Some extracts from E. C. Dunn's Report 13/8/92 on the Lazarus Mine Old Shaft and Lazarus Main Shaft at various depths.book, bendigo, mining auction sales, auction sales, mining catalogue auction sales, a richardson, central blue g m, big blue, south blue, hercules consols, south virginia, new prince of wales, golden carshalton g m, north virginia, north nell gwynne, south shaft diamond hill, new don, sheepshead battery site, forbes carshalton, south virginia, east clarence, deborah, deborah no 2 shaft, north deborah, hercules main shaft, stanfield shaft, united crushing coy battery (unity carlisle), toolleen gold mine - toolleen, ironbark gold mine, ironbark south, hercules new chum, great southern gold mine, new chum syncline, deborah associated, deborah consolidated, j h curnow, miss kirkwood, the gold mining registry guide to bendigo mines, h kirkwood, w welch, lazarus new chum no 1, mr g armstrong, princess alexandra, h hectmann, ellenborough, amos arblaster, trio hauling coy, catherine reef g m c, w burnside, st mungo reef, princess alice, central catherine co, big catherine, belmont, cravens new chum co n l, wm w barker, c edwards, ellesmere, garibaldi mining and crushing co, henry von der heyde, w martin, williams united, wm cook, john chynowth, catherine reef claimholders g m n l, churchill davidson, edgar l rosman, new chum and victoria reef, johnsons (garden gully) line, united ulster, james mccoll, james quick, garden gully reserve, south ulster, ulster and cosmopolitan coys, golden gate, geo lansell's big 180, signal of a mine, mr langridge, e clarke, j hattam, a llewelly, n murray, a richardson, new moon, nth new moon, new moon consolidated, lazarus new chum, lazarus no 1, new chum rly, victoria quartz, lazarus, e c dunn -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - BAILING OPERATIONS
Handwritten extracts from the Bendigo Advertiser 17/8/1910 Col. 2. Extract mentions Bailing Operations - A Week's Progress. Water at the Victoria Quartz lowered 139 ft for the week. Bailing carried out at Lansell's 180, Lazarus, New Chum Consolidated and New Chum Railway Mines. Cost of bailing about 200 pound per week and the Government is contributing half. The balance is being found from the Victoria Quartz, Victoria Consols, Ironbark, Hercules and Energetic and Lansell's Estate. Expenditure over 6 weeks has amounted to over 1200 pounds. ''Mr McBride, Minister for Mines,said work was to be continued for the present at all events. Mr Merrin, Chief Inspector of Mines, said the Dept's aim was to keep the whole of contributing mines on the New Chum line unwatered, and also to enable the Victoria Quartz to go on with its sinking. It was not however intended to introduce a pumping system for the present.''document, gold, drainage problems, drainage problems, bendigo advertiser 17/8/1910 page 3 col 2, victoria quartz, lansell's 180, lazarus, new chum consolidated, new chum railway, victoria consols, ironbark, hercules and energetic, lansell's estate, mr mcbride, mr merrin, new chum line -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - NEW CHUM MINES DRAINAGE PROBLEMS 1910
Handwritten extract from the Bendigo Advertiser 20/8/1910 Page 8. ''New Chum Mines. Unwatering of the deep levels is being carried on as expeditionsly as was expected by the authorities. In the last four days, the water has only been lowered 14 feet at the Victoria Quartz Mine. The water stood at the 3,226 feet level yesterday. The slow progress being made this week is no doubt due to the large quantity in the workings at some of the levels.'' From the Bendigo Advertiser 27/8/1910 Page 9. ''New Chum Mines. Very slow progress being made. At Victoria Quartz, the water was lowered 32 feet for the week, and is now at 3258 feet. New Chum Railway lowered the water 17 feet and the present level of the water is at 1796 feet. The Lazarus are raising water from 2157 feet. The water has ceased flowing into the New Chum and Victoria through the connecting level with the Lazarus Mine at about 2,500 feet. As the Victoria Quartz is down 4,614 feet, there is still a considerable quantity of water to get out before sinking of the shaft can be resumed.''document, gold, drainage problems, drainage problems, new chum mines drainage problems 1910, bendigo advertiser 20/8/1910 page 8 & 27/8/1910 page 9, new chum mines, victoria quartz, new chum railway, lazarus, new chum and victoria -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - NEW CHUM LINE DRAINAGE PROBLEMS 1910
Handwritten extract from the Bendigo Advertiser 27/12/1910 Page 2. ''The Victoria Quartz, having deepened its shaft to 4,614 feet, had to abandon sinking on account of an inrush of water from the flooded mines to the south on the line. The influx occurred on the 15th of June, and notwithstanding that baling has been carried on almost constantly the company has failed to get the water out. It appears that the deep ground will have to be abandoned, owing to the absence of some proper scheme to cope with the water.''document, gold, drainage problems, drainage problems, new chum line drainage problems 1910, bendigo advertiser 27/12/1910 page 2, victoria quartz -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - NEW CHUM MINES DRAINAGE PROBLEMS
Handwritten extract from the Bendigo Advertiser 16/1/1911 Page 3. ''Mr P. McBride, Minister for Mines to visit Bendigo to-morrow, Tuesday January 17th. Suggestions made that the water be lifted by electric pumps. Bailing with tanks had been tried for six months. Now abandoned.''document, gold, drainage problems, drainage problems, new chum mines drainage problems, bendigo advertiser 16/1/1911 page 3, mr p mcbride -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - VICTORIA REEF QUARTZ HALF=YEARLY MEETING
Handwritten extract of the Victoria Reef Quartz Half-Yearly Meeting from the Bendigo Advertiser Wed 18/1/1911 Page 5. The meeting lapsed for wantof a quorum. Director's Report states unwatering had been vigorously carried on with assistance of the Government. On 20 December, one rope gave out. After discussion, it was decided it was too costly to replace with the present financial condition of the Company. It was also considered that the cost of trying to reach the bottom reef cut in the New Chum Railway could not be continued by baling, as its cost proved too expensive, while it probably could be done profitably and effectively by electric pump, which is now subject to negotiations with the Mines Department.'' Also included is a Balance Sheetdocument, gold, drainage problems, drainage problems, victoria reef quartz half-yearly meeting, bendigo advertiser, 18/1/1911 page 5, new chum railway, mines department, balance sheet victoria reef quartz, ar -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - NEW CHUM MINES THE DRAINAGE QUESTION
Handwritten extract from the Bendigo Advertiser Jan 2nd 1911. ''In absence of Mr McBride, Minister for Mines in the country, officers of the Mines Department were inclined to-day to say much about unwatering the deep Bendigo mines, which is again a pressing problem. Owing to the breaking of the steel wire rope at the victoria Quartz mine, the trouble was intensified. An arrangement had been made by which the companies affected along the line should contribute, but two of the companies, it is stated, suspended operations. A scheme has been placed by Mr Stanfield before the parties interested, and the officers of the Mines Department expressed the hope that for the sake of the future of deep mining, some arrangement should be come to. Unless the companies show a disposition to help themselves substantially, the officers do not think it likely that the Government will co-operate. There are, it was added certain provisions of the Mines Act, and covenants in leases can be enforced, but there is no desire to compel the companies which have carried on in the face of great difficulties, to do anything reasonable.''document, gold, drainage problems, drainage problems, new chum mines the drainage question, bendigo advertiser 2/1/1911, mr mcbride, mines department, victoria quartz mine, mr stanfield, mines act -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - NEW CHUM DRAINAGE PROPOSALS
Six pages of handwritten notes regarding the New Chum Drainage Proposals. Extracts from the Bendigo Advertiser mentioning the rising of the water in the New Chum Mines. An Advertiser report 27/12/1910 mentions that deep mining will have to be abandoned owing to the absence of some proper scheme to cope with the water. An arrangement had been made by which the companies affected along the line should contribute to a scheme. Suggestions made that the water be lifted by electric pumps. Baling with tanks had been tried for 6 months and then abandoned. Directors Report Victoria Reef Quartz Jan 1911 mentions unwatering had been carried on with assistance of Government. On the 20th Dec, one rope gave out. Decided that replacing it and doing the necessary work could not be met in the present financial conditions. It was also considered that the costof trying to reach the bottom reefcut in the New Chum Railway could not be continued by baling as its cost proved too expensive, while it could probably be done economically & effectively by electric pump which is now subject to negotiations with the Mining Dept.' At the end of the report is a Balance Sheet.document, gold, drainage problems, drainage problems, new chum drainage proposals, bendigo advertiser 11/1/1911 page 7, victoria quartz, victoria consols, bendigo advertiser 5/7/1910 page 3, mr h v whitelaw, mines dept, insp ross, lansell's 180, 222, new chum consolidated, lazarus, bendigo advertiser 6/7/1910 page 7, 9/7/1910 page 9, drainage troubles, bendigo advertiser 8/7/ page 8, new chum railway, south belle vue, eureka ext'd, bgo adv 25/7 1910, 27/12/1910 page 2, rae's machine, bendigo advertiser 2/1/1911, mr mcbride, mines dept, mr stanfield, mines act, bendigo advertiser 16/1/1911 page 3, victoria reef quartz half yearly meeting 1911, directors report and balance sheet, geo paynting -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - INRUSH OF WATER AT THE VICTORIA QUARTZ
Two handwritten copies of a Bendigo Advertiser report 16/6/1910 Page 7. This is a longer version of 3600.14. It was thought that the rush of water was from a dam bursting in one of the other mines, but as the water showed no signs of slowing that theory was discarded. The temperature of the incoming water was much higher than the Victoria Quartz was accustomed to bail, and this circumstance is significent in view of the increased temperature of the water at the deep levels in the New Chum Railway. Some months ago, the water commenced to flow from the New Chum Railway workings into the New Shenandoah, which is the next mine north. The water rose so rapidly that a disaster was narrowly averted. The mines along the line were connected at different levels and with the cessation of bailing at the deep levels in the southern mines, it was only to be expected that the water would find its way north to the Victoria Quartz. The water raised from the operating mines under the direction of the New Chum Drainage Association, a yeart or two ago used to exceed six million gallons per month. At that time there were eight companies bailing water, and even then some of the plants, especially those at the deep mines, were severely taxed in coping with the water, and performing ordinary work. Since some mines had discontinued bailing, the water has been filling up extensive workings, and as was predicted in the ''Advertiser'' some time ago, the Victoria Quartz Company could not expect to succeed with its deep sinking project without making some special provision for raising the water, which ultimately would become a source of trouble. The Victoria Quartz Company was allotted a special grant of 10,000 pound to assist in sinking the shaft 1000 ft from the 4254 ft level. Under the conditions of the grant, the Company had to contribute half the cost of the sinking, and the raising of the water has also been an exensive item. For the present, all attention will be concentrated in lowering the water, and should the appliances prove unequal to the task the deep sinking scheme can only be accomplished by resorting to some comprehensive system of combating the water'.document, gold, drainage problems, drainage problems, inrush of water at the victoria quartz, bendigo advertiser 16/6/1910 page 7, mine reports 13/6/1910, victoria quartz, lansell's 180, mr stevens, mr w abraham, new chum & victoria mine, new chum railway, new shenandoah, new chum drainage association -
Bendigo Historical Society Inc.
Document - DRAINAGE PROBLEMS - MINERS SENSATIONAL EXPERIENCE AT THE VICTORIA QUARTZ
Handwritten notes from a Bendigo Advertiser report, Thursday June 16th 1910. Management had for some time been apprehensive that the flooding in the deep mines to the south would affect them. Lansell's 180 took the precaution of baling. On the Tuesday night the men at the Victoria Quartz had a sensational experience. The storage dam at 3324 ft level receives the overflow from the flooded mines to the south. The level connects with the 3310 level at the Big 180. The water flows uninterrupted into thestorage dam which has a capacity of about 270 tanks. The dam had been emptied on Tuesday morning and work continued until 10 pm that night. The platman noticed that the water was coming down the shaft in a regular torrent. They didn't take much notice as they thought it was a leakinig outlet valve on the ascending tank. At 11 pm the releiving shift came down the shaft and said that the dam at 3,324 ft must be overflowing. The velocity of the water pouring down the shaft increased and the men made a hurried exit from the bottom of the shaft which is down 310 ft from the 4.254 ft plat (a total depth of 4,564 ft). An inspection of the dam at the 3324 ft level found it to be overflowing. By morning (Wednesday) the shaft had filled, and the water rose to 7 ft in the plat at 4254 feet. Mining inspector hgave orders that men were not to go below the 3324 ft level. Baling continued without cessation at the Big 180 all day and could not lower the water. Drilling machines etc and a powerful air winch at the 4254 ft plat are under water. An inspection made of the 3100 ft level at the 180 mine where the workings are connected with the New Chum & Victoria showed that water was running strongly from that mine proving that the inrush was due to flooded water from the southern deep mines to the south.document, gold, drainage problems, new chum drainage scheme, miners sensational experience at the victoria quartz, bendigo advertiser 16/6/1910 page7, lansell's 180, big 180, new chum & victoria