Showing 284 items
matching rail track
-
Ballarat Tramway Museum
Photograph - Black & White Photograph/s, 14/10/1973 12:00:00 AM
Yields information about the BTPS volunteers constructing the Trackwork at the BTPS depot in 1973 and who was undertaking the work.Black and white photograph of the BTPS workers boring a hole in the rail for a fish plate in the rails on No. 1 Road, 14 Oct. 1973. Featured in photograph are Bill Kingsley, Peter Reece, Richard Gilbert, Louis Melli and Peter Winspur. Photographer not known.In red ink on rear of photograph "Bill Kingsley, Peter Reece, Richard Gilbert, Louis Melli and Peter Winspur prepare the rail boring machine to bolt and plate the first rail on 1 road to the depot fan. Sun. 14 October 1973." tramways, trams, btps, depot, track laying -
Ballarat Tramway Museum
Newspaper, The Courier Ballarat, "Bringing back the trams", Apr. 1973
Newspaper clipping from The Courier, ?/4/1973 of five members of the BTPS lifting a rail onto sleepers along the position of the access track. Features from Left (W. A. Doubleday, ? (behind a person), ?, L. Bounds and J. Bounds)date in pencil of "12?/4/73" in top right hand corner of cutting.trams, tramways, btps, track laying, museum establishment -
Ballarat Tramway Museum
Photograph - Colour Print/s - set of 9, 29/09/1972 12:00:00 AM
Set of nine colour prints of the drainage works and initial track construction carried out by the BTPS outside the depot on 29/9/1972. Photos with hand written captions on rear. .1 - Drainage works No. 2 Road, BTPS Depot .2 - ditto .3 - ditto .4 - ditto .5 - ditto, working in the pit by the level crossing .6 - Drivers eye view from Car 27, No. 2 road construction commencing - sleepers laid out with rail alongside. .7 - Construction of No. 2 road BTPS depot proceeds .8 - Time: 5.46 3/4 - Subject "The first blow" R. Gilbert, Sec BTPS drives the first "doggie" on the track connecting No. 2 road of the depot to Wendouree Parade. .9 - Time: 5.47pm. Subject: R. Gilbert, Sec BTPS drives the first doggie on the track connecting the depot to Wendouree Parade. Picture take of the first "doggie" being driven home.In ink on rear of each photo "23/9/72" and details - see abovetrams, tramways, depot, construction, gardens, buildings, btps -
Melbourne Tram Museum
Document, National Trust, "Trust News Victoria - Vol 27, No. 2, October 1998", Oct. 1998
Magazine - 48 pages - full colour print on full gloss or plain paper titled "Trust News Victoria - Vol 27, No. 2, October 1998". Contains a 24 page Annual Review or report of the Victorian branch. Has a number of items of tram and rail interest. page 6 - Decorative tram poles in Fitzroy St Kilda and Peel St North Melbourne page 7 - St Kilda Railway Station platforms page 8 - "Trams back on Track" about the return W class trams - has a photo of 750 in St Kilda Road with the Shrine of Remembrance in the background. page 7 of the annual report - Hawthorn Tram Depot and Heritage Tram Fleettrams, tramways, w class, st kilda, overhead, fitzroy st, peel st, hawthorn, hawthorn depot, national trust -
Melbourne Tram Museum
Document - Report, Australian Electric Traction Association (AETA), "Upfield Light Rail Conversion - A submission from the Australian Electric Traction Association" - AETA, Feb. 1989
Report - 40 A4 pages - photocopied - pinned in the top left hand corner with a brass folded clip - titled "Upfield Light Rail Conversion - A submission from the Australian Electric Traction Association, dated 23/2/1989. Addressed to Gail Moody of The Met about the proposal to convert the Upfield rail line to light rail and close the Sydney Road tram service. Has many suggestions, track diagrams, timetables and a copy the AETA's original submission of 10/5/1988.trams, tramways, upfield, aeta, sydney rd, route 19, conversion, light rail -
Melbourne Tram Museum
Pamphlet, Rail Projects Victoria, "MetroTunnel Newsletter", May. 2018
Pamphlet Series of 8 printed and digital documents - titled "MetroTunnel Newsletter issued by Rail Projects Victoria (formally Melbourne Metro Rail Authority). Reports on the changes to the Domain Intersection tram stops, track relocation during Easter 2018 and that the Tunnel boring machines are on the way. The machines are compared to the length and weight of E class trams. Includes station names Anzac Station. Has the logos of the State of Victoria and Rail Projects Victoria. Previous issues: down loaded from the Metro Tunnel website 22-10-2018 Issue 01 - June 2015 - i1.pdf 02 - December 2015 - i2.pdf 03 - May 2016 - i3.pdf 04 - May 2017 - i4.pdf 05 - October 2017 - i5.pdf 06 - May 2018 - i6.pdf - folded A3 sheet - Reports on the changes to the Domain Intersection tram stops, track relocation during Easter 2018 and that the Tunnel boring machines are on the way. The machines are compared to the length and weight of E class trams. Includes station names Anzac Station. 07 - October 2018 - i7.pdf - folded A3 sheets - reporting on work at Federation square and the station locations, some before and after photos and archaeological digs. 08 - September 2019 - i8.pdf - folded A3 sheet - report on traffic changes in Flinders St, the Tunnel boring machines, North Melbourne Station, progress at various sites. 09 - February 2021 - i0.pdf - folded A3 sheet, report on the tunnelling machine progress and a list of dates during 2020 along with notes on the Airport rail line.trams, tramways, metro tunnel, e class, domain interchange, domain junction, anzac station -
Melbourne Tram Museum
Book, M>Tram, Yarra trams, "Staff Booklet - Grand Prix 2002 - Plus football information", Feb. 2002
... track, how tram and rail routes operated, restricted parking... paper - 8 x 2 folds. showing location of the race track, how ....1 - Book - 36 pages including cover with fold out map at the rear, centre stapled, titled "Staff Booklet - Grand Prix 2002 - Plus football information" . Gives details of event for tram crews, event program and transport map, including shunting details, announcements, bus services, boarding points, toilets, other alterations. Published with the Yarra Trams and M>Tram logos on the front and rear cover. Date: 28/2/2002 to 3/3/2002. .2 - Fold out circuit map for 2002 Grand Prix - full colour printed on gloss paper - 8 x 2 folds. showing location of the race track, how tram and rail routes operated, restricted parking area, Metcard, where taxis and limousines could park, bicycle racks. On the reverse side has a detailed map of Albert Park showing the various race facilities and grandstands. .3 - as for above - 2000 event Grand Prix.trams, tramways, grand prix, ptv, formula 1, albert park, maps -
Melbourne Tram Museum
Document - Notice, Melbourne & Metropolitan Tramways Board (MMTB), "Reconstruction of Burnley Railway Bridge in Swan Street, Jun. 1969
Set of four notices regarding trackwork and reconstruction printed on foolscap paper. Signed by R. C. Drummond as Traffic Manager. .1 - Notice No. D1507 "Reconstruction of Burnley Railway Bridge in Swan Street - Sunday 13th April 1969" giving details of tram and bus rearrangements, procedure at the bridge for buses. .2 - Notice No. D1508 - regarding Burnley St rail bridge and the single line working that applied during the bridge reconstruction period - dated 10/4/1969. .3 - Notice No. D1546 about reconstruction of tram tracks in Collins St between Swanston and Elizabeth on Sunday 22 June 1969. Two pages, has been stapled in the top left hand corner. Gives bus and tram rearrangements. Dated 18/6/1969. .4 - Notice No. D1550 about reconstruction of tram tracks in Collins St near King St for 29 June 1969.. Two pages, has been stapled in the top left hand corner. Gives bus and tram rearrangements. Dated 24/6/1969.trams, tramways, mmtb, trackwork, burnley, swan st, signals, collins st -
Melbourne Tram Museum
Book, Norm Cross, "Around the Tracks", 2004
Book - perfect bound - card covers - 186 pages printed on off white paper + 32 pages gloss paper printed with a mixture of black and white and colour photographs. An autobiography of a Rail Worker (Preston Workshops) and Enthusiast Norman (Norm) Cross. Tells the story of Norm, his work at Preston Workshops, characters, work mates, his travels within Australia and overseas and family. Has photographs of his work, travels and family. Published by Norm Cross 2004.trams, tramways, preston workshops, mmtb, mta, railways, tramways, heritage -
Melbourne Tram Museum
Pamphlet, Keolis Downer, "Experts in all stages of Infrastructure Life Cycle", c2015
... Keolis Downer abilities in tram track and other rail based work... track and other rail based work including light rail, key ...Pamphlet - four fold A3, printed on heavy paper, titled "Experts in all stages of Infrastructure Life Cycle", advertising Keolis Downer abilities in tram track and other rail based work including light rail, key supplier international relationships, description of Yarra's network - statistics, photos of E 6001 and E 6005. Has centre page spread of the civil construction activities at tram stops, the rail bender and the reconstruction of the intersection of Nicholson and Victoria Parade intersection. Has Keolis Downer and Yarra Trams logos.trams, tramways, yarra trams, construction, keolis, victoria parade, nicholson st, trackwork, overhead, statistics -
Melbourne Tram Museum
Document - Report, Bob Vanselow, "Upgrading the tracks of Melbourne's Street Tramways", 1979
Report - comb bound 63 pages + appendices 30 pages - titled "Upgrading the tracks of Melbourne's Street Tramways", written by Bob Vanselow, MMTB Project Engineer and presented to the Third International Rail Sleeper Conference Brisbane September 1979. The paper looks at the then current system, historical track methods, current track laying methods and parameters, special work, crossings, joints, concrete mixes, design, open ballast track. The appendices has various diagrams and photographs showing track construction details. Hard copy added 29/3/2020 - received and printed in an e-mail dated 28/4/2011, from Bob Vanselow - See Reg Item 4431 for details.trams, tramways, track, mmtb, track laying, construction, sleepers, rails, points -
Melbourne Tram Museum
Document - Report, Metropolitan Transit Authority (MTA), "MTA Engineering & Maintenance Change Projects", 1987
Photocopied 140 page document titled "MTA Engineering & Maintenance Change Projects", produced by the MTA, 11/12/1987 setting out the proposal changes to MTA staff, use of contractors, consultation with the unions, consultation with unions, has a table of contents, index. Looks at construction activities, building maintenance and track maintenance, electrical and vehicle maintenance for the rail and tram divisions.trams, tramways, ptc, unions, tramways, railways, mta, workshops -
Melbourne Tram Museum
Document - Report, Public Transport Corporation (PTC), "PTC Transport Hub Projects", 1992
Reports and associated documents for the PTC Transport Hub Projects - Better Cities Funding - Commonwealth and State Government projects - 1991 through to 1995. .1 - list of projects, timing, source of funding, project description and timing - about 25 sheets. .2 - four sheets stapled - providing a timeline for the Mill Park Light Rail project and tram system overhead renewal projects. .3 - six sheets - listing the tram projects - overhead, automatic points, track renewal and giving time lines in a Gantt chart. .4 - Newspaper cutting advertising for the pre-qualification of contractors for PTC electric traction - rail and tram as part for the Transport Hub project; - The Age 20/5/1992trams, tramways, ptc, funding, mill park, overhead, trackwork -
Melbourne Tram Museum
Photograph - Black & White Photograph/s and Illustration, c1925
... ballast under the track, the guard rail provided on the curves... (c1925). Note the clean ballast under the track, the guard rail ...Black and white photograph of a illustration of the Royal Park Tramway reproduced from a report The photo is titled: "Section of West Brunswick Electric Tramway Through Royal Park" The newly constructed permanent way viewed from just south of the Melbourne to Fawkner railway embankment (c1925). Note the clean ballast under the track, the guard rail provided on the curves using non grooved rail, the new platform stop and the timber picket fence around the Zoo. Refer to article "A Winding Road" on the Melbourne Tram Museum website for more details. http://www.hawthorntramdepot.org.au/papers/westcoburg-2.htmtrams, tramways, royal park, west brunswick electric tramway, track laying, rails, reserved track -
Melbourne Tram Museum
Newspaper, The Age, “Tram boost to help ease footy crowd crush”, 1/04/2019 12:00:00 AM
Newspaper clippings titled: “Tram boost to help ease footy crowd crush” Newspaper clipping from the Age 1/4/2019 by Timna Jacks - Transport Reporter More than 100 extra tram services on routes 70, 75 and 48 scheduled for this weekend for the football this weekend due to planned rail shutdown on the Frankston line. Tram tracks on routes 48, 70 and 75 have not been upgraded to carry E-class trams, but PTV will prioritise C, D and B-class trams for these routes.trams, tramways, public transport, route 70, route 48, route 75 -
Melbourne Tram Museum
Newspaper, The Age, “Tram crashes rise on crowded roads”, 3/07/2019 12:00:00 AM
Newspaper clippings titled: “Tram crashes rise on crowded roads” Newspaper clipping from the Age 3/7/2019 by Timna Jacks & Rachael Eddie Trams crashing into pedestrians at highest rate for 5 years, up from 35 in 2014 to 51 in 2018 according to Transport Safety Victoria annual safety report. Mobile phones and headphones considered to be major distraction for pedestrians. More than 70% of crashes caused by cars turning or merging onto tram tracks. 15% increase in number of times trams crashed into cars or trucks with 1122 incidents reported. Total number of people falling has nearly doubled from 180 in 2014 to 380 in 2018. Refer to htd3242doc.pdf for the 2018 Transport Safety Victoria statisticstrams, tramways, statistics, annual reports, accidents, rail safety, ptsv -
Melbourne Tram Museum
Photograph, Peter Rufus, rail used in the construction of Essendon depot in 1906, 2006
Set of two digital images of rail used in the construction of Essendon depot in 1906, marked "Carnegie 1906". See item 6809 for an actual piece.trams, tram track, tramways, essendon depot, nmetl, construction -
Melbourne Tram Museum
Photograph - Black and white - Track cleaner No. 6, 1940s
Photograph of MMTB Track cleaner - dust vacuum car No 6 at Preston Workshops. Reference page 76 of Destination City says the tram was built in 1915 by the Prahran and Malvern Tramways Trust as a general works car and rail flusher and further modified by the MMTB adding the vacuum equipment to try to control dust. Became known as No. 6 in 1934. Was out of use from the early 1940s and scrapped in 1948. Photo possibly early to mid 1940s.Yields information about track cleaner No. 6Black and white photograph on paper.trams, tramways, tram 6, track cleaner, preston workshops -
Melbourne Tram Museum
Slide - Set of 7, Keith Caldwell, 17/06/1971 12:00:00 AM
Set of seven Agfa colour slide, blue and white plastic mount, photo by Keith Caldwell of a track deviation during the construction of the Alexandria Avenue underpass at the north end of St Kilda Road. Shows the deviation, temporary track ("on the fly), overhead works and after the bridge has been completed, the permanent track brought into use.. All have the Arts Centre in the background. Slides 1 to 4 - 17/6/1971, 5 to 7 - 20/6/1971, after the change over from the temporary track to the permanent track. .1 - W6 919 outbound, East Malvern Route 3 - has a large gantry beam in the background and an advertisement for briquettes and Norton Bear tape. In the background is the National Gallery of Victoria building. .2 - W2 819 outbound, route 8 Toorak, with Shrine of Remembrance in the background. .3 - W2 389 ditto for Glen Iris, Route 6 .4 - W2 349 outbound for East Brighton, route 64 and inbound W2 633, city, route 67. .5 - SW6 854 inbound using the new track on the bridge, but temporary track remains in front of the tram. Overhead crews at work. W5 768 following. Both trams are travelling on the wrong line or "bang road" Tram have a Stillwell Ford and Ferris Car radio adverts. .6 - SW6 905 inbound, route 67. Also running wrong line. In the background is a rail mounted overhead trolley tower and Bedford truck MZR129. .7 - SW6 845 in bound route 8 followed by SW6 854, route 72. Both trams are running on the wrong line. An excavator in the background is working on removing the deviation track. 845 has various adverts including one for Uniroyal Tyres..1 has in pencil "17.6.71" and "Alex Av Opass constrn" and .7 "20.6.71"trams, tramways, st kilda rd, temporary track, trackwork, overhead, alexandra ave, princes bridge, bridges, route 3, route 67, route 64, route 8, route 6, route 72, w6 class, w2 class, tram 919, tram 905, tram 819, tram 389, tram 349, tram 633, tram 854, tram 768, tram 845, tram 854 -
Melbourne Tram Museum
Photograph - Digital Image, Public Transport Victoria (PTV), "St Kilda Road and High Street - Buses replace trams - Sunday 13 Oct. to Sunday 27 Oct.", Oct. 2019
.1 - Pamphlet - 2 x 3 fold x titled "St Kilda Road and High Street - Buses replace trams - Sunday 13 Oct. to Sunday 27 Oct." 2019 for works at Domain, Park and St Kilda Road and track relay in High Street between St Kilda Road and Williams Road. Gives alternative bus routes. Part of the work was for the construction of the Noise Box or acoustic shed over the future Anzac Station site - part of the Metro Tunnel Works and track relocation. See htd3930i2.pdf for a detailed description of the work from the Metro Tunnel authority - Rail Projects Vic. This file does not want to open properly using dbtext works, access directly. Image i3 - from tdu website https://tdu.to/m/262235/re-d2-5005-at-temporary-tram-termin-us-st-kilda-road, shows the works underway. Posted by Metro Tunnel on twitter today showing progress on relocating tram tracks at site of Anzac station. This will allow construction of the southern box of the station. Large file (~2.6MB and 4096x2733 pixels, but enables you to get "up close and personal".trams, tramways, park st, domain junction, metro tunnel, toorak rd, st kilda rd, tramway construction -
Melbourne Tram Museum
Photograph - Set of 6 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), c1959
Series of six black and white photographs of plastic coated rail being sprayed and laid in Swan St Richmond during the late 1950's. Includes photos of a sample rail, application and the location between the treated and untreated rail. See also Reg item 4517 On the photographic box with the photos was a date "11/59" - See MMTB Board minute of 22/1/1959 for a mention of this.trams, tramways, track laying, track materials, trackwork, swan st, rails -
Melbourne Tram Museum
Photograph - Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), late 1964
Black and white photographs of Swan St Richmond looking east from near Punt Road - shows the plastic coated rail laid during the late 1950's. See also Reg item 4516 for photos of the methodology. On the photographic box with the photos was a date "11/59"trams, tramways, track laying, track materials, trackwork, swan st, rails -
Melbourne Tram Museum
Photograph - Set of 12 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1966
Series of 12 black and white photographs of the trackwork on the MMTB system. .1 - demolished track at a junction .2 - section of rail showing the flangeway missing .3 - junction plates between different weight railway . .4 - wood blocked track showing broken joint and failure .5 - ditto .6 - V crossing ,7 - ditto at a wooden sleepered crossing with puppy dog spikes. .8 - crossing possibly between tram and rail .9 - H crossing rail showing broken joints and wear .10 - ditto .11 - section of rail pumping - waterlogged .12 - damaged joint, pumping, broken joint plate.trams, tramways, trackwork, rails, points, crossover, track materials, track repairs -
Melbourne Tram Museum
Photograph - Set of 12 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1966
Series of 8 black and white photographs of the trackwork equipment and tools on the MMTB system. .1 - Hydraulic drain cover lifting device. .2 - rack of jack hammers being lifted - St Kilda Road? .3 - length of rail being lifted by 12 men with MMTB equipment in the background. .4 - Pack of sleepers being lifted with many wood blocks in the background. .5 - pack of 12 jack hammers in their lifting rack. .6 - light weight tool being used to lift a track pit cover by two men. .7 - One man demonstrating the lifting of a 44 gallon drum. .8 - two men rolling a 44 gallon drum off a truck.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment -
Melbourne Tram Museum
Photograph - Set of 5 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1966
Series of 5 black and white photographs of the trackwork used at specific locations:\ .1 - plated curve of embedded plates for spandrel clips retaining the rails - would have allowed access. .2 - joint between rails - bridge expansion? In a temporary position. .3 - track being laid over a rail based bridge deck. .4 - track being laid or positioned for a bridge or replacement - possible slot beam and cable track in the background. .5 - temporary track over a bridge abutment or structure under construction.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment, bridges -
Melbourne Tram Museum
Photograph - Set of 15 Black & White Photograph/s, Melbourne & Metropolitan Tramways Board (MMTB), 1950's
Series of 15 black and white photographs of the track works to reconstruct tram lines showing various methods and works during the 1960's. .1 - Jackhammers concrete out around wooden sleepers - the rails have been bolted to them. .2 - Excavated track or temporary track next to newly relaid track - Hawthorn Road by Caulfield Park? .3 - Partly completed work - nearest track relaid, second track still has wood blocks? and then a temporary track. .4 - Excavated previously concreted and bolted track. Appears to be new rail. .5 - Compacting a new track bed with work laying track in the background. .6 - Rail being craned into position onto small concrete blocks - Nicholson St North Fitzroy at Church St - the church is now Melbourne City Mission Palliative care centre. 1955/56 - construction of the replacement track. Note the Hail bus stop sign on the corner. .7 - Thermite welding being set up. .8 - after a Thermite welding joint completed. .9 - track reading for pouting concrete, with a rebuilt track alongside and temporary track on the other side. .10 - ditto .11 - Concrete being poured .12 - ditto - could be Maribyrnong Road bridge replacement. .13 - Screeding off the concrete - possibly Nicholson St North Fitzroy .14 - completed surface - location as above .15 - completed surface with cloth covers to assist the concrete being cured. Has a MMTB hut and two worker amenity buses alongside. - location as above.Some photos have pencil marks on rear.trams, tramways, trackwork, rails, track materials, track repairs, sleepers, equipment, concrete, welding, nicholson st, new tramway, buses -
Melbourne Tram Museum
Functional object - Material sample, rubber boot for a rail, 2002
Material sample - rubber boot and associated notes: 1 - rubber extruded section that was secured around the base and sides of the rail and held in position with metal clips. Made for 41 kg/m tramway rail. 2 -Note printed on A4 paper about the section, its use, where and who - John Holland 2002, between Union Road and Box Hill, enables some track resilience and electrical isolation. 3 - Envelope addressed to Keith Kings from Ken Hall of Preston Workshops with a hand written note about the product and its use. Received August 2003trams, tramways, trackwork, box hill, track construction, rails, civil engineering, tram 106 -
Melbourne Tram Museum
Document - Specification, Melbourne & Metropolitan Tramways Board (MMTB), "Design, Manufacture and delivery of 100 only all-electric trams", Jun. 1965
Specification or Tender Document - titled "Design, Manufacture and delivery of 100 only all-electric trams", and "Background Information and Preliminary Specification", dated June 1965. Bound into a brown foolscap card cover. Details the conditions of tender, conditions of contract, notes, specification, gives background information about Melbourne, dimensions, performance, drivers and conductors, trucks, wheels, brakes, electrical equipment, control panels and drawings. The drawings give a map of the system, typical city route, Glenferrie Road route (grade diagram), concrete track construction, min. radius curves, loading gauge, all-electric tram and mounting details for the trolley base, schedule of prices, tender form, form of contract, schedule of information to be provided by the tenderer. Comprises: 1 - Conditions of Tendering - 1 page 2 - Conditions of Contract - 4 pages 3 - Contents - 3 pages 4 - Notes for prospective tenderers - dated June 1965 5 - General nature of contract - 21 pages 6 - Appendix A - climate data - two sheets 7 - List of 14 appended drawings 8 - O.6887A - cross section of trolley wire 9 - P.13855 - Glenferrie Road, Longitudinal Section 10 - P.13856 - Wattle Park Route 11 - P.13857 - East Preston Route 12 - P13858 - Concrete track construction 13 - P13859 - Open track construction 14 - P.13860 - Paved ballast track construction 15 - P.13887 - Tram Route - locations of substations and section switches 16 - P.13888 - Minimum radius service curves to give minimum clearance between tramcars 17 - P.13889 - Grooved Rail - 102 pounds per yard and tire profile 18 - R10-301 - Loading gauge, proposed electric tramcars 19 - R9706K - Rolling stock data, tramcars 20 - R10306 - Collins Points Shifter - Wiring diagram. 21 - Schedule of data to be supplied by the tenderer 22 - notes on Automatic Points shifters - 2 sheets 23 - Tender prices and delivery periods - 2 sheets. See Reg Item 2266 for the 1972 version and 1583 for the August 1966 version. See Reg Item 4049 for associated newspaper cuttings. See file htd4667i1.pdf for scans of the drawings.In ink in top right hand corner - "Lees"trams, tramways, specification, tenders, z class, mmtb, melbourne -
Melbourne Tram Museum
Photograph - Digital Image, Sydney Road, Coburg, looking south from near Bell St, c1920
Digital Image of Sydney Road, Coburg, looking south from near Bell St, showing the track repair work to remove bricks from the rails that were resulting in damage to the track foundations by letting water into the track. Photo supplied for identification purposes May 2020, by the Editor, Australian Railway History - see htd4680doc for email correspondence. Image belongs to the ARHS NSW Div. Rail Resource Centre No. 117413 Was used in the June 2020 issue of Australian Railway History - see Reg Item 4684. In the background are the Commercial Bank of Australia, A. M. Hadden Chemist, Walkers Stores, Joblings Boots, a Lending Library with advertisements for "The Age", "The Argus" and "The Herald".trams, tramways, sydney road, coburg, track repairs, trackwork -
Melbourne Tram Museum
Photograph - Black & White Photograph/s, 2009
Set of two Photographs printed on A4 sheet, photocopy - of the rail tram level crossing at Glenferrie Road, Kooyong showing the rubber inserts and the level crossing - taken from the cab of a train in either direction. Shows the level crossing, platform and track, along with part of the signal box and boom barriers.1 - "Looking away down track from Melbourne - Glenferrie Rd Kooyong Station - 2009" 2 - "Looking towards Melbourne up track - Glenferrie Rd Kooyong Station - 2009"trams, tramways, kooyong, level crossings, glenferrie road, tramway square, railway squares