Showing 3 items
matching gellibrand; ballast; railways; siding;
-
Otway Districts Historical Society
Photograph, Gellibrand Ballast Siding, c.1902, c.1902
... gellibrand; ballast; railways; siding;...; railways; siding; Photograph; B/W. Gellibrand Ballast Loading Site ...In 1902 a ballast siding was opened 4km south of Gellibrand to provide materials for track construction. A spur siding, with points facing Beech Forest and a capacity for six trucks, was cut into the side of a slope. Above this was erected a loading bin and chute. The stone proved to be of durable quality so the siding continued in commission after 1902 for track re-ballasting work. By the mid-1920s Victorian Railways found it more economic to use ballast from Penshurst, so the siding was closed by 1925 and the rails lifted.Photograph; B/W. Gellibrand Ballast Loading Sitegellibrand; ballast; railways; siding; -
Otway Districts Historical Society
Photograph, Gellibrand Ballast Siding, c.1920
... ; railways; B/W. Gellibrand Ballast Siding loading ballast down ...During construction of the railway in 1901 a ballast siding was originally opened 4.5 km south of Barongarook but the ballast proved inferior and a new ballast siding was opened 4 km south of Gellibrand to provide material for track construction. A spur siding, with points facing Beech Forest and a capacity for six trucks, was cut into the side of a slope. Above this was erected a loading bin and chute. This stone was of durable quality so the siding continued in commission after 1902 for periodic track re-ballasting. By the mid-1920s Victoria Railways found it more economic to use ballast from elsewhere so the siding was closed by 1925 and the rails lifted.B/W. Gellibrand Ballast Siding loading ballast down the slope, with five workmen watching at the base.gellibrand; ballast; railways; -
Otway Districts Historical Society
Photograph, Gellibrand ballast pit siding, c.1902
... ; railways; B/W. Gellibrand ballast pit siding at 19 miles (30.6 km ...In 1902 a ballast siding was opened 4 km south of Gellibrand to provide materials for track construction. A spur siding with a capacity for six trucks was cut into the side of a slope. Above this was erected a loading bin and chute. The stone proved to be of durable quality so the siding continued after 1902 for periodic track re-ballasting works. The points were set for the main line and spiked shut when the siding was not in use. By the mid-1920s the Victorian Railways found it more economic to use ballast from Penshurst, so the siding was closed by 1925 and the rails lifted.B/W. Gellibrand ballast pit siding at 19 miles (30.6 km) south of Colac. gellibrand; gellibrand siding; railways;