Photograph, Victorian Railways, Gellibrand Ballast Siding, c.1902, c.1902

Historical information

In 1902 a ballast siding was opened 4km south of Gellibrand to provide materials for track construction. A spur siding, with points facing Beech Forest and a capacity for six trucks, was cut into the side of a slope. Above this was erected a loading bin and chute. The stone proved to be of durable quality so the siding continued in commission after 1902 for track re-ballasting work. By the mid-1920s Victorian Railways found it more economic to use ballast from Penshurst, so the siding was closed by 1925 and the rails lifted.

Physical description

Photograph; B/W. Gellibrand Ballast Loading Site

Back to top