Historical information
During construction of the railway in 1901 a ballast siding was originally opened 4.5 km south of Barongarook but the ballast proved inferior and a new ballast siding was opened 4 km south of Gellibrand to provide material for track construction. A spur siding, with points facing Beech Forest and a capacity for six trucks, was cut into the side of a slope. Above this was erected a loading bin and chute. This stone was of durable quality so the siding continued in commission after 1902 for periodic track re-ballasting. By the mid-1920s Victoria Railways found it more economic to use ballast from elsewhere so the siding was closed by 1925 and the rails lifted.
Physical description
B/W. Gellibrand Ballast Siding loading ballast down the slope, with five workmen watching at the base.