Physical description
Handwritten on foolscap paper, with red seal on last page
Inscriptions & markings
.1) The Subcontractor is also to remove the following [ ? ] from Mr Webb's paddock ... to the Madame Bent Mine Grenville ...
.2) Specification for the taking doan, removal and reerection 2 Engines 2 boilers pumping gear, Bob, Poppett heads and Capstone etc, for teh Mdame Bent G.M.Cy Grenville.
The company will provide ...
.3) Morey's Coys yard, together with holding down bolts, and the following ...
.4) to the extent of Bed ...
Carpentry Work - To carefully take down the poppet heads and co... and erect the same on the claim complete ...
.5) Engine Framing as shown for the winding engines and pumping engines. Properly fitted to get ...
.6) The boilers to be fed in front. The contractor to cut and drill all necessary holes in the boilers and pipes - to fire blow ...
The contractor to make good any damage or breakage or loss to machinery or any part hereof that may occur to it during the removal of the reerection of same. The loss or damage, if any, not being made good by the contractor, or in the event of the works not being proceeded with to the satisfaction of the Company;s Engineer, The company's Engineer hereby ...
.7) of the whole of the works, and in default thereof the COntractor shall forfeit the sum of two pounds ...
Signed James Malcolm
Witness L. Menz
The Common seal of the company was affixed this thirteenth day of December:/86 by its manager James Burrell in the presence of [illegible] managers
Seal - Madame Bent Gold Mining Company Durham Lead Buninyong