A porter illegally in the signal box moved the points under a train coming into the south platform from a siding. The 5th carriage took two lines as shown, and brought down the overhead stanchions over both the passenger and goods lines. For about 36 hours, the service beyond Mitcham was maintained by steam trains connecting with electrics at Mitcham. Men are pictured putting up temporary overhead stanchions over the passenger lines around 10 a.m. on Saturday 22/6/1945 and another photograph shows the steam crane near the signal box lifting the Melbourne end of the derailed carriage. The other picture is on the same day 22/6/1945 of A2 engine at Box Hill.
See also Item 11003 for another photo of the derailment.