Plan - plans, Metropolitan board of Works, Metropolitan Board of Works plans of North Ringwood retarding basin, energy dissipaters and spillway details, 1979, 31-May-79
Untitled image
Reuse this media
Can you reuse this media without permission?No (with exceptions, see below)
Conditions of use
All rights reserved
This media item is licensed under "All rights reserved". You cannot share (i.e. copy, distribute, transmit) or rework (i.e. alter, transform, build upon) this item, or use it for commercial purposes without the permission of the copyright owner. However, an exception can be made if your intended use meets the "fair dealing" criteria. Uses that meet this criteria include research or study; criticism or review; parody or satire; reporting news; enabling a person with a disability to access material; or professional advice by a lawyer, patent attorney, or trademark attorney.
Attribution
Please acknowledge the item’s source, creator and title (where known)
Plans made by the Metropolitan Board of Works in May 1979 detailing 1. energy dissipaters for existing drains at the North Ringwood Retarding basin. 2 spillway details
Physical description
2 A3 pages with drawings of Melbourne Metropolitan Board of Works of the North Ringwood retarding basin