Physical description
ARCHITECT DRAWING OF CLUNES PRESERVING BOILER HOUSE
.1 DATED 12 MARCH 1897
.2 DRAWING "BUILDING OF THE BOILER", LONGITUDAL ELEVATION APRIL 1987
.3 DRAWING NO. 1 DATED 12 MARCH 1897
.4 DRAWING OF MAIN BUILDING TESTING ROOM
.5 DRAWING OF CAST IRON RING AND WROUGHT IRON COVER TO BOILER 21/4/1897
Inscriptions & markings
.5 THESE ARE THE DRAWINGS REFERRED TO IN TENDER DATED 9 DAY OF APRIL 1897 FOR BUILDING BOILER AND OTHER WORK AT THE LOTHAIR BOILER HOUSE, DATED AT CLUNES THIS 29 DAY OF APRIL 1897
SIGNED BY THE CONTRACTOR, WITNESS TO SIGNATURE HARRY SANDO